The city can stop all work and investigate before issuing a permit. Work started without one pays an investigation fee ($250 or the permit fee, whichever is greater), a doubled permit fee and a job-site meeting fee. Previous-owner work may qualify for waivers of the investigation, additional permit and meeting charges.
“The permit fee for work commenced without permits shall be twice the published permit fees as set forth in Appendix A.2 of the Phoenix City Code.”
- Applies to:
- Owners, tenants, property managers and contractors who find or perform plumbing work in Phoenix without the permit the code requires, including commercial tenant work
- Official fee:
- Investigation fee $250 or the permit fee, whichever is greater; permit fee 2 times the Table A fee; job-site meeting $195 per hour per inspection discipline, minimum $390 per discipline (PDD Fee Schedule, Ord. G-7465, eff. 2026-01-20)
- In force:
- 2024 PBCC (Ord. G-7397, eff. 2025-08-01); PDD Fee Schedule Ord. G-7465, since August 1, 2025
- Last verified:
- October 4, 2026, against the official page
Plumbing that was done without a permit does not go away when the walls are closed. In Phoenix it can be found at a sale, a tenant improvement or an inspection, and the code sets out exactly what happens next. The answer is a stop-work power, an investigation, and extra charges on top of the permit: an investigation fee, a doubled permit fee and a job-site meeting fee.
What does the Phoenix code say?
Section 114.1.4 makes it unlawful to do work that needs a permit "until such permit has been obtained from the building official and been posted on the premises." Work beyond the authorized scope of a permit counts as work without a permit. It is also unlawful to occupy, use or maintain a building or improvement that was built without a required permit. Each day a violation exists is a separate violation, and the city may use more than one remedy.
For nonpermitted construction, 114.1.4.1 says an investigation is made before a permit can be issued for the work, and that nonpermitted construction "is grounds for the building official to stop all work on the project until appropriate permits are obtained." The applicant must apply for or obtain a permit by the date on the notice of violation, with more time possible for complex work or other justifiable circumstances. Permits for work started without one "must be obtained no later than 60 calendar days from the date of application," again with an exception for more time.
Section 114.1.4.1.3 lists the money. For work started on a plumbing system (or a building, electrical, gas or mechanical system) without the required permit, the section lists these charges:
- 1An investigation fee, assessed "whether or not a permit is then or subsequently issued."
- 2A permit fee at twice the published amount. "The permit fee for work commenced without permits shall be twice the published permit fees as set forth in Appendix A.2 of the Phoenix City Code."
- 3A job-site meeting fee. When the permit is issued, an inspector meets the owner or authorized agent on site to decide the corrective action and set an inspection schedule.
There are two exceptions. The department may waive the investigation fee and the additional permit fee "where it can be demonstrated that the nonpermitted construction was completed by a previous owner." The job-site meeting section adds that the department may waive the job-site meeting fee on the same showing. And if the owner will demolish the unpermitted work, the demolition permit fee applies.
What do the fee lines say?
The Planning and Development fee schedule (Ordinance G-7465, effective January 20, 2026) lists these lines under fees for work done without a permit:
- An investigation fee of "$250 or the permit fee, whichever is greater, but not to exceed $2,500 for every day or portion of a day from the time unpermitted work began until a permit is obtained."
- A Section 114 investigation fee of "$250 or the permit fee per Table A, whichever is greater."
- A Section 114 job-site meeting fee at "$195 per hour per inspection discipline, minimum $390 (2-hours) per inspection discipline."
- A Section 114 permit fee of "2-times the permit fee per Table A, except for Residential Demolition permits."
The schedule lists the general and the Section 114 investigation lines separately. Which line the city applies to a given case is the city's call, so ask the permit counter before you budget.
What do the key terms mean?
- Nonpermitted construction: work that needed a permit and was started or finished without one, or that went beyond what a permit allowed.
- Notice of violation: the written notice that sets the date by which a permit must be obtained.
- Table A: the schedule the city uses to price a plumbing permit from the value of the work.
- Discipline: a trade inspection group, such as plumbing or electrical.
Who does this cover?
Under 114.1.1 the property owner, the tenant or occupant in control of the premises and the person performing the work all have a duty to comply. A commercial tenant that hires an unlicensed installer, a landlord who finds unpermitted piping and the contractor who did the work are all inside the rule.
