What rainfall rate does El Mirage use to size roof drains and storm drains?

Verified November 15, 2026
In Short

El Mirage sizes roof leaders, building storm drains, storm sewers and their horizontal branches for 3 inches of rain per hour. Its amendment to plumbing code Section 1106.1 strikes the model code's 100 year rainfall map and local weather data and puts one fixed figure in their place.

Official Source
City of El Mirage: Building Safety (current adopted codes and the Adopted Codes and Amendments PDF)
El Mirage amendments to the 2018 International Plumbing Code, Section 1106.1 (Resolution R23-05-10, City Code 150.001)
“shall be based on AN HOURLY RAINFALL RATE OF THREE (3) INCHES PER HOUR.”
Applies to:
Designers, contractors and building owners sizing roof drains, leaders and building storm drainage for commercial, multifamily and other permitted buildings inside El Mirage city limits
In force:
2018 International Plumbing Code with El Mirage amendments, adopted by Resolution R23-05-10 (passed May 2023, effective July 1, 2023), since July 1, 2023
Last verified:
November 15, 2026, against the official page

In El Mirage, AZ, roof drains and building storm drains are sized for 3 inches of rain per hour. The city wrote that figure into Section 1106.1 of its plumbing code when it adopted the 2018 codes in 2023, striking the model code's reference to a 100 year rainfall map and to local weather data. So every leader, storm drain and storm sewer on an El Mirage plan set starts from the same number.

What does El Mirage's amended IPC 1106.1 say?

El Mirage enforces the 2018 International Plumbing Code, listed on the city's Building Safety page, with local changes adopted by Resolution R23-05-10 and in force since July 1, 2023. Section 1106.1, "General," under "Size of Conductors, Leaders and Storm Drains," reads that the size of the vertical conductors and leaders, building storm drains, building storm sewers, and any horizontal branches of such drains or sewers "shall be based on AN HOURLY RAINFALL RATE OF THREE (3) INCHES PER HOUR." The capital letters are the city's added words.

The words the city struck are the model code's way of choosing the figure: "the 100 year hourly rainfall rate indicated in Figure 1106.1 or on other rainfall rates determined from approved local weather data." With those gone, a designer in El Mirage does not read a rainfall map or argue for a local figure. The rate is 3 inches per hour.

What do the key terms mean?

  • Conductor or leader. The vertical pipe that carries roof water down from a roof drain.
  • Building storm drain. The horizontal storm pipe inside or under the building.
  • Building storm sewer. The storm pipe that runs from the building to where the water is discharged.
  • Horizontal branch. A sloped storm pipe that collects water from more than one roof drain before it joins the storm drain.
  • Hourly rainfall rate. The design intensity, in inches of rain per hour, that every pipe in the storm system is sized to carry.

Who does this cover?

Designers and contractors on commercial, multifamily and other buildings in El Mirage that carry roof water through pipes: a strip center with interior roof drains, a warehouse with leaders down the walls, an apartment building with a storm line to a retention area. A single-family house is built under the residential code, which this page does not cover.

Quick check: how much water do the pipes have to carry?

Mesa's plan checklist states the arithmetic most Valley reviewers use: roof area in square feet times 0.0104 times inches of rain per hour equals gallons per minute. At El Mirage's 3 inches per hour, that works out as below. The roof areas are examples, not project data.

Roof area servedRain rateFlow to size for (gpm)
2,500 sq ft3 in/hr2,500 x 0.0104 x 3 = 78
8,000 sq ft3 in/hr8,000 x 0.0104 x 3 = 250
15,000 sq ft3 in/hr15,000 x 0.0104 x 3 = 468

The flow rises in a straight line with the rainfall figure. A design carried over from a city or a map that used a lower rate gives a smaller number than El Mirage's 3 inches and can leave the leaders and storm drain undersized for the plan review.

How does El Mirage compare with its neighbors?

