Skip to main content
24/7 Emergency(602) 675-1555

Commercial Plumbing: Rules in Phoenix-Area Cities

Grease interceptors, FOG programs, industrial wastewater and tenant improvements. City by city, then the Arizona law and model code behind it.

By City

CityWhat the rule says
Valley-WideGrease Interceptor Records and Inspections by Valley City

Every Valley city compared here wants grease interceptor cleaning and repair records kept at the business for three years and shown on request. Chandler lists what each record must show, including a county-licensed hauler. Phoenix inspects unannounced, and the Fountain Hills Sanitary District inspects at least once a year.

Grease Trap and Interceptor Rules by Valley City

Each Valley city sets its own grease rules, because Maricopa County leaves sizing to cities. Phoenix, Mesa, Scottsdale and Tempe allow an indoor grease trap only with four or fewer fixtures and no dishwasher. Required pumping runs from every 30 days (Phoenix traps) to every 180 days (Glendale), and enzymes never replace pumping.

Industrial Wastewater Pretreatment Permits by Valley City

Significant industrial users need a city wastewater discharge permit before they discharge, and smaller users can be pulled in when their discharge could harm the sewer. Apply early: Scottsdale wants the application 180 days ahead and Gilbert 90. Phoenix wants pretreatment plans approved before building plan submittal.

Which Businesses Need a Backflow Assembly in Each Valley City

Phoenix, Mesa, Scottsdale and Glendale name restaurants on their lists and require an RP assembly or air gap. Surprise and Goodyear require one on commercial or all connections. Tempe, Gilbert and Chandler judge the hazard. Every required assembly gets a yearly certified test (Phoenix 37-144, Mesa 8-1-8, Scottsdale 49-62, A.A.C. R18-4-215).

Maricopa CountyDoes a restaurant remodel need Maricopa County plan approval, and what plumbing goes on the plans?

Yes, for a new restaurant or a major alteration or addition. The county Environmental Health Code bars construction until detailed plans are submitted to and approved by Environmental Services. The plans need a plumbing schedule showing water heaters, overhead waste lines, floor drains and sinks, connections and backflow devices.

How must a Maricopa County restaurant drain its sinks, ice machines and walk-in coolers?

Sinks, dish machines, ice machines and walk-in condensate lines drain indirectly through a 1-inch minimum air gap to a floor sink or drain, each on its own rigid line. Floor drains stay out of walk-in units except trough drains in processing rooms or produce and meat coolers with undercut or swing doors.

Who sizes a restaurant grease interceptor in Maricopa County: the county or the city?

The city, not the county. The county's restaurant plan review guide says local municipalities determine the number and size of grease traps and interceptors, and tells owners on county land to contact the Water & Waste Division. In unincorporated areas, IPC 1003.3 is amended to add county Environmental Services requirements.

Pinal CountyWhat do Pinal County restaurant plans have to show for grease, backflow and drains?

Pinal County plans must show each grease trap or interceptor with its type and size, easily accessible and outside the building. The Appendix A checklist also asks how often it is emptied, the backflow device on any equipment connected to the water supply, the indirect drainage method for each machine, and a waiver letter if there is no interceptor.

What plumbing details does Pinal County want in a restaurant plan review?

Pinal County Environmental Health wants a plumbing schedule on every food establishment plan set, listing fixtures, sinks, floor drains and sinks, supply lines, overhead waste lines, water heating equipment with capacity and recovery rate, backflow devices and wastewater connections. Review runs within 30 business working days and approval expires one year after issuance.

PhoenixCan a Phoenix business dilute corrosive waste instead of neutralizing it?

No. Phoenix strikes dilution from the model plumbing code. Corrosive liquids, spent acids and other harmful chemicals must be neutralized or treated in an approved neutralizing device, and the waste and the treatment method must be approved before installation. Federal rules generally prohibit dilution as a substitute for required pretreatment.

Can a Phoenix business get an annual permit for plumbing alterations?

Yes, for qualifying facilities. Phoenix can issue an annual permit instead of one permit per alteration to an already approved plumbing installation. The holder needs an Arizona registered architect or engineer as its agent and must keep records. In practice the annual permit runs through the city's Annual Facilities Program, Section 117.

Do you need plan review to replace a grease interceptor in Phoenix?

Yes. Phoenix requires plan review for every grease interceptor installed or replaced. A like-for-like swap of a grease trap can be reviewed over the counter. A new gravity interceptor or any re-piping goes through electronic plan review. A certificate of occupancy is required for these reviews.

