Skip to main content
24/7 Emergency(602) 675-1555
El Mirage City Code

Does El Mirage require a permit to install a backflow assembly?

Verified October 4, 2026
In Short

Yes. El Mirage City Code 50.128 requires an installation permit from the Department before any required backflow assembly goes in, and a separate permit for each assembly, including a replacement. The code text states a $39 fee, but the next section says fees are set by Council resolution, and the FY26-27 fee schedule has no backflow line.

Official Source
El Mirage City Code 50.128, Permit required (American Legal)
El Mirage City Code 50.128 (Prior Code 14-10-9)
“Installation permits for the installation of all backflow prevention assemblies required by the Department shall be obtained from the Department prior to installation.”
Applies to:
Owners and tenants of commercial properties on the El Mirage water system, and the plumbers and testers who install, replace or test their backflow assemblies
Official fee:
The code text says $39 per permit. Section 50.135 says permit fees are set by Council resolution, and the FY26-27 Adopted Fee Schedule lists no backflow line.
In force:
El Mirage City Code Ch. 50, Water (Prior Code Ch. 14, Art. 10); Uniform Plumbing Code references
Last verified:
October 4, 2026, against the official page

Most Valley cities hand you a table of who needs a backflow assembly. El Mirage's permit section is a different kind of rule: it governs the paperwork around the install, and its fee line does not match the rest of the code. Read both before you budget the job.

What does El Mirage City Code 50.128 say?

The section opens with the permit duty: "Installation permits for the installation of all backflow prevention assemblies required by the Department shall be obtained from the Department prior to installation." It then adds that "A separate permit shall be obtained for each required backflow prevention assembly to be installed, including any replacement." The pieces that follow, labeled (A) through (D):

  • (A), inspection call: the person doing the work notifies the Department, orally or in writing, that the system is ready for inspection. The notice goes in at least 24 hours before the inspection, and only if there is reason to believe the work meets the Uniform Plumbing Code (UPC) and the current USCS standards.
  • (B), stop orders: work done contrary to the UPC or the code can be ordered stopped by written notice, and the person must stop until the Department authorizes the work to proceed.
  • (C), suspension or revocation: the Department may suspend or revoke a permit issued in error, on incorrect information, or in violation of the code.
  • (D), fee: "A fee will be required on all backflow preventions. The fee for the permit is $39."

The installation section just before it requires the customer to install assemblies at the customer's expense, as close to the service connection as possible, on private property unless authorized, in an accessible location the Department approves. Reduced pressure, pressure vacuum breaker and double check assemblies go above ground, and no one may "alter, modify, bypass, or remove" an assembly without the Department's approval.

What do the key terms mean?

  • The Department: the code's own term for the city office running the program. The permit section does not name the office; the city's Permit Center page lists Development Services at 623-876-2977.
  • Required assembly: one called for by the installation list in Section 50.125, which marks most commercial activities (commercial dishwashers, food preparation and carbonation equipment, ice makers, cooling systems) with an RPA, a reduced pressure principle assembly.
  • Replacement: counted as an installation, so it gets its own permit.
  • USCS: the code uses the abbreviation without defining it in this section.

Who does this cover?

Any customer on the El Mirage water system whose premises need an assembly. A new tenant with a new ice maker, a restaurant replacing a failed RPA and a property owner adding irrigation backflow all need a permit before the work, because the duty attaches to installing the assembly, not to the kind of business.

What happens with the fee?

The code text says $39, but two other sections complicate it.

Section 50.135 says "The fee for any permit required pursuant to the terms of this subchapter shall be established and modified by Council resolution from time to time." Section 50.134(C) adds that the initial installation permit fee "shall be waived by the Department for retrofit premises only."

Then check the posted schedule. The Adopted Fee Schedule FY26-27, linked from the city's Permit Center page, has no line naming backflow. So $39 is the figure printed in the code, and the schedule is silent on it.

Quick check: which situation are you in?

