24/7 Emergency(602) 675-1555
HQ Plumbing & Air logo
Phoenix Permit

Can a Phoenix business get an annual permit for plumbing alterations?

Verified September 28, 2026
In Short

Yes, for qualifying facilities. Phoenix can issue an annual permit instead of one permit per alteration to an already approved plumbing installation. The holder needs an Arizona registered architect or engineer as its agent and must keep records. In practice the annual permit runs through the city's Annual Facilities Program, Section 117.

Official Source
City of Phoenix 2024 IBC Chapter 1 Administrative Provisions: Annual Permit and Annual Facilities Permit
PBCC Administrative Provisions Sections 105.1.1, 105.1.2 and 117 (2024 IBC Chapter 1 as amended)
“Instead of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation, the building official is authorized to issue an annual permit”
Applies to:
Owners, campuses and property management companies with facilities that make frequent plumbing alterations, and the engineers and contractors who serve them
Official fee:
Application $500 per facility location; registration and annual renewal $975; $195 per hour for plan review and inspection (PDD Fee Schedule, Ord. G-7465, effective 2026-01-20)
In force:
2024 Phoenix Building Construction Code (Ord. G-7397), since August 1, 2025
Last verified:
September 28, 2026, against the official page

If your company keeps altering the plumbing in buildings it already runs, a permit for every change gets old. Phoenix has a way around it: an annual permit. The surprise is what it costs you to qualify. Phoenix ties the annual permit to a registration program that requires an Arizona registered architect or engineer as your named agent.

What does the code say about annual permits?

Section 105.1.1 says: "Instead of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation, the building official is authorized to issue an annual permit upon application therefor to any person, firm or corporation regularly employing one or more qualified tradespersons in the building, structure or on the premises owned or operated by the applicant for the permit." Section 105.1.2 adds that the holder "shall keep a detailed record of alterations made under such annual permit," and the building official must have access to those records at all times.

Phoenix's own note on the amendment says "Requirements for annual permits are specified in Section 117." That section creates the Annual Facilities Program, which "is an administrative system intended to simplify the permitting and inspection process for qualified facilities." So the working annual permit in Phoenix is the Annual Facilities Permit.

What do the key terms mean?

  • Qualified facility: a building, campus, structure or building service equipment registered with the program.
  • Qualified facility owner: a firm, corporation, political entity or property management company that occupies or controls the buildings and maintains them in compliance with the code.
  • Agent: a person employed by the owner as full-time staff or by contract who is an architect or engineer registered in Arizona. The agent is responsible for code compliance of the work. An agent hired by contract cannot be the same person as the builder or the person authorized to act for the owner.
  • Qualified tradesperson: the code does not define it. Read it as a worker with the trade qualifications Phoenix requires for permitted plumbing work.

Who does this cover?

Organizations with facilities that see steady plumbing alterations: campuses, property management companies, chains, government facilities. It does not cover a single tenant who needs one build-out, and it does not turn everything into a no-permit job. Section 117.1 says "Additional permits shall be required in accordance with Section 105," and the program does not preempt the technical requirements of the code.

Quick check: how does the annual permit work in practice?

Step or ruleWhat Phoenix saysWhy it matters
ApplicationA form from PDD plus an application and registration feeYou submit the owner contact, the agent, and each location with total square footage
Fees$500 per facility location for eligibility, $975 for initial registration and annual renewal, $195 per hour for plan review and inspectionOfficial PDD Fee Schedule lines
PlansProvided to the building official before work beginsThe program does not skip review
NoticeThe agent notifies PDD before any work startsThe building official decides how much plan review or inspection applies
InspectionsRegular intervals not to exceed six monthsEach installation is still inspected
RenewalEvery 12 months, with the renewal feeWork after expiration is a violation
Agent leavesNotify within seven calendar days and replace within 45 daysOtherwise the permit is suspended
TransferNot transferableA sale or new owner needs a new registration

What does this look like in real life?

  • A property management company with twelve office buildings. It registers the buildings, names an Arizona engineer as its agent, and its plumbing crew alters restrooms and water lines under the annual permit, keeping records for the city.
  • A restaurant chain replacing water heaters at many sites. Each location must be registered. Alterations still get plans and inspections at the frequency the building official sets.
  • A one-suite office tenant. The answer flips. An annual program built for facility owners with an Arizona-registered agent makes little sense for one build-out. The regular commercial permit is the fit.
  • An agent who quits. The owner has seven calendar days to notify PDD and 45 days to name a replacement, or the annual permit is suspended.

What should you do next?

  1. 1Confirm your organization fits: it occupies or controls the buildings and regularly employs qualified tradespeople on the premises.
  2. 2Line up an Arizona registered architect or engineer as agent, on staff or under contract.
  3. 3Complete the PDD application listing the authorized person, the agent and each location with total square footage, and pay the application and registration fees.
  4. 4Use SHAPE PHX, which since April 27, 2026 lists Annual Facility Permits among its services. For properties in the program, PDD's flyer points to the assigned inspector or 602-262-7501.
  5. 5Notify PDD before each project, keep the alteration records the code requires, and renew every 12 months.

What do people get wrong?

  • "An annual permit means no inspections." Section 117.5.2 requires inspections at regular intervals not to exceed six months.
  • "A licensed contractor can be the agent." The agent must be an Arizona registered architect or engineer.
  • "It transfers when we sell." The permit is not transferable.
  • "The registration fee covers the work." Plan review and inspection are billed at the hourly rate on top.

What happens if you skip the program rules?

Section 117.6 lets the building official suspend or revoke the permit for reasons that include working without an agent, concealing work without inspection approval and failing to report work done under the permit. Reinstating means fixing the violations, a separate permit for any compliance work, an investigation fee and a new registration fee.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
ChandlerChandler's code lets the building official set a policy on scope and restrictions for an annual permit for alterations to a previously approved premise, in place of individual permits. It sets no agent or registration program in the section read.Chandler City Code 29-2.8 (Section 105.1.1, Annual permit)
Verified September 28, 2026
MesaMesa's fast lane for small commercial work is a voluntary permit-by-inspection program for tenant improvements in Group B, M or S occupancies of 10,000 square feet or less, with no change of occupancy except between B and M.Mesa City Code 4-1-4(U)
Verified September 28, 2026

This page explains the rule. The official text at the source above governs.

Sources

Commercial Plumbing in Other Cities

More Phoenix Codes and Permits

Related Rules and Questions

Questions About Phoenix Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.