How often must a Phoenix restaurant pump its grease interceptor, and what records must it keep?

City Code 28-15 requires the user to keep a Phoenix interceptor working. Grease traps are pumped at least every 30 days and never go past 90. Food service gravity interceptors are pumped at least every three months, and any gravity interceptor when it is over 25 percent full and at least yearly. Keep records on site three years.

Phoenix City Code 28-12: Which businesses must install a grease or oil interceptor?

Under Phoenix City Code 28-12, laundries, food service establishments, service stations, auto repair shops, car washes and commissaries must install and operate an interceptor when the Water Services Director finds one necessary. The city's FOG manual goes further: every food service establishment that prepares food on site needs a grease interceptor.

Phoenix City Code Chapter 28: The FOG (Grease) Program for Food-Service Businesses

Phoenix City Code Chapter 28 bars food-service businesses from putting fats, oils, and grease into the city sewer. Under the City's FOG program, a restaurant must install an approved grease interceptor, pump it on schedule, keep service records, and pass city inspections.

Phoenix Industrial Wastewater Discharge Permit (City Code Ch. 28)

An industrial or commercial business in Phoenix that sends process wastewater to the public sewer usually needs a city wastewater discharge permit first. Phoenix City Code Chapter 28 and its Industrial Pretreatment Program set the rules. This is separate from the FOG grease program, which covers food-service kitchens.

Phoenix restaurants: When do you need an outdoor gravity grease interceptor instead of a grease trap?

In Phoenix a grease trap (hydromechanical interceptor) is allowed only for kitchens with up to four plumbing fixtures and no garbage disposal or dishwasher. More than four fixtures, or any disposal or dishwasher, requires an outdoor gravity grease interceptor, at least 500 gallons with two compartments.

What happens during a Phoenix commercial grease (FOG) inspection?

Phoenix Environmental Services inspectors arrive unannounced, in uniform, and try to come in off hours. They check three years of pumping records, the interceptor and how full it is, the count of grease-bearing fixtures and the outside grease and trash area. Problems get an inspector's requirement with a time frame, and extension requests must be in writing.

What permit does a Phoenix business need for a plumbing remodel or tenant improvement?

A commercial building permit with plan review, applied for in the SHAPE PHX portal. Phoenix requires it for non-residential remodels, tenant improvements and changes of use. Moving or adding fixtures counts. Swapping a fixture in the same spot, clearing a stoppage or fixing a leak is exempt.

Which minor commercial plumbing jobs can be permitted online in Phoenix?

Phoenix's online permits flyer lists three commercial plumbing jobs a licensed contractor can permit online: Replace Water Heater, Minor Plumbing Repipe and Gas Pipe Repair. The work must be minor enough to skip plan review. New permit applications now go through the SHAPE PHX portal.

Who approves a fire line connection in Phoenix?

Three city departments approve a Phoenix fire line together: the Fire Department, Planning and Development (PDD) and Water Services (WSD). The Fire Code also says fire protection permits go only to current Fire Department business certificate holders, so a plumbing license alone does not let you pull one.

ScottsdaleHow does Scottsdale inspect restaurant grease traps?

Scottsdale Water Quality inspects each restaurant. Code requires a complete cleaning by a licensed contractor every 30 days for interceptors rated 100 gpm/200 pounds or less, and every 90 days for larger units, or sooner at 25 percent full. Keep written logs on site for three years. Enzymes cannot replace pumping.

How long does Scottsdale take to review a tenant improvement with plumbing?

Scottsdale's Commercial Plan Review page lists 7 business days for administrative review and 10 business days for substantive review of a tenant improvement. Plumbing is part of the construction documents, so it rides that clock. Corrections send the plans back, and the process restarts when you resubmit.

How often must a Scottsdale car wash or repair shop pump its interceptor?

The city's Pretreatment page says Scottsdale car washes, repair shops and fleet facilities must pump and clean their interceptor at least once a year, more often if discharge requires. Code Section 31-85 sets 90 days for sand and grease interceptors over 100 gpm/200 pounds. Keep pump-out records on site for three years.

What does Scottsdale require to submit a grease interceptor for permit?

Scottsdale wants a kitchen equipment list, a drawing that shows every drain, floor sink and vent, and interceptor size calculations on the city worksheet. Gravity interceptors also need site and civil drawings with setbacks and easements. A licensed plumbing contractor must do the work, and no interceptor may be installed at risk.

What size grease interceptor does Scottsdale require?