Quick check: what will I owe?
| Situation | What the code and fee schedule say |
|---|---|
| Plumbing started without a permit, permit applied for | Permit fee twice the Table A amount, plus investigation and job-site meeting fees |
| Work went beyond what the permit covered | Counts as work without a permit |
| Unpermitted work done by a previous owner | Investigation fee, extra permit fee and job-site meeting fee may be waived if that can be shown |
| Owner will remove the unpermitted work | Demolition permit fee applies |
| Permit not obtained by the notice date | More time only if the city grants it for complexity or other justifiable cause |
What does this look like in real life?
- A buyer's inspection finds a new water line with no permit on file. The city investigates before it issues the permit. The owner pays the investigation fee, twice the permit fee and the job-site meeting fee.
- A tenant moves a restroom without pulling a permit. The tenant, the landlord and the installer are each responsible, and the city can stop all work on the project until permits are obtained.
- The same unpermitted line was installed by the prior owner. The answer flips: the department may waive the investigation fee, the additional permit fee and the job-site meeting fee if the owner can show a previous owner did the work.
- A contractor works beyond the scope written on the permit. The extra work is treated as work without a permit, not as a small change.
What should you do next?
- 1Find out whether the work needed a permit. Section 105.2 lists the plumbing work that is exempt, and Planning and Development can confirm if you are unsure.
- 2If it did, stop work and apply for the permit before doing more.
- 3Ask the permit counter which investigation fee line applies and get the fee figure in writing.
- 4If a previous owner did the work, gather what shows it, such as the sale date and the age of the work, to ask for the waiver.
- 5Apply through the city's current SHAPE PHX permitting process and obtain current counter or contact details from Planning and Development.
- 6Meet the date on any notice of violation. If the work is complex, ask for more time before that date passes.
What do people get wrong?
- "Paying the fee fixes it." The fees come on top of the permit and inspections, and the work still has to pass inspection.
- "Only the contractor is responsible." The code puts the duty on the owner, the tenant in control and the person doing the work.
- "A stop-work order is a fine." The code makes nonpermitted construction grounds to stop work. The fees are separate.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Tempe | Tempe charges an investigation fee equal to the permit fee, in addition to the permit fee, for plumbing work begun before the permit. The building official may waive it when extenuating circumstances exist. Because the fee equals the permit fee, the permit and the fee together come to twice the permit fee. | Tempe City Code 8-109 (109.4 Work commenced before a permit issuance) Verified September 29, 2026 |
| Scottsdale | Scottsdale sets a fee double the permit fee that would have been owed, and exempts emergency work if a permit is obtained at the start of the next business day. | Scottsdale City Code 31-7 (IBC 109.4 as amended) Verified September 29, 2026 |
| Mesa | Mesa charges an unauthorized construction fee on top of the permit fee whether or not a permit is later issued. Its fee schedule sets it at 100 percent of the permit fee for licensed professionals and non-residential building owners and 50 percent for non-licensed homeowners, and the director may cut it to 25 percent for a cooperative homeowner who resolves the violation within 30 days of the notice. | Mesa City Code 4-1-8(T); Citywide Schedule of Fees and Charges Verified September 29, 2026 |
This page explains the rule. The official text at the source above governs.
Permits and Inspections in Other Cities
- ChandlerChandler City Code 29-1.3: violations, penalties and stop work orders
- ChandlerWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- ChandlerChandler plumbing and gas work that needs no permit (City Code 29-6.7)
- ChandlerWhich plumbing and gas codes does Chandler enforce?
- ChandlerChandler plumbing inspections: the required list and inspection codes
- ChandlerDo you need a permit to repipe a house in Chandler?
More Phoenix Codes and Permits
- Permits and InspectionsWhich building and plumbing codes does Phoenix enforce?
- Commercial PlumbingCan a Phoenix business get an annual permit for plumbing alterations?
- Backflow PreventionDo you need a permit to install or replace a backflow preventer in Phoenix?
- Commercial PlumbingPhoenix City Code 28-12: Which businesses must install a grease or oil interceptor?
- Commercial PlumbingHow often must a Phoenix restaurant pump its grease interceptor, and what records must it keep?
- Sewer LinesWho pays to extend a sewer main in Phoenix?
Related Rules and Questions
- PhoenixWhich minor commercial plumbing jobs can be permitted online in Phoenix?
- PhoenixWhat permit does a Phoenix business need for a plumbing remodel or tenant improvement?
- PhoenixDo you need a permit to connect to or work on a public sewer in Phoenix?
- PhoenixDo you need a separate permit for a water or sewer tap in Phoenix?
- FAQWhat plumbing work needs a permit in Phoenix?
- FAQDo commercial plumbing repairs need a Phoenix permit?
- FAQWho can pull a commercial plumbing permit in Arizona?
- Commercial Plumbing