SituationWhat the code saysPermit
New assembly on a new serviceInstall per 50.128Yes, before installation
Replacing a failed assembly"including any replacement"Yes, a separate permit
Where the assembly goesAccessible location the Department approves; reduced pressure, pressure vacuum breaker and double check assemblies above ground (50.125(B))Location is part of the installation the permit covers
Existing premises ordered to retrofitRetrofit rule in 50.134Required, with the initial permit fee waived
Ready for inspectionNotice at least 24 hours ahead, only if the work should meet the UPC and current USCS standards (50.128(A))Part of the permit
Work contrary to the UPC or the codeWritten stop order until the Department authorizes the work to proceed (50.128(B))Permit can also be suspended or revoked (50.128(C))
Assembly bypassed or removed without approvalDisconnection after the 50.131(C) notices, starting with a 45-day noticeNot a permit matter; a violation
Repair of an existing assembly50.128 names installation and replacement, and says nothing about repairsNot stated in the code

What does this look like in real life?

A restaurant replaces a failed RPA on its service line. The permit section says a replacement counts. The plumber pulls a permit before swapping the unit, calls for inspection with at least 24 hours notice, and the certified tester reports the results to the Department.

A new tenant adds a commercial ice maker. The ice maker row in Section 50.125 marks an RPA, so the tenant needs an assembly and a permit for it.

The edge case: a repair that stops short of replacement. Rebuilding the internals is not named in 50.128, which covers installation and replacement. The code gives the Department the call on what it requires.

What should you do next?

  1. 1Check Section 50.125 for your equipment and note the assembly the Department will expect.
  2. 2Call Development Services at 623-876-2977 and ask for the permit, the current backflow permit fee and the inspection process.
  3. 3Have the assembly installed above ground, accessible and close to the service connection, with the Department's approval of the location.
  4. 4Give the Department at least 24 hours notice for the inspection.
  5. 5Book a certified tester. The annual testing section requires an individual certified through the American Water Works Association who is approved by the Department, and the tester sends the results to the Department.
  6. 6Keep the permit, the test report and the inspection record with the lease or property file.

What do people get wrong?

  • Assuming a replacement is just maintenance. The code says each permit covers an assembly, "including any replacement."
  • Treating $39 as a settled number. Section 50.135 says fees are set by Council resolution, and the posted FY26-27 schedule has no backflow line.
  • Calling for inspection too early. The inspection notice is only supposed to go in when there is reason to believe the work will meet UPC standards.
  • Leaving the assembly bypassed during a repair. The installation section bars bypassing or removing one without the Department's approval, and the city may disconnect service for a bypassed assembly under Section 50.131.

What happens if you skip the permit?

The code lists a penalty cross-reference in Section 50.999 for the permit section. Beyond that, the Department may issue a written stop order, suspend or revoke a permit, and, for an assembly that was never installed, improperly tested, bypassed or removed, disconnect water service to the connection if the problem is not fixed within the time in its notice. Section 50.131(C) requires a notice first, describing the condition and giving 45 days from the initial inspection date to fix it.

Full text and source

The rule is El Mirage City Code 50.128 on American Legal, with Sections 50.125, 50.131, 50.134 and 50.135 beside it. HQ tests, repairs and replaces domestic backflow assemblies. This page is an explanation, and the code text governs.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
ScottsdaleScottsdale also ties the permit to the installation and adds a clock: the user obtains a permit for the assembly and completes the installation within 45 days. El Mirage's section sets no completion deadline for a permit holder.Scottsdale City Code 49-63(a)
Verified October 4, 2026
TempeTempe handles approval earlier, on the plans: assemblies are specified and located on the construction plans for new buildings, additions with new services and changes of use, and approval is obtained before the building permit issues.Tempe City Code 33-103(c)
Verified October 4, 2026
SurpriseSurprise starts from the connection, not a permit: an approved device is required on all commercial and industrial connections, and a customer told to install one has 45 days to install, test and submit documentation.Surprise Municipal Code 58-260(a) and (c)
Verified October 4, 2026

This page explains the rule. The official text at the source above governs.

Sources

Backflow Prevention in Other Cities

More El Mirage Codes and Permits

Related Rules and Questions

Questions About El Mirage Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.