Phoenix and Mesa amend the same section to the same 3 inches per hour, so a design done for either city uses the same rate in El Mirage. The difference is the code edition: Phoenix and Mesa enforce the 2024 plumbing code, while El Mirage still enforces the 2018 edition with its 2023 amendments. Section numbers line up for this rule, but check the edition before you copy a detail from another city's plan set.

What does this look like in real life?

A new retail pad. The engineer runs each roof area at 3 inches per hour, sizes the leaders and the storm drain from the code tables, and shows the calculation on the plumbing sheets. The plans also show where the storm sewer discharges on the site.

A roof replacement with new drains. The roofer moves two drains. The leaders that serve them are checked again at 3 inches per hour for the roof area each one now collects, not the area it collected before.

The edge case. A plan set from a project elsewhere sized at a lower rate. The pipe sizes may look close, but El Mirage's reviewer checks them at 3 inches per hour, so run the numbers again before you submit.

What should you do next?

  1. 1Confirm the address is inside El Mirage city limits. An unincorporated address goes to Maricopa County, which follows its own amendments.
  2. 2Measure the roof area that drains to each roof drain or scupper from the architectural plans.
  3. 3Run the flow at 3 inches per hour using the equation above and record it on the plumbing sheets.
  4. 4Size the leaders, horizontal branches and storm drain from that flow with the plumbing code's sizing tables.
  5. 5Show where the storm water goes, whether a retention basin, a drywell or the street, and ask Development Services whether that part needs its own review. Our Valley retention basin and drywell guide compares how the cities treat on-site storm water.
  6. 6Pull the permit before work starts. El Mirage's Building Permits page says permits are required for repair or replacement work on systems related to mechanical, electrical or plumbing, and applications go through ELM Online Permits.

Storm lines that are sized right still fill with silt, leaves and trash. HQ Plumbing & Air cleans commercial drywells across the Valley, taking the sludge layer off the leach rock until the well drains again, and clears parking lot and retention basin drainage, catch basins and storm lines, starting at the grate. See parking lot and retention basin drainage, catch basin cleaning and storm line jetting or commercial drywell cleaning. For the design side, read how to size a roof drain, leader and storm pipe. For El Mirage's other plumbing rules, see its grease interceptor requirements.

What do people get wrong?

  • "Use the rainfall map in the code book." El Mirage struck the map reference and set 3 inches per hour.
  • "A local weather study can justify a lower rate." The city struck the local weather data option too.
  • "El Mirage is on the 2024 codes like Phoenix." El Mirage still enforces the 2018 editions with its 2023 amendments, even though the rainfall rate matches.
  • "Storm water can go into the sewer." Storm drainage and the sanitary sewer are separate systems; see whether storm drains and sanitary sewers connect.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
PhoenixPhoenix also amends IPC 1106.1 to size storm drainage on 3 inches of rain per hour. Its stated reason is that the 2024 IPC and UPC list Phoenix at 2.5 and 2.2 inches per hour, and 3 inches keeps the number consistent with earlier amendments and the sizing tables. 2024 IPC.Phoenix Building Construction Code, 2024 IPC amendment to Section 1106.1 (Ord. G-7397)
Verified September 29, 2026
MesaMesa's amended 1106.1 sizes leaders, building storm drains, storm sewers and horizontal branches on 3 inches per hour, and its plan checklist gives the equation: roof area times 0.0104 times inches of rain equals gallons per minute. 2024 IPC.Mesa City Code 4-5-2, IPC 1106.1 (as amended); city plumbing plan checklist, Roof Drainage
Verified October 4, 2026

This page explains the rule. The official text at the source above governs.

Sources
Talk to a plumber

Need this done to El Mirage code?

We pull the permit when the job needs one and do the work to the code on this page. For restaurants, offices and rental properties, we schedule it around your hours.

  • 24/7 emergency service
  • Licensed and insured
  • Upfront pricing
  • Free estimates
See /services/parking-lot-and-retention-basin-drainage

Drains, Traps and Vents in Other Cities

More El Mirage Codes and Permits

Related Rules and Questions

Questions About El Mirage Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.