Phoenix charges plumbing permit fees by project valuation using Table A of its PDD Fee Schedule. Jobs valued $1 to $1,000 pay a $195 base fee, or $98 for a residential water heater. Above that, the fee steps up per $1,000 of value, and plan review adds 80 to 100 percent of the permit fee when review is required.
“Project valuation is the higher of the minimum project valuation as calculated by Planning & Development, or the project valuation as provided by the applicant.”
- Applies to:
- Homeowners, owner-builders, plumbing contractors and commercial tenants applying for a Phoenix plumbing or gas permit
- Official fee:
- Table A: $98 minimum for residential water heaters and fences, $195 base for $1 to $1,000, then per-$1,000 increments; plan review 100% (valuation $50K or less) or 80% (over $50K) of the permit fee, minimum $195 (PDD Fee Schedule, Ord. G-7465, effective 2026-01-20)
- In force:
- PDD Fee Schedule, Phoenix City Code Chapter 9, Appendix A.2, Ordinance G-7465, since January 20, 2026
- Last verified:
- October 4, 2026, against the official page
There is no single "plumbing permit price" in Phoenix. The city prices the permit off the value of the work, using one table for every building safety permit, so a water heater swap and a full restaurant buildout run through the same math. The detail people miss: Phoenix uses the higher of its own valuation or yours.
What does the Phoenix fee schedule say?
Section 109.2 of Phoenix's amended building code says permit and plan review fees are paid under the schedule in City Code Appendix A.2. That schedule, Ordinance G-7465, took effect January 20, 2026. Section 109.3 says the applicant's valuation must include "the total value of work, including materials and labor," naming plumbing among the systems, and that the valuation "is calculated using the International Code Council Building Valuation Data adjusted for the City of Phoenix." If the building official thinks the figure is too low, "the permit shall be denied" unless the applicant shows detailed estimates.
Table A, the Building Safety Valuation-Based Permit Fee:
| Project valuation | Permit fee |
|---|---|
| $1 to $1,000, residential water heaters and fences | $98 minimum |
| $1 to $1,000 | $195 base fee |
| $1,001 to $10,000 | $195 for the first $1,000, plus $12 per additional $1,000 or fraction |
| $10,001 to $50,000 | $303 for the first $10,000, plus $10 per additional $1,000 or fraction |
| $50,001 to $200,000 | $703 for the first $50,000, plus $9 per additional $1,000 or fraction |
| $200,001 to $1,000,000 | $2,053 for the first $200,000, plus $9 per additional $1,000 or fraction |
| $1,000,001 to $10,000,000 | $9,253 for the first $1,000,000, plus $5 per additional $1,000 or fraction |
| Over $10,000,000 | $54,253 for the first $10,000,000, plus $5 per additional $1,000 or fraction |
Other lines that land on plumbing jobs, from the same schedule:
- Permits valued $1 to $1,000 "include a maximum of two inspections, including reinspections," and more are $195 each.
- General plan review, where valuation exceeds $5,000 and review is required: 100% of the permit fee at $50,000 or less, 80% above $50,000, minimum $195, for both residential and commercial.
- Valuation under $5,000 with a counter review of 15 minutes or less: no plan review fee.
- The first gas, electric or water meter is included; each additional meter per utility is $98.
- Phased, partial and deferred submittal permits: 200% of the permit fee.
What do the key terms mean?
- Valuation: the total value of the permitted work, materials and labor. Phoenix compares your number to its own and uses the higher.
- Or fraction thereof: a partial $1,000 counts as a full one. $4,200 over the first $1,000 is four steps, not 3.2.
- Counter review: a quick review at the counter, as opposed to formal plan review.
Who does this cover?
Anyone pulling a Phoenix building safety permit that includes plumbing or gas work, residential or commercial. The table does not set different rates for contractors and owner-builders.
This does not apply to the separate backflow inspection fee, to fire department permits, or to water and sewer impact fees, which have their own schedules. Work started without a permit pays twice the Table A fee plus other charges under Section 114.
Quick check: what will the permit fee be?
