24/7 Emergency(602) 675-1555
HQ Plumbing & Air logo
Queen Creek Permit

Queen Creek Industrial Waste Survey: what Town Code 16-4-15 and 16-4-17 mean for a commercial building permit

Verified September 29, 2026
In Short

Queen Creek asks industrial users to complete an Industrial Waste Survey as part of the building permit. The Town ties this to Town Code 16-4-15, which bars discharges to the public sewer that can cause interference or health problems, and 16-4-17, which sets pretreatment requirements. The Town says to call 480-358-3003 to learn whether your project needs a permit.

Official Source
Town of Queen Creek Building Safety: When is a Permit Required?
Queen Creek Town Code 16-4-15 and 16-4-17, as quoted on the Building Safety permit page
“Industrial Users are required to complete an Industrial Waste Survey as part of the Building Permit Process.”
Applies to:
Owners, tenants, designers and contractors planning a commercial or industrial project in Queen Creek that will discharge to the Town sewer
Official fee:
not applicable
In force:
Queen Creek Town Code 16-4-15 and 16-4-17 as quoted on the Town Building Safety page; the Town Code text itself was not readable online when checked
Last verified:
September 29, 2026, against the official page

Most Valley cities put their industrial sewer rules in a separate pretreatment office that a plumber rarely meets. Queen Creek puts a piece of it on the building permit itself: if your project counts as an industrial user, the Industrial Waste Survey is part of getting the permit. A commercial owner who does not know that can lose weeks after the drawings are done.

What does Queen Creek say?

The Town's Building Safety page, "When is a Permit Required?", lists commercial projects among the work that needs a permit, then adds a paragraph on sewer discharge. It quotes Town Code 16-4-15: "No person shall discharge or cause to be discharged at any entry point into the public sewer system" substances or discharges that can cause interference or other health related concerns. It then says that to "comply with the categorical standards, pretreatment requirements and all other requirements" of 16-4-17, "Industrial Users are required to complete an Industrial Waste Survey as part of the Building Permit Process."

The page closes with the practical instruction: "Please call 480-358-3003 to find out if you need a permit for your specific project."

What do the key terms mean?

  • Industrial User: a business that discharges wastewater to the public sewer other than ordinary household sewage. The Town page does not define the term or set a size cutoff. Other Valley cities do, and the comparison below shows how.
  • Industrial Waste Survey: a survey the Town page ties to the pretreatment requirements of 16-4-17. The page names the survey but does not publish the form, its contents or who reviews it.
  • Categorical standards: federal discharge standards that apply to specific industries. The Town Code refers to them in 16-4-17.
  • Pretreatment: a device or process, such as an interceptor or separator, that removes pollutants before wastewater reaches the sewer.

Who does this cover?

The survey requirement applies to industrial users. The Town page does not list the businesses that count. Restaurants, car washes, laundries and shops that produce oily, chemical or high strength wastewater are the kinds of users other Valley cities regulate, but this page does not say whether Queen Creek treats them as industrial users. The only reliable answer is the Town's, from the number above.

Quick check: where does the survey fit?

QuestionWhat the Town page says
Is a permit needed for commercial work?Commercial projects are on the list of work that requires a permit
Is there a sewer discharge step?Yes, for industrial users: an Industrial Waste Survey as part of the building permit process
What rule bars harmful discharges?Town Code 16-4-15
What rule sets pretreatment requirements?Town Code 16-4-17
Who decides whether you need a permit?The Town, by phone at 480-358-3003

What does this look like in real life?

A brewery tenant improvement. The tenant plans floor drains, a wash-down area and a grain and yeast waste stream. The architect files for a commercial building permit. Because the Town page places the survey inside the building permit process, whether the brewery is an industrial user is worth asking before plan submittal, not after.

A dental office. No manufacturing, only sinks and a suction system. The Town page gives no cutoff that clears it, so one call to Building Safety is the way to get a yes or no on the survey.

The edge case: a shell building with no tenant. The owner pulls a permit for the shell and lets the future tenant handle the rest. If the future tenant is an industrial user, the survey is part of the permit process for that work, so do not assume the shell permit settled the sewer question. Ask the Town when the tenant is known.

What should you do next?

  1. 1Describe your process in writing: what goes down each drain, in what volume, and how often.
  2. 2Call Building Safety at 480-358-3003 and ask whether your project counts as an industrial user and whether an Industrial Waste Survey is required.
  3. 3If it is, ask how the survey is submitted and what the Town needs to see with the building permit application.
  4. 4Ask whether pretreatment (an interceptor or separator) will be required, and design the drains around it before the plans are filed.
  5. 5Keep the Town's answer in writing with your permit file.

What do people get wrong?

  • "The survey is only for factories." The Town page says industrial users, without a size or industry list. Confirm with the Town rather than assume.
  • "It is a separate agency." In Queen Creek the survey is described as part of the building permit process.
  • "Every Valley city works the same way." Mesa sorts users into Class I, II and III and issues a discharge permit to Class I and II, within 60 days of a complete application, good for up to five years. Phoenix defines a Significant Industrial User by process wastewater, including companies discharging an average of 25,000 gallons a day. Queen Creek's page gives no such cutoffs.
  • "The Town page tells me everything." It names the survey and gives a phone number, but it does not publish the form, the deadline or the cutoff for an industrial user. The phone number is the source of truth.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
MesaMesa sorts industrial users into Class I, II and III. Class I and II must obtain an Industrial Wastewater Discharge Permit, issued within 60 days after the application is complete, for up to five years and not transferable. Class III needs none.Mesa City Code 8-4-16 and 8-4-18
Verified September 29, 2026
PhoenixPhoenix treats companies that discharge an average of 25,000 gallons a day of process wastewater to City sewers as Significant Industrial Users, alongside those running federally regulated processes under categorical pretreatment standards.City of Phoenix: Wastewater Discharge Permitting Information
Verified September 29, 2026

This page explains the rule. The official text at the source above governs.

Sources

Commercial Plumbing in Other Cities

More Queen Creek Codes and Permits

Related Rules and Questions

Questions About Queen Creek Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.