Yes, if you are an industrial user as Surprise Municipal Code defines it. Under 58-322 an industrial user must hold a city industrial waste discharge permit, get a new or amended one before starting any new industrial discharge, pretreat as needed, keep records and file quarterly self-monitoring reports. The city issues them for up to five years.
“Obtain an industrial waste discharge permit from the city.”
- Applies to:
- Owners and operators of industrial and certain other nonresidential facilities discharging to the Surprise sewer, and the engineers and plumbers who build their pretreatment and sampling systems
- Official fee:
- not published; 58-321 lists fees among possible permit conditions
- In force:
- Surprise Municipal Code Ch. 58, Art. V, Div. 2 (Ord. 2012-06, 2012)
- Last verified:
- October 4, 2026, against the official page
The permit rule in Surprise is one line long. What takes work is the definition behind it, because the code's "industrial user" is wider than a factory. The permit also arrives with a long list of duties, and the quarterly report is the one to plan for.
What does Surprise Municipal Code 58-322 say?
The section opens "In addition to all other requirements, each industrial user shall," and the first duty is to "Obtain an industrial waste discharge permit from the city." It adds a trigger for change: "Any person intending to commence any new industrial discharge not already allowed pursuant to an existing industrial waste discharge permit, shall first obtain a new or an amended permit, as applicable, from the city prior to initiating such discharge."
The other duties, in order:
- comply fully with the permit's requirements and conditions;
- provide all pretreatment needed to meet the categorical standards and the article's other requirements;
- keep a record of the dates and times of all industrial discharges and their nature, concentration and volume;
- give the city the self-monitoring reports and notices the user must send to any other authority;
- submit "to the city, quarterly, a report containing results of self-monitoring and any other information relevant to compliance"; and
- keep those records for "a minimum of three years from the date of monitoring activity."
Section 58-321 supplies the terms. Permits are issued for no more than five years, are nontransferable, are revocable by the city, and are "Issued within 60 days of application or deemed to be denied." Conditions can include effluent limits, monitoring and sampling, reporting, fees, slug control plans and emergency response plans.
What do the key terms mean?
- Industrial user: under 58-275 it includes any nonresidential user that discharges more than the equivalent strength of 25,000 gallons per day of domestic wastes, and any nonresidential user whose waste "potentially could be discharged to the POTW which would be subject to any categorical standard or pretreatment requirements."
- POTW: the code defines it as "the publicly owned treatment works and the connecting sewer collection system" that the city owns or operates, in whole or in part.
- Categorical standards: the code defines them as EPA standards that apply to a specific category of industrial user and are published in 40 CFR 401 to 471. The section's own note points to 40 CFR 403.12 and 40 CFR 136.
- SIU (significant industrial user): a defined subset, and 58-321 says "All SIUs will be issued an industrial waste discharge permit." Other industrial users may be issued one if their discharge "causes or has the reasonable potential to cause harm."
Who does this cover?
Industrial users under the 58-275 definition. The city's Industrial Pretreatment page lists industries including food processing, laundries, hospitals, metal finishing and electroplating. The code does not say whether a restaurant with a 58-306 grease interceptor is an industrial user. That is a question for the city. A household is not covered: the first two clauses of the definition are about nonresidential users.
Quick check: where does this land?
| Situation | Likely outcome | Why |
|---|---|---|
| Factory with a process waste stream under a federal categorical standard | Permit | Industrial user, clause (2) of the definition |
| Business discharging more than 25,000 gallons per day of domestic-strength waste | Permit | Industrial user, clause (1) |
| Plant already permitted that adds a new industrial discharge | New or amended permit first | 58-322(1) |
| Restaurant with a grease interceptor | Ask the city | 58-306 covers interceptors; the code does not say whether it also makes you an industrial user |
| Office or retail with only sanitary wastewater | Unlikely to be an industrial user | The definition turns on volume (25,000 gallons per day) or on regulated waste |
| Industrial user that completes the city's Pretreatment Permit Survey | May be deemed a Zero Discharger with a Zero Discharge Permit | City Industrial Pretreatment page |
What does this look like in real life?
A food processor adds a second production line. The new line adds a discharge the existing permit does not cover. Section 58-322 says the new discharge needs a new or amended permit before it starts, not after the first batch.
A laundry moves into a vacant building. The city's list names laundries. The owner starts by asking Water Resource Management about the Pretreatment Permit Survey that the city's page mentions.