Worked from Table A as published. Your valuation may be raised to the city's figure.
| Job and valuation | Permit fee | Plan review |
|---|---|---|
| Residential water heater, $1 to $1,000 | $98 | None if counter review is 15 minutes or less |
| Small repair permit, $900 | $195 | None if counter review is 15 minutes or less |
| Bathroom plumbing, $4,500 | $195 + 4 x $12 = $243 | None if counter review is 15 minutes or less |
| Restaurant plumbing, $30,000 | $303 + 20 x $10 = $503 | 100% = $503 if review required |
| Tenant buildout, $120,000 | $703 + 70 x $9 = $1,333 | 80% = $1,066.40 |
| City's own example, $250,500 | $2,053 + 51 x $9 = $2,512 | 80% if review required |
What does this look like in real life?
- A homeowner moves a laundry hookup. The work is valued at $3,200. That's $195 plus three $12 steps, $231, and if the counter review takes 15 minutes or less, no plan review fee.
- A café build-out. Plumbing, grease interceptor and gas piping total $48,000. The permit is $303 plus 38 steps of $10, $683, and plan review adds 100% because the valuation is $50,000 or less.
- The same café lists $20,000 to save fees. The answer flips: the code says the city uses the higher valuation, and an underestimate can get the permit denied until detailed estimates are shown.
What should you do next?
- 1Add up the real value of the work, materials and labor, for every system on the permit.
- 2Find the Table A row and count the per-$1,000 steps, rounding any fraction up.
- 3Add plan review if the valuation is over $5,000 and review is required.
- 4Add any extra meter fees ($98 each per utility after the first) and budget for re-inspection fees.
- 5Apply through the city's permit portal and keep the fee receipt with the permit.
What do people get wrong?
- "I can write a low number." Phoenix uses "the higher of" its valuation and yours, and Section 109.3 lets the building official deny an underestimated permit.
- "Plan review is a flat fee." It's a percentage of the permit fee, 100% or 80%, minimum $195.
- "Every small permit includes unlimited inspections." Permits valued $1 to $1,000 include at most two, counting re-inspections.
- "Every Valley city prices it the same." Cave Creek and Chandler use their own valuation tables, with plan review at 65% of the permit fee instead of Phoenix's 80 or 100%.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Cave Creek | Cave Creek uses a steeper valuation table: $47.74 for $1 to $500, and $140.33 for the first $2,000 plus $20.25 per additional $1,000 up to $25,000. Plan review is 65% of the permit fee, minimum $50, and a like-for-like water heater change out is a flat $50.00. | Cave Creek Comprehensive Fee Schedule (as of February 1, 2025), Building Permit Fees Verified October 4, 2026 |
| Chandler | Chandler also uses a valuation table, starting at $50.00 for $1 to $500 and $68.00 for the first $2,000 plus $12.50 per additional $1,000 up to $25,000, with plan review at 65% of the permit fee. Minor residential work such as 1 to 6 plumbing openings has a $100.00 flat fee. | Chandler Fee Schedule 4.6.1, 4.6.2 and 4.6.4(q) (Res. 4703) Verified October 4, 2026 |
This page explains the rule. The official text at the source above governs.
Permits and Inspections in Other Cities
- ChandlerCan you appeal a Chandler building official decision?
- ChandlerChandler City Code 29-1.3: violations, penalties and stop work orders
- ChandlerWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- ChandlerChandler plumbing and gas work that needs no permit (City Code 29-6.7)
- ChandlerWhat must be finished before a Chandler business gets its certificate of occupancy?
- ChandlerWhich plumbing and gas codes does Chandler enforce?
More Phoenix Codes and Permits
- Permits and InspectionsWhich building and plumbing codes does Phoenix enforce?
- Permits and InspectionsHow long is a Phoenix plumbing or building permit good for?
- Permits and InspectionsPBCC 110.3.10.1: Which plumbing inspections does Phoenix require?
- Permits and InspectionsPBCC Section 119: Who may do permitted plumbing work in Phoenix?
- Permits and InspectionsWhat happens if plumbing work is done without a permit in Phoenix?
- Commercial PlumbingCan a Phoenix business get an annual permit for plumbing alterations?
Related Rules and Questions
- PhoenixDo you need a permit to install or replace a backflow preventer in Phoenix?
- PhoenixWhat permit does a Phoenix business need for a plumbing remodel or tenant improvement?
- FAQHow much does a plumbing permit cost in Phoenix and how long does it take?
- FAQHow can I find a Phoenix property’s plumbing permit and inspection records?
- Commercial Plumbing