Skip to main content
24/7 Emergency(602) 675-1555
Litchfield Park City Program

Litchfield Park commercial plumbing permit: when a business needs one, review times and fees

Verified October 4, 2026
In Short

Yes. Litchfield Park requires a building permit to repair, remove, convert or replace any plumbing system, and a tenant space change also brings plan review, a certificate of occupancy and a business license. Commercial plumbing improvements are listed at 5 to 10 business days for review, and simple permits can be issued over the counter.

Official Source
City of Litchfield Park: Building Permit Questions and Answers (Building Safety)
City of Litchfield Park Building Safety, Building Permit Questions and Answers; City Code 7-18 and 7-19
“Whenever you construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or if you repair, remove, convert or replace any electrical, mechanical or plumbing system, a building permit is required.”
Applies to:
Owners and tenants of commercial space in Litchfield Park, and the plumbing contractors and designers who pull permits for them
Official fee:
Citywide Fee Schedule FY2027: New Commercial plumbing is 15% of permit fee, Repair-Commercial is based on valuation (BOV), plan review is 65% of the calculated permit fee, commercial certificate of occupancy is $200 per building
In force:
Litchfield Park Citywide Fee Schedule FY2027 (cover says effective 8/1/2026, footer says Effective August 1, 2025); City Code Articles 7-18 and 7-19 (Ord. 24-280); building code is the 2018 IPC with amendments effective 1/1/2020 (7-2-1)
Last verified:
October 4, 2026, against the official page

A Litchfield Park business owner usually asks two questions: does this plumbing job need a permit, and how long until it can start. The city answers both on its Building Safety pages, with a time range for commercial plumbing work and a fee line that depends on the value of the job.

What does Litchfield Park say about commercial plumbing permits?

The Building Safety Q&A page states the rule: "Whenever you construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or if you repair, remove, convert or replace any electrical, mechanical or plumbing system, a building permit is required."

The same page gives the review times:

  • Commercial tenant improvement: 5 to 10 business days.
  • Commercial electrical, mechanical or plumbing improvement: 5 to 10 business days.
  • Commercial remodels and additions: 5 to 10 business days.
  • New commercial building shells: 15 to 20 business days.
  • Simple permits: the page says permits that need no review can be issued over the counter.

The commercial submittal package asks for two copies of each item, and a tenant improvement needs a detailed floor plan with section details plus "Associated plans for Electrical, Plumbing and Mechanical." Applications go through the city's GovWell portal, where the city does a completeness review first and issues an invoice once a submittal is complete.

What do the key terms mean?

  • Tenant improvement (TI). Work inside an existing tenant space. The submittal package treats it as part of the building construction plans.
  • BOV. The fee schedule footer defines it: "BOV = Based on Valuation." The fee depends on the stated value of the work.
  • Certificate of occupancy (CO). City Code 7-18 says it "is specific to the owner and use of the building or tenant space."
  • Temporary certificate of occupancy. City Code 7-19 makes it valid for thirty calendar days unless an extension is requested and granted.

Who does this cover?

Anyone doing plumbing work on a commercial building or tenant space in Litchfield Park: the owner, the tenant and the contractor who pulls the permit.

One narrow carve-out exists in the Q&A page: "Clearing of stoppages and/or repair of leaks in pipes, valves or fixtures, provided such repairs do not involve or require the replacement and/or the rearrangement of the valves, pipes or fixtures." That line is the city's own text on work that does not need a permit, and it stops where replacement or rearranging starts.

Quick check: what does the work trigger?

SituationWhat the city's pages sayWhere
Replace or convert a plumbing systemBuilding permit requiredQ&A page
Clear a stoppage or fix a leak with no replacement or rearrangingListed as work that does not need a permitQ&A page
New restaurant or medical tenant improvementTI fee line is BOV of $40 per sq. ft.; office or mercantile is BOV of $20 per sq. ft.Fee schedule
New commercial plumbing15% of permit feeFee schedule
Commercial plumbing repairBased on valuation (BOV)Fee schedule
Plan review65% of calculated permit feeFee schedule
Commercial plumbing inspection15% of permit fee eachFee schedule
Work started or completed without a permitDouble permit feeFee schedule
Inspection after business hours$100 per hour, 2-hour minimumFee schedule
Re-inspection$75 after the same 2 failuresFee schedule
Change of owner or use in a commercial spaceA new certificate of occupancyCode 7-18

What does this look like in real life?

A dental office moving into a former retail suite. The tenant improvement carries plumbing for chairs and sinks. The review list shows 5 to 10 business days for a tenant improvement, and the plumbing plans go in with the floor plan. Before the doors open, the space needs a certificate of occupancy, which requires field inspections by building safety, engineering, fire safety, and planning and zoning, and a city business license.

A small repair. A shop owner has a leaking supply valve replaced. The leak-repair carve-out covers repairs that do not require replacement of the valves, pipes or fixtures. Replacing the valve falls outside it, so this job reads as a permit job, and a contractor can confirm with Building Safety before starting.

The edge case. The same business changes ownership without changing the use. Code 7-18 says a new certificate is needed if the ownership or the use of a commercial building or tenant space changes, so a sale alone can trigger one.

What should you do next?

  1. 1Decide whether the job is a plain stoppage or leak repair, or whether it replaces or rearranges pipes, valves or fixtures. Only the first is listed as exempt.
  2. 2Call Building Safety at 623-935-1066 or email building@litchfield-park.org. Office hours are 7:00 a.m. to 4:00 p.m., Monday through Friday.
  3. 3Create an account on the GovWell portal and submit the application with two copies of plans for anything beyond a simple permit.
  4. 4Request each inspection on the same line. An inspection called in before 3:00 p.m. is made the next business day.
  5. 5For a tenant space, get the business license and plan for the certificate of occupancy ($200 per building on the FY2027 schedule). A temporary certificate lets equipment and stock move in, and the code says it is not permission to do business.

HQ Plumbing & Air handles commercial plumbing repair, restaurant lateral jetting and domestic backflow work. Fire sprinklers and fire backflow are outside what we do.

What do people get wrong?

  • Myth: a repair never needs a permit. The exemption covers stoppages and leaks only when nothing is replaced or rearranged.
  • Myth: the permit fee is a flat number. For commercial plumbing the schedule uses a percentage of the permit fee or a valuation, not a flat price.
  • Myth: a certificate of occupancy follows the building. Code 7-18 ties it to the owner and use.
  • Myth: the fee schedule's date is clear. The FY2027 document has a cover that says effective 8/1/2026 and a footer that says Effective August 1, 2025, so confirm the current line with the city.

Full text and source

The text above comes from the City of Litchfield Park Building Safety pages, Citywide Fee Schedule FY2027 and City Code 7-18 and 7-19, read on 2026-10-04. The code adopts the 2018 International Plumbing Code with amendments effective 1/1/2020 (7-2-1); the amendment document is on file with the city clerk and was not read for this page. The official text governs.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
MesaMesa also ties occupancy to a certificate. No building or structure may be used or occupied, and its occupancy classification may not change, until the Building Safety Director has issued a Certificate of Occupancy or other authorization.Mesa City Code 4-1-6(A)
Verified October 4, 2026
TempeTempe also requires a certificate of occupancy before a building is used or its occupancy changes, but says certificates are not required for work that is exempt from permits.Tempe City Code 8-111
Verified October 4, 2026

This page explains the rule. The official text at the source above governs.

Sources

Commercial Plumbing in Other Cities

More Litchfield Park Codes and Permits

Related Rules and Questions

Questions About Litchfield Park Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.