Scottsdale requires at least 500 gallons for a gravity grease interceptor. Its sizing formula uses DFU × 3 gpm × 12 or 17 minutes, while its gravity-interceptor definition specifies at least 30 minutes retention. Have plan review resolve that difference for the design. Small traps require four or fewer food-prep fixtures and no dishwasher.

When does Scottsdale require a grease interceptor?

Scottsdale requires an interceptor at new facilities handling grease-laden or other harmful waste, at an existing facility that has none when it adds, alters or remodels, and at any facility that causes a sewer blockage or grease build-up. Each interceptor serves one user only, and the code names the kitchen fixtures that must drain to it.

Paradise ValleyWhen does Paradise Valley require a grease, oil or sand interceptor?

Paradise Valley Town Code 15-2-15 requires grease, oil and sand interceptors when the Town Engineer finds them necessary for wastes with excessive grease or oil, flammables or sand. Homes are excluded. The Town Engineer approves type, capacity and an accessible location, and the owner keeps the interceptor working at the owner's expense.

CarefreeCarefree certificate of occupancy: the $100 Building Safety Inspection before a business opens

Yes. Carefree requires a Certificate of Occupancy before a physical business opens, and the way to get one is to request and pay for a $100 Building Safety Inspection in the Permit & License Portal after applying for the $50 business license. The COO is one-time unless the business moves to a different building. Contractors skip the inspection step.

MesaCan a Mesa tenant improvement use permit-by-inspection? City Code 4-1-4(U)

Small tenant improvements in Group B, M or S space can use Mesa's permit-by-inspection program if they are 10,000 square feet or less, involve no change of occupancy (except between B and M), no high piled storage or hazardous materials, and need no added zoning approval. An inspector reviews and issues the permit. Using it is optional.

Can you cut a newly paved Mesa street for a sewer or water repair? City Code 9-1-6

Usually not for two years. Mesa's City Engineer will not approve a right-of-way permit to cut a street for two years after the city accepts new pavement, renovation, reconstruction or street maintenance. Exceptions cover emergencies, lost essential service, building service with no other route and legal mandates. Cuts within five years also pay a restoration fee.

Do you need a certificate of occupancy to open or change a Mesa business? City Code 4-1-6

Yes. In Mesa no building can be used, and no occupancy classification changed, until the Building Safety Director issues a Certificate of Occupancy after inspection. It also waits on unpaid city taxes and accounts. A partial or temporary certificate can cover part of a project, and the original is free.

Do you need a permit to connect a building to the Mesa sewer? City Code 8-4-8

Yes. Any connection to, opening into or alteration of Mesa's public sewer needs a written permit from Development Services, and a valid plumbing permit comes first. The owner maintains the building connection pipe from the building to the public sewer, except that the city repairs a broken section located off-property in a street or alley.

Do you need a right-of-way permit for plumbing work in a Mesa street or alley? City Code 9-1-2

Yes. Mesa requires a Right-of-Way Permit before anyone excavates or works in a street, alley or public easement, including sewers and water mains. Apply with engineering plans, and the City Engineer reviews and inspects the work. Give 24 hours notice before starting. Digging a street to connect to the sewer also needs the City Engineer's permit.

Do you need an industrial wastewater discharge permit in Mesa? City Code 8-4-16 and 8-4-18

You need one if Mesa classes your business as Class I (any significant industrial user) or Class II (a smaller user the city finds could harm the sewer or worker safety). Class III needs no permit. Mesa issues permits within 60 days of a complete application, for up to five years, and they cannot be transferred.

Does a Mesa business need a Multiple or Large Meter permit? City Code 8-10-9

Yes, if you ask for a meter four inches or larger, or the equivalent in multiple meters. Mesa's code also requires an MLM Permit to use more than the 330 acre-foot annual demand ceiling or to take service with unusual demand. Residential-only meters and hospitals are excluded, but landscape meters are not.

Does a small Mesa business need separate men's and women's restrooms? IPC 403.2 and 410.2

Not if the total occupant load is 25 or fewer, counting employees and customers. Mesa's amendments also drop the service sink requirement for businesses and stores with 100 or fewer occupants and the drinking fountain requirement at 50 or fewer. Other separate-facility exceptions and fixture-count rules still apply.

How big must a Mesa restaurant grease interceptor be? City Code 8-4-22(E)

Mesa sizes a grease interceptor from drainage fixture units: total the units, multiply by 3 gpm, then by 12, and round up. The minimum is 500 gallons, the maximum 2,500, with two chambers, or three at 750 gallons and up. A trap is allowed only with four or fewer food-prep fixtures and no dishwasher.