The edge case: a plant that discharges nothing industrial. The city's page says a Zero Discharger can be issued a Zero Discharge Permit after a survey. That is itself a permit, and the city decides who gets one.
What should you do next?
- 1Describe what drains from the building: process water, cooling water, washdown and sanitary flow. The code defines "industrial waste" as liquid waste from an industrial or manufacturing process, including cooling water.
- 2Call Water Resource Management at 623-222-6000 and ask whether your facility is an industrial user.
- 3If it is, ask for the application form. The code says the application contains "such information as the city may request."
- 4Plan the pretreatment and sampling equipment before you build. Under 58-305 the city reviews pretreatment plans for building code compliance, and "all appropriate permits shall be obtained."
- 5Install a control manhole if the city requires one. Section 58-307 puts that on the owner, with an easement dedicated to the city.
- 6Calendar the quarterly report and keep three years of sampling records.
What do people get wrong?
- Assuming a permit is for big factories only. The 25,000 gallon test is one clause of the definition. Clause (2) reaches any nonresidential user whose waste would be subject to pretreatment requirements.
- Treating the permit as permanent. It runs up to five years and is revocable.
- Assuming approved plans end the obligation. Section 58-305 says approval and inspection "shall not relieve the industrial user" from the article's requirements.
- Reading silence as approval. A permit is "Issued within 60 days of application or deemed to be denied."
Full text and source
The rule is Surprise Municipal Code Sec. 58-322 on Municode, with 58-321 beside it. This is an explanation, and the code text and the city's permit conditions govern.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Mesa | Mesa requires a permit for Class I and Class II industrial users, issues it within 60 days after the application is complete, for no more than five years, and makes it nontransferable. | Mesa City Code 8-4-18(A) Verified October 4, 2026 |
| Tolleson | Tolleson bars discharging industrial wastewater to city sewers without a city permit, and a permit lasts no more than 12 months. | Tolleson City Code 11-2-2(A) Verified October 4, 2026 |
This page explains the rule. The official text at the source above governs.
- Municode: Surprise Municipal Code Sec. 58-322, Permitted user requirements
- Municode: Surprise Municipal Code Sec. 58-321, Authority to issue permits, BMP's and permit conditions
- Municode: Surprise Municipal Code Sec. 58-275, Definitions
- Municode: Surprise Municipal Code Sec. 58-307, Control manholes
- Municode: Surprise Municipal Code Sec. 58-305, Pretreatment
- City page: Surprise Water Resource Management, Industrial Pretreatment
- Mesa Municode: City Code 8-4-18, Class I and II industrial user permit requirements
- Tolleson Municode: City Code 11-2-2, Wastewater discharge permit
Commercial Plumbing in Other Cities
- ChandlerCan a Chandler business get an annual permit for repeat plumbing alterations?
- ChandlerHow long does a commercial tenant improvement permit take in Chandler?
- GilbertDoes your Gilbert business need a Class A or Class B wastewater discharge permit?
- Maricopa CountyDoes a restaurant remodel need Maricopa County plan approval, and what plumbing goes on the plans?
- MesaWhat is Mesa's Annual Facilities Permit for plumbing work? City Code 4-1-4(F)
- MesaDo you need a certificate of occupancy to open or change a Mesa business? City Code 4-1-6
More Surprise Codes and Permits
- Backflow PreventionWhen must a backflow test report reach the City of Surprise?
- Backflow PreventionDoes every Surprise commercial connection need a backflow device?
- Sewer LinesSurprise City Code 58-312(b): permits to repair a commercial sewer lateral
- Sewer LinesSurprise City Code 58-315: where a private sewer ends and the city's begins
- Sewer LinesSurprise City Code 58-425 and 58-218: permits to dig for sewer and water lines
- Water Supply and PipesHow much does the City of Surprise charge to install a water meter?
Related Rules and Questions
- TollesonWhen does Tolleson require pretreatment or a grease interceptor?
- MesaDo you need an industrial wastewater discharge permit in Mesa? City Code 8-4-16 and 8-4-18
- Valley-WideIndustrial Wastewater Pretreatment Permits by Valley City
- ArizonaPhoenix Industrial Wastewater Discharge Permit (City Code Ch. 28)
- FAQDo process or cleaning-chemical changes need advance wastewater notice?
- FAQWhat should an industrial wastewater monitoring report and file contain?
- FAQWhat should a business do when a wastewater test exceeds its permit limit?
