Scottsdale Revised Code Sec. 49-21 sets the charge by meter size. A 3/4 inch meter is $370, the service line $2,410, or $2,730 for both; a 2 inch meter with service line is $4,790. Meters 3 inches and larger are billed at cost recovery and need concrete vaults. Outside city limits the charge is 125 percent.
“The City shall tap the water main, install water service line to the property line, water meter boxes, or meter vaults, within the City and charge the contractor or owner at the rates noted below.”
- Applies to:
- Owners, builders, developers and licensed contractors adding or upsizing a Scottsdale water service, homes and commercial sites; county island customers served by Scottsdale
- Official fee:
- Sec. 49-21(a): 5/8 in $340 meter, $2,400 service line, $2,690 both; 3/4 in $370 / $2,410 / $2,730; 1 in $490 / $2,440 / $2,880; 1.5 in $710 / $3,750 / $4,400; 2 in $930 / $3,920 / $4,790; 3 to 8 in cost recovery. 125 percent outside city limits (49-21(c)).
- In force:
- Scottsdale Revised Code Sec. 49-21 as amended by Res. No. 13395 (2025-05-20); Sec. 49-27; Municode Supplement 80
- Last verified:
- October 4, 2026, against the official page
A new Scottsdale water service has two price questions: who taps the main, and what size meter. City code answers both in two short sections. Sec. 49-21 is the fee table. Sec. 49-27 decides how big the meter can be and how many you can have, and it rules out a common workaround for big flows.
What do Secs. 49-21 and 49-27 say?
Sec. 49-21(a) opens with who does the work: "The City shall tap the water main, install water service line to the property line, water meter boxes, or meter vaults, within the City and charge the contractor or owner at the rates noted below." When a state-licensed contractor taps the line and installs the service line and box or vault to city inspection standards, the city supplies the meter in 5/8 to 2 inch sizes, and furnishes the meter with strainer in 3, 4, 6 and 8 inch sizes, at these rates:
| Meter size | Meter | Service line | Meter and service line | Fee type |
|---|---|---|---|---|
| 5/8 inch | $340 | $2,400 | $2,690 | Flat fee |
| 3/4 inch | $370 | $2,410 | $2,730 | Flat fee |
| 1 inch | $490 | $2,440 | $2,880 | Flat fee |
| 1.5 inch | $710 | $3,750 | $4,400 | Flat fee |
| 2 inch | $930 | $3,920 | $4,790 | Flat fee |
| 3, 4, 6 and 8 inch | Cost recovery required | Billed at city cost |
The footnotes add three rules. Large meters: "Concrete water vaults are required for all 3", 4", 6" and 8" meters to be installed by Developer/contractor." The meter charge includes delivery and connection to an existing service line. And a home that upsizes its meter "due to fire suppression requirements" may get a refund of the meter-only charge, up to a prorated value.
The rest of the section:
- (b) Fire sprinkler services. The city taps and installs only 1.5 and 2 inch commercial fire sprinkler services. Larger fire lines are installed by state-licensed contractors approved by the city. Manifolds or tees tying several 2 inch and smaller service lines together are prohibited unless the Water Resources Division approves.
- (c) Outside the city. Connections outside city limits or in a county island cost 125 percent of the table.
- (d) Meter changes. Upgrades and downgrades happen "only on accounts in good standing."
Sec. 49-27 then sets the size and count. A meter "shall be sized so that it does not exceed the anticipated maximum normal daily operating flow" under the city's Design Standards and Policies Manual. "Single-Family residences shall be limited to one water meter and one Account Holder per parcel." A second or redundant meter needs division director approval, and "Two (2) or more meters in a manifold configuration are prohibited."
What do the key terms mean?
- Tap. The connection cut into the city water main.
- Service line. The pipe from the main to the property line, where the meter box sits.
- Cost recovery. The city bills its actual cost instead of a flat fee.
- Manifold meter. Two or more meters piped in parallel to act as one larger meter. Sec. 49-16 defines it; Sec. 49-27 bans it.
- County island. Unincorporated land surrounded by the city but served by city water.
Who does this cover?
Anyone adding or changing a Scottsdale water service: owners of new homes and guest houses, builders, developers and commercial tenants needing a bigger meter. This does not cover the private pipe from the meter to the building. That is the owner's plumbing, not priced in this table. It also does not include water and wastewater development fees, which are a separate charge under Sec. 49-82.
