24/7 Emergency(602) 675-1555
HQ Plumbing & Air logo
Mesa Permit

Do you need a permit to connect a building to the Mesa sewer? City Code 8-4-8

Verified September 29, 2026
In Short

Yes. Any connection to, opening into or alteration of Mesa's public sewer needs a written permit from Development Services, and a valid plumbing permit comes first. The owner maintains the building connection pipe from the building to the public sewer, except that the city repairs a broken section located off-property in a street or alley.

Official Source
Mesa City Code, Title 8, Chapter 4, Section 8-4-8: Building Connections (Municode)
Mesa City Code 8-4-8, Building Connections; Permit, Approval, Records, and Responsibility
“No authorized person shall make any connections with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Development Services Department.”
Applies to:
Owners, developers, general contractors and plumbers connecting, replacing or repairing a building sewer in Mesa
Official fee:
The current fee accompanies applications for connections the city builds; the amount is in the city's fee schedule, not this section
In force:
Mesa City Code Title 8, Chapter 4 as amended by Ord. 5959 (8-25-25)
Last verified:
September 29, 2026, against the official page

The pipe between a building and the city sewer main is the part nobody thinks about until it clogs or a new tenant needs it moved. Mesa's code says who may touch the main, what you need before you do, and who pays when the broken section is under the street.

What does Mesa City Code 8-4-8 say?

Six subsections cover the connection:

  • (A) Permit to touch the sewer. No authorized person may connect to, open into, use, alter or disturb a public sewer or its appurtenances without a written permit from Development Services.
  • (B) Plumbing permit first. Each applicant for a building connection "shall obtain a valid plumbing permit" from the city as a prerequisite for approval. Applications for connections the city builds must come with the current fee.
  • (C) City approval. The number, location, manner of connection and size of every building connection are subject to the Development Services Manager's approval.
  • (D) Records. The city keeps a record of each connection, its purpose and the owner or agent.
  • (E) Owner maintains. The property owner is responsible for cleaning, unstopping, maintenance and repair of the building connection piping "from the owner's home or building to the public sewer."
  • (F) Broken section in the street. Where clearing a stoppage requires repair or replacement of a damaged section located off-property in a street or alley, the Water Resources Department makes the repair or replacement.

What do the key terms mean?

  • Building connection. The pipe from a building to the public sewer. The text does not use "lateral," but this is the same line most people mean.
  • Public sewer. The city main and its appurtenances, such as manholes.
  • Off-property. Located outside the owner's lot, in the street or an alley.

Who does this cover?

Anyone connecting a new building, moving a connection, tapping the main or replacing a building sewer that reaches it. Subsection (F) has no size or use limit in its text, so it reads as covering commercial owners as well. It does not make the city responsible for the on-property pipe, and it does not turn a stoppage inside the building into a city job.

Quick check: who does what?

SituationWho actsWhy
New building needs to tie into the public sewerOwner applies for a sewer connection permit, after a valid plumbing permit8-4-8(A) and (B)
Owner wants to change the size or location of a connectionDevelopment Services Manager approves8-4-8(C)
Stoppage caused by roots in the on-property pipeOwner8-4-8(E)
Stoppage requires replacing a broken section in the alleyWater Resources Department repairs it8-4-8(F)
A contractor opens the main without a permitNot allowed8-4-8(A)

What does this look like in real life?

A new restaurant. The plumber pulls the plumbing permit for the building, and the sewer connection is approved as part of that process. The connection also needs the grease interceptor plan reviewed under Mesa's interceptor rules.

A stoppage under the alley. A camera finds a collapsed section in the alley, past the property line. Under (F), the city repairs that section, and the owner is still responsible up to the boundary.

The edge case. A backup turns out to be a belly in the on-property pipe that meets a break just inside the alley. The two sections have two responsible parties, so both should be documented before work starts.

What should you do next?

  1. 1Locate the connection and confirm where the property line sits.
  2. 2Pull the plumbing permit for the building, then request the written sewer connection permit from Development Services. Permit Services: 480-644-4273.
  3. 3Ask for approval of the connection's number, location and size before excavating.
  4. 4If a stoppage traces to a broken section in a street or alley, report it to Water Resources rather than repairing it yourself.
  5. 5Budget for the capacity and impact fees that apply to a new connection.

What do people get wrong?

  • "A plumber can tap the main if the customer approves." A written permit from Development Services comes first.
  • "The city owns everything past the wall." The owner maintains the pipe to the public sewer, apart from the off-property repair in (F).
  • "Chandler's single-family limit applies." Mesa's (F) does not carry that limit in its text.
  • "The permit fee is on this page." It is in the city's fee schedule.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
ChandlerChandler also requires a written permit, from the City Engineer, before anyone uncovers or taps the public sewer. Its owner-responsibility rule reaches the tap and saddle on the city main, and the city repairs a broken section in the right-of-way only when the property is single-family or a duplex.Chandler City Code 51-6 and 51-7
Verified September 29, 2026
AvondaleAvondale's rule is one sentence: no unauthorized person may uncover, connect to, use, alter or disturb a public sewer without a written permit from the city manager.Avondale City Code 24-86
Verified September 29, 2026

This page explains the rule. The official text at the source above governs.

Sources

Commercial Plumbing in Other Cities

More Mesa Codes and Permits

Related Rules and Questions

Questions About Mesa Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.