Keeping Mesa pretreatment equipment running: City Code 8-4-21 records and bypass rules

Mesa makes the owner keep pretreatment equipment in continuous, effective operation at the owner's cost and keep cleaning, repair and calibration records at the facility for three years. Bypasses are prohibited except in narrow cases. A planned bypass needs 10 days written notice, and an unplanned one must be reported within 24 hours.

Mesa City Code 8-4-22: who needs a grease interceptor and what upkeep it takes

Mesa City Code 8-4-22 lets the city require a grease, oil or sand interceptor at restaurants, laundries, service stations, auto shops and carwashes. The owner keeps it working at their own expense and keeps written cleaning and repair records at the facility for three years. Section 8-4-22 sets no pumping interval.

Mesa water and sewer capacity fees for a commercial project: City Code 8-10-13 and 5-17-5

Mesa charges a water and wastewater capacity fee by meter size on any new or upsized water connection, from $9,528 for a 3/4 inch meter to $254,072 for a 4 inch meter. It is due before the city installs the meter. Upsizing pays only the difference, and impact fees under Title 5 can apply on top.

What can a Mesa business not put down the drain? City Code 8-4-15 prohibited discharges and limits

Mesa bans wastewater below pH 5.0 or above 10.5, hotter than 150 degrees F, with a flashpoint under 140 degrees F, or carrying enough fats, oils, grease or solids to block or damage the sewer. It also bars unapproved cooling water, condensate and stormwater. Class I industrial users face added metal limits.

What does Mesa's commercial plumbing plan review checklist require?

Mesa reviews commercial plumbing plans against a nine-page checklist built on the 2024 IPC with Mesa amendments. It covers fixture counts, water service, drainage, vents, backflow, roof drains and interceptors. Plumbing systems cannot be deferred to a later submittal, and incomplete packages can be returned without review.

What is Mesa's Annual Facilities Permit for plumbing work? City Code 4-1-4(F)

Mesa can issue an Annual Facilities Permit to a qualified facility, such as a manufacturer or property manager with full-time building staff. It replaces individual permits for repeat work on existing buildings, but only if the work adds no floor area and does not change the use. An Arizona registered architect or engineer must serve as the agent.

ChandlerCan a Chandler business get an annual permit for repeat plumbing alterations?

Yes, Chandler can issue an annual permit for repeat alterations at a previously approved building instead of a permit for each job. The fee schedule lists it as a $1,000.00 registration plus $60.00 per hour of on-site review and inspection, with a trust account required. The scope of work is set by a building official policy.

Can a food truck dump wastewater at a Chandler commissary?

Only with the city's approval. A mobile food operator who wants to send gray water to a commissary in Chandler submits the city's online food truck discharge form. It names the commissary and its grease device type (grease interceptor or grease trap), its capacity in gallons, and the expected frequency and volume of discharge.

Chandler amendment to IPC 1003.3.7: how big must a grease interceptor be?

Chandler sizes gravity grease interceptors by total drainage fixture units: 0 to 21 DFU needs 750 gallons, 22 to 35 needs 1,000, 36 to 90 needs 1,250, and so on up to 3,000 gallons at 308 to 342 DFU. Above 342 DFU, an Arizona registered professional engineer must design it.

Chandler sewer discharge limits for businesses: FOG, pH and surcharges

Chandler's Industrial Pretreatment Program bars non-residential wastewater with FOG above 100 mg/L or pH below 5.0 or above 12.5. Chandler bills excess pollutant charges when BOD tops 300 mg/L, suspended solids top 350 mg/L or ammonia tops 35.0 mg/L.

Does a Chandler restaurant need a grease trap or interceptor?

Yes. Chandler requires every food service establishment that prepares or packages food or beverages to install a fats, oils and grease treatment device, sized by fixture count. Keep pumping records on site for 3 years, clean when grease and solids reach about 25 percent of capacity, and never add enzymes or route a disposer to it.

How long does a commercial tenant improvement permit take in Chandler?

Chandler's posted time frames for a commercial tenant improvement building permit are 20 working days for the completeness review, 40 for substantive review (two reviews of 20 working days each) and 60 working days overall. The clock stops while you answer a deficiency notice or corrections.

GilbertDoes every Gilbert business have to file a wastewater discharge questionnaire?

Yes. Under Gilbert Town Code 66-177, every nonresidential user connected to the town sewer, including home occupations and users exempt from a business license, completes a wastewater discharge questionnaire. It is filed with the business license application and repeated yearly with the renewal. License-exempt users file when they connect and every July 1.