Quick check: which charge applies?
| Situation | Charge under 49-21 | Why |
|---|---|---|
| New home, city taps and installs a 3/4 inch service | $2,730 fee | Meter and service line column |
| Contractor installs the service, city supplies a 1 inch meter | $490 fee | Meter-only column |
| Restaurant needs a 3 inch meter | Cost recovery plus concrete vault | 3 inch and larger rule |
| Home upsizes for a fire sprinkler system | Meter-only refund may apply, prorated | Footnote (1) |
| County island lot, 3/4 inch meter and line | 125 percent of the $2,730 fee | 49-21(c) |
| Second meter for a guest house on one lot | Not allowed without director approval | 49-27 single-family rule |
| Business wants a smaller meter | Down-size request to the One Stop Shop with a minimum review fee | Water and Sewer Planning page |
What does this look like in real life?
A Cactus Corridor remodel. The owners add a pool, a casita and more bathrooms and ask for a 1 inch meter on their existing service line. The meter column says it "Includes delivery and connection to existing service line," so the 1 inch meter fee ($490) is the one that fits. The account has to be in good standing before the change.
A medical office building. The engineer's peak flow calls for a 3 inch domestic meter. That moves the job into cost recovery, with a concrete vault built by the contractor after the city coordinates the service.
The edge case. A developer proposes two 2 inch meters side by side instead of one 3 inch, hoping to stay on the flat-fee table. Sec. 49-27 prohibits two or more meters in a manifold configuration, and 49-21(b) bars tying service lines together without division approval. The answer flips to a single larger meter at cost recovery.
What should you do next?
- 1Have your designer calculate the maximum normal daily operating flow under the city's Design Standards and Policies Manual.
- 2Pick the meter size from that flow, not from pipe size.
- 3Decide whether the city or a state-licensed contractor installs the tap and service line.
- 4If the service crosses the street or sidewalk, get the city's right-of-way permit first (see Scottsdale right-of-way permits).
- 5Clear any past-due balance before asking for a meter change. To go smaller, file a down-size request at the One Stop Shop. Scottsdale's Water and Sewer Planning page says a building with a fire sprinkler system needs the seal of "a Fire Protection Engineer or NICET level three" on the request. Scottsdale also tells the owner to get "a Minimum Plumbing Permit for connecting to the new meter."
- 6Ask Water Resources, 480-312-5650, for the cost-recovery estimate on any 3 inch or larger meter.
What do people get wrong?
- Myth: the meter fee is the whole bill. Development fees under Sec. 49-82 are separate.
- Myth: two small meters are cheaper than one big one. Manifold meters are prohibited in Scottsdale.
- Myth: the county rate is the same. County island connections cost 125 percent of the city table.
- Myth: a fire-sprinkler upsize gets no break. The code allows a prorated refund of the meter-only charge for a residential upsize driven by fire suppression requirements.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Chandler | Chandler's city-installed service line and meter box is $1,819 for a 3/4 inch meter, $1,847 for 1 inch, $1,942 for 1.5 inch and $2,044 for 2 inch inside the city, plus city costs for concrete and asphalt repair in the right-of-way. Outside the city it is 1.4 times the inside fee. | Chandler City Code 50-9.1 Verified October 4, 2026 |
| Mesa | Mesa adds a water and wastewater capacity fee by meter size for new or upsized connections. A building permit holder pays it when requesting a connection, and an upsize is charged only the increase from the original meter size. | Mesa City Code 8-10-13 Verified October 4, 2026 |
This page explains the rule. The official text at the source above governs.
Water Supply and Pipes in Other Cities
- ChandlerWhat are Chandler's water and sewer development fees for a business?
- ChandlerHow do you get a Chandler water meter tested for accuracy?
- ChandlerChandler water meter installation fee: 50-9 schedule by meter size
- GlendaleWhat does a new commercial water meter cost in Glendale, and when is it set?
- SurpriseHow much does the City of Surprise charge to install a water meter?
- TempeTempe water tap and development fees by meter size for commercial service
More Scottsdale Codes and Permits
- Water Supply and PipesWhen do Scottsdale commercial projects pay water and sewer development fees?
- Backflow PreventionHow often must a Scottsdale backflow assembly be tested, and by whom?
- Backflow PreventionWhich backflow assembly types does Scottsdale recognize, and how does it rate hazards?
- Backflow PreventionWhen does a Scottsdale fire sprinkler system need a double check assembly?
- Backflow PreventionDo you need a permit to install a backflow preventer in Scottsdale?
- Backflow PreventionWhat happens if you miss a Scottsdale backflow deadline?
Related Rules and Questions
- MesaMesa water and sewer capacity fees for a commercial project: City Code 8-10-13 and 5-17-5
- Valley-WideWater and Sewer Tap Permits and City Fees, by Valley City
- ScottsdaleDoes Scottsdale require a permit to dig in the right-of-way for plumbing?
- FAQWhat sets the meter size and capacity fee for a commercial building?
- FAQHow do I use my water meter to check for a leak?
- Commercial Plumbing