24/7 Emergency(602) 675-1555
HQ Plumbing & Air logo
Phoenix Permit

Do you need plan review to replace a grease interceptor in Phoenix?

Verified September 28, 2026
In Short

Yes. Phoenix requires plan review for every grease interceptor installed or replaced. A like-for-like swap of a grease trap can be reviewed over the counter. A new gravity interceptor or any re-piping goes through electronic plan review. A certificate of occupancy is required for these reviews.

Official Source
City of Phoenix Water Services: FOG Best Management Practices for Food Service Establishments
Phoenix FOG Best Management Practices Manual, Installation and Replacement of Interceptors and Appendix B (June 2024)
“Per plumbing code all grease interceptors installed and replaced in the City of Phoenix must go through plan review.”
Applies to:
Restaurant and food service owners, tenants and the plumbing contractors or engineers who replace grease interceptors in the City of Phoenix
Official fee:
plan review and permit fees per the PDD Fee Schedule (Ord. G-7465, effective 2026-01-20)
In force:
FOG manual June 2024; 2024 IPC 1003.2 as amended by Phoenix, since August 1, 2025
Last verified:
September 28, 2026, against the official page

Swapping a grease trap feels like maintenance. In Phoenix it is not. The city's grease manual puts every interceptor installation and replacement through plan review, with a small over-the-counter lane for the simplest swap. The one thing most people miss: the city wants the drawings to show every grease-bearing fixture routed to the new device.

What does the manual say about replacing an interceptor?

The FOG Best Management Practices Manual (June 2024) says: "Per plumbing code all grease interceptors installed and replaced in the City of Phoenix must go through plan review." It gives the reason too. Review makes sure the interceptor "is sized correctly, approved for use in the City of Phoenix, and that all grease bearing fixtures are plumbed to the interceptor." It then splits the process in two:

  • Over the counter: "Like for like replacements of hydromechanical interceptors can be submitted over the counter." Appendix B adds that the job must be small and involve plumbing only.
  • Electronic plan review: any plans with major plumbing changes, "including installation of a new grease interceptor," cannot go over the counter.

The 2024 plumbing code amendment behind this gives the Director of Water Services approval authority over each interceptor's size, type and location.

What do the key terms mean?

  • Hydromechanical interceptor: the grease trap, usually small and indoors.
  • Like for like: the manual does not define it. Read it as the same kind of device serving the same fixtures with no piping changes. That is a reading, so ask the reviewer when the new unit differs in size.
  • Grease-bearing fixtures: floor sinks, floor drains, mop sinks, prep and pot sinks, dishwashers, garbage disposals and similar fixtures in the kitchen prep or wash area. Hand wash sinks do not count.
  • Isometric drawing: a single-line pipe drawing that shows pipe sizes and venting.

Who does this cover?

Food service owners and their contractors replacing or adding an interceptor in the City of Phoenix. It does not cover routine pumping and cleaning, which needs no review. Auto shops with oil separators are outside the manual's food service process.

Quick check: which review route fits my job?

JobReview routeWhy
Replace a grease trap with the same type, same pipingOver the counterManual: like-for-like hydromechanical replacement
Same swap, but a fixture is rerouted or addedDrawings with an isometric showing pipe size and ventingAppendix B, re-piping rule
Swap the trap for a different approved device, no piping changePlumbing floor plan layout onlyAppendix B, "only a different pretreatment device"
Install a new gravity interceptorElectronic plan reviewManual: new interceptors cannot go over the counter
Add a dishwasher or disposal that forces the switch from trap to gravityElectronic plan reviewThe device changes type, so it is a new interceptor
Interceptor ordered by an Environmental Services inspectorSame routes, and bring the inspection reportAppendix B

What does this look like in real life?

  • Cracked trap under the pot sink. The owner buys the same approved model, connects it to the same lines, and takes a plumbing floor plan to the counter. The city reviews it over the counter.
  • Restaurant moves its prep sink during a remodel. A fixture is rerouted, so the drawings must include an isometric with pipe size and venting.
  • Dishwasher added to a trap-only kitchen. The answer flips. The dishwasher forces a gravity interceptor, which is a new installation and needs electronic plan review.
  • Inspection finds the interceptor rotted out. The inspector's requirement is the reason for the job, so the owner brings a copy of the Commercial Inspection Report to the review.

What should you do next?

  1. 1Decide whether the job is like for like. If the type, size or piping changes, plan on drawings.
  2. 2Pick the device from the city's approved interceptor list in Appendix A of the manual. Trap models must be PDI certified or UPC/IAPMO listed. Gravity units must be 500 gallons or more with two compartments and two manways.
  3. 3Prepare the submittal: business name, full address with suite number, every existing grease-bearing fixture, a north arrow or orientation mark, and the interceptor's manufacturer and model number. Drawings must be legible or the review is denied.
  4. 4Call 602-495-0278 at least 24 hours ahead to book an Environmental Services inspector for their part of the review. Then submit through Planning and Development. Commercial plan review moved into the SHAPE PHX portal April 27, 2026, and the manual's Appendix B still describes older channels and a pandemic-era appointment note, so call 602-262-7811 to confirm which route your job takes.
  5. 5Have the certificate of occupancy in order, because the manual says one is required for all these plan reviews, then schedule the inspection when the unit is set.

What do people get wrong?

  • "A like-for-like swap is just maintenance." The manual sends every replacement through plan review. The counter is only the shorter lane.
  • "A hand sketch is fine." The city says illegible drawings are denied.
  • "Any interceptor replacement can go over the counter." Only like-for-like replacement of hydromechanical units is named there. New interceptors go electronic.
  • "The pumper's invoice covers it." Pumping records prove maintenance. They do not replace plan review for a new device.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
ChandlerChandler asks the plumber to give Development Services a fixture count and a plumbing plan when applying for the plumbing permit, so the FOG device is sized before it is installed.Chandler Industrial Pretreatment Program, Food Service Establishments
Verified September 28, 2026
MesaMesa's plumbing plan checklist asks plan submitters to provide the required grease or sand and oil interceptors and their locations.Mesa Plumbing Plan Submittal Checklist (2024 IPC)
Verified September 28, 2026

This page explains the rule. The official text at the source above governs.

Sources

Commercial Plumbing in Other Cities

More Phoenix Codes and Permits

Related Rules and Questions

Questions About Phoenix Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.