Does your Gilbert business need a Class A or Class B wastewater discharge permit?

In Gilbert, an industrial user the town designates as significant needs a Class A wastewater discharge permit, and must apply at least 90 days before any new or additional industrial discharge begins. Smaller users can be required to hold a Class B permit if the director finds their discharge could harm the sewer system. Permits run up to five years.

Gilbert Town Code 66-244: grease removal devices for restaurants and food service

Gilbert Town Code 66-244 requires every newly built, remodeled or converted commercial kitchen with grease-generating activity to install a grease removal device at least as large as the adopted plumbing code (the 2018 IPC) requires. The town can also order a new or more effective grease removal device after grease blockages in the sewer line serving the business.

Gilbert Town Code 66-245: floor drains and wash racks at auto shops and car washes

In Gilbert, a vehicle or equipment service facility may have no floor drains unless they connect to a wastewater pretreatment system. Parts-cleaning sinks and tanks cannot connect to the sewer, and wash rack water must pass through a pretreatment device first. The town's list covers repair, fueling, fluid changes, body work and washing.

How often must a Gilbert restaurant pump its grease trap? Town Code 66-244(d) and (e)

Gilbert requires the entire contents of a grease removal device to be pumped out at least every six months, and more often when needed to keep grease out of the sewer. The director can accept a longer interval if the owner shows it works. Emulsifiers are banned, and additives can never be the only maintenance.

When do Gilbert businesses pay water, sewer and system development fees?

Gilbert collects system development fees before it issues a building permit. With no building permit, they are due when the water service connection is bought, or before a sewer-only connection is approved. Nothing issues until they are paid, and a change of use or added floor area is charged on the added service units only.

When does a Gilbert business have to pretreat its wastewater? Town Code 66-234

Gilbert requires pretreatment when the director finds a permit applicant's waste must be lowered before it reaches the town sewer, when a business produces wastewater the article prohibits, or when a plant change raises the strength or volume of a permit holder's discharge. The plans go to the director for approval before construction starts.

TempeCan a Tempe business open with a temporary certificate of occupancy? City Code 8-111

Sometimes. Tempe City Code 8-111.3 lets the building official issue a temporary certificate of occupancy before all permitted work is finished, if that portion will be occupied safely. Each is limited to 30 days, a permit gets at most three, and Table 2-A lists $1,006 for the first 30 days or each extension.

Does a small Tempe business need separate men's and women's restrooms? IPC 403.2

Not always. Tempe's IPC 403.2 says separate toilet facilities for each sex are not required in a structure or tenant space with a total occupant load of 30 or fewer, employees and customers combined. Single-user rooms and all-gender rooms with privacy also avoid the split. Section 410.2 drops drinking fountains at the same 30.

Does a Tempe business need a wastewater discharge permit? City Code 27-32

Tempe City Code 27-32 lets Public Works issue wastewater discharge permits to nondomestic users and require a notice of intent. A significant industrial user needs a Class I permit first, and others may be required to hold Class II, III or IV permits. A permit lasts up to five years and goes void if a transfer lacks 60 days' notice.

Does a Tempe tenant improvement need a plumbing permit? City Code 8-105

Yes, in most cases. Tempe City Code 8-105.1 requires a permit before anyone alters, repairs or replaces a plumbing system or changes a space's use. The exemptions cover stopping leaks and clearing stoppages without replacing parts, and like-for-like water heater and softener swaps only in homes. Applications go through Tempe's online permit portal.

Tempe City Code 27-22: grease traps, interceptors and the garbage disposal ban

Tempe City Code 27-22 lets Public Works require every non-residential sewer user to install, clean and maintain grease traps and interceptors at its own expense, under city rules. A food service kitchen needs a trap or an interceptor, a commercial dishwasher means an interceptor, and commercial garbage disposals are barred.

Tempe FOG inspections: pumping schedule, records and what inspectors check

Tempe inspects restaurant grease devices on a routine schedule. Inspectors check that a permitted hauler is pumping the device every 30 or 90 days by size, that pump-out records are on site, that the device is intact, that the right fixtures drain to it and that no disposal is connected.

What can a Tempe business not put down the sewer? City Code 27-10

Tempe City Code 27-10 bars a long list from the city sewer, including fats, oils, grease, wipes and rags in amounts that obstruct flow, wastewater hotter than 150 degrees Fahrenheit or outside pH 5.0 to 10.5, petroleum oil, and condensate unless Public Works authorizes it. A nondomestic source also needs a Public Works permit.

Queen CreekQueen Creek Industrial Waste Survey: what Town Code 16-4-15 and 16-4-17 mean for a commercial building permit

Queen Creek asks industrial users to complete an Industrial Waste Survey as part of the building permit. The Town ties this to Town Code 16-4-15, which bars discharges to the public sewer that can cause interference or health problems, and 16-4-17, which sets pretreatment requirements. The Town says to call 480-358-3003 to learn whether your project needs a permit.

MaricopaDoes a City of Maricopa restaurant need Pinal County approval?

Yes. The City of Maricopa's tenant improvement guide says all food service facilities require separate approval by Pinal County, with plan review and permitting through Pinal County Environmental Health in Florence. Fire sprinkler and fire alarm submittals need their own permits and approvals too, so a restaurant here has several approvals running alongside the city building permit.

GlendaleGlendale City Code 33-238: grease interceptors must be pumped every 180 days

Glendale requires every grease trap and grease, oil or sand interceptor to be pumped out or cleaned out completely at least once every 180 days, or more often if the city says so. The owner pays, keeps three years of written records at the facility, and cannot use enzymes as a substitute for pumping.

PeoriaPeoria City Code 25-171 to 25-176: grease interceptor rules, 90-day pumping and enzymes

Peoria requires every grease trap and interceptor to be pumped out or cleaned out completely at least once every 90 days, or more often if the Director says so. The owner pays, keeps cleaning and repair records at the facility for three years, and cannot use enzymes or bacteria as a substitute for pumping.

SurpriseDo you need an industrial waste discharge permit in Surprise?

Yes, if you are an industrial user as Surprise Municipal Code defines it. Under 58-322 an industrial user must hold a city industrial waste discharge permit, get a new or amended one before starting any new industrial discharge, pretreat as needed, keep records and file quarterly self-monitoring reports. The city issues them for up to five years.

What does Surprise require for a grease interceptor under its 2024 plumbing code?

Surprise's 2024 plumbing amendments hand grease interceptor sizing to the City. A gravity interceptor's retention time is whatever the City approves, not the model code's fixed 30 minutes, and an automatic grease removal device must still work as a gravity interceptor when the power goes out. The City's guidance then asks for an outdoor unit of 750 to 2,500 gallons.

GoodyearDoes a Goodyear restaurant need a grease trap or interceptor? Size, 180-day pumping and records

Yes. Goodyear Ordinance 12A requires every food service establishment to install an appropriately sized grease trap or grease interceptor. Interceptors run 500 to 2,500 gallons, traps are limited to four food-prep fixtures and no dishwasher, and every trap and interceptor is cleaned out completely at least every 180 days unless the director allows otherwise in writing.

AvondaleAvondale City Code 24-104 and 24-105: grease interceptors, pretreatment plans and the discharge survey

Avondale City Code 24-104 lets the director require grease, oil, hair and sand interceptors wherever wastewater carries excessive fats, oil, grease or sand, but never for residential users. Under 24-105, every user applying to discharge into the sewer submits an industrial pretreatment survey, and larger or designated users need a discharge permit.

BuckeyeBuckeye City Code 16-10-2: grease interceptor size, upkeep and records for restaurants

Buckeye City Code 16-10-2(B) requires grease, oil and sand interceptors or traps where the water resources department finds them necessary, and never for private living quarters. Unless the director approves otherwise, an interceptor holds 750 to 2,500 gallons. The owner keeps it working at the owner's expense and keeps cleaning records on site for three years.

TollesonWhen does Tolleson require pretreatment or a grease interceptor?

Tolleson City Code 11-3-1 lets the Utilities Director require a pretreatment system for industrial flows, to restrict certain waste constituents, even out peak discharges or reach a required result. Every system needs plans signed by an Arizona-licensed engineer, and grease, oil and sand interceptors are required where the city finds them necessary.

Litchfield ParkLitchfield Park commercial plumbing permit: when a business needs one, review times and fees

Yes. Litchfield Park requires a building permit to repair, remove, convert or replace any plumbing system, and a tenant space change also brings plan review, a certificate of occupancy and a business license. Commercial plumbing improvements are listed at 5 to 10 business days for review, and simple permits can be issued over the counter.

Uniform Plumbing Code

All UPC sections
Browse the full code library

Need The Work Done To Code?

Call a licensed plumber who pulls the permit in your city and passes inspection the first time.