Scottsdale adopts the 2021 IPC with Appendices B, D and E, and the 2021 IFGC with city amendments. Its current code-set page lists January 1, 2023, while the IFGC ordinance note says January 1, 2022. Scottsdale uses the IPC rather than the UPC; check its amendments for the proposed work.
“The International Plumbing Code (IPC), 2021 Edition, including Appendices B, D and E, as published by the International Code Council, Inc., declared a public record by city Resolution No. 12501, are adopted by reference”
- Applies to:
- Homeowners, plumbing contractors, designers, restaurant and building owners in the City of Scottsdale
- Official fee:
- not applicable
- In force:
- 2021 IPC (Appendices B, D, E) and 2021 IFGC (Appendices A, B) with Scottsdale amendments (Ord. 4550, Res. 12501 and 12502), since January 1, 2023
- Last verified:
- October 4, 2026, against the official page
Scottsdale writes its plumbing rules as the International Plumbing Code (IPC) plus a short list of city changes. The surprise for anyone who works in Phoenix is that Scottsdale currently adopts the IPC rather than the Uniform Plumbing Code (UPC), so the two cities can give different answers to the same question.
What does Scottsdale adopt?
Section 31-80 adopts the 2021 IPC with Appendices B (rainfall rates), D (design temperatures) and E (sizing of water piping). Section 31-88 says only those three appendices are adopted, so the other IPC appendices are not part of Scottsdale's code. Section 31-100 adopts the 2021 International Fuel Gas Code (IFGC) with Appendices A (gas pipe sizing) and B (vent sizing).
The city's Building Code Information page lists the 2021 amendment set as effective January 1, 2023. One wrinkle: the ordinance line under the fuel gas sections in the code reads "eff. 1-1-22", while the plumbing sections read "eff. 1-1-23". The city's own page uses 2023 for the whole set.
What do Scottsdale's amendments change?
Scottsdale amends only a few places. Everything else is the 2021 IPC as published.
| IPC chapter | Scottsdale section | What changes |
|---|---|---|
| Chapter 1 | 31-81 | Administration follows the city's amendments to IBC Chapter 1 where the two conflict |
| Chapter 3 | 31-82 | Building sewers go at least 12 inches below finished grade |
| Chapter 4 | 31-83 | Water dispensers with drinking fountains, a trench drain at the threshold of a curbless shower, a water supply at every waterless urinal |
| Chapter 6 | 31-84 | Water service pipe at least 1 inch inside diameter, replacements at least the old size, and lower maximum flow rates in Table 604.4 |
| Chapter 10 | 31-85 | Grease interceptor rules, maintenance and enforcement (see the interceptor page) |
| Chapter 11 | 31-86 | Scuppers kept 3 feet from electric and gas meters; the combined sanitary and storm sewer section deleted |
| Chapter 12 | 31-87 | Special inspections for medical gas and oxygen systems |
For fuel gas, Section 31-102 adds one exception to the IFGC vent termination rule for houses with flat to 6/12 roofs.
What do the key terms mean?
- Adopted by reference: the city did not retype the IPC. It made the ICC's published book the law, then listed what it changed.
- Amendment: a city change that overrides the model text on that point only.
- Model code: the ICC book. The UPC is a different book from a different publisher, so a UPC table is not Scottsdale law unless the city amendments say so.
Who does this cover?
It covers plumbing and fuel gas work inside the City of Scottsdale, residential and commercial, for owners, contractors and designers. It does not cover Paradise Valley, which has its own town code, or unincorporated Maricopa County. State law such as A.R.S. 32-1121 sits on top of the city code and is not changed by it.
Quick check: which rule applies to your job?
| Job in Scottsdale | Rule that applies | Where |
|---|---|---|
| New building sewer | At least 12 inches below finished grade | 31-82 |
| New water service line | At least 1 inch inside diameter | 31-84 |
| Replacing an old service line | At least the same size as the pipe replaced | 31-84 |
| Curbless shower | Trench drain at the threshold | 31-83 |
| Waterless urinal | A water supply at the rough-in | 31-83 |
| Toilet | 1.28 gallons per flush; 1.6 allowed when connected to existing drain piping | 31-84, Table 604.4 |
| Restaurant kitchen | Interceptor rules in Chapter 10 as amended | 31-85 |
| Gas vent on a flat-roof house | Twelve inches above the roof if the vent is 8 inches or smaller and 4 feet from a wall | 31-102 |
What does this look like in real life?
A plumber who mostly works in Phoenix. A plan set that sizes water piping with UPC tables is working from a book Scottsdale did not adopt. Scottsdale adopted IPC Appendix E for sizing the water piping system.
A remodeled bathroom in an older Old Town home. The new toilet must meet the 1.28 gallon rating in Table 604.4. The exception for 1.6 gallons applies only where the toilet connects to existing drain piping, so check which case your job is.
The edge case: a very large house. Section 31-84 adds that when a single-family home has more than 12,000 square feet under roof, the meter must be at least 1 1/2 inches and the supply pipe from the meter at least 2 inches. Below that size, the 1 inch minimum governs.
What should you do next?
- 1Open the code text on Municode using the link in the key facts above and read Sections 31-81 to 31-88 for the IPC, or 31-101 to 31-103 for gas.
- 2Download the city's 2021 IPC amendment PDF from the Building Code Information page if you want the amendments in one document.
- 3Use the current plan-submittal process linked from Scottsdale's One Stop Shop and confirm the permit workflow for your project.
- 4For projects started after January 6, 2026, use the Scottsdale SPUR portal to request inspections. Older projects still use the legacy eServices system.
What do people get wrong?
- "Scottsdale uses the same code as Phoenix." Phoenix adopted the UPC alongside the IPC. Scottsdale adopted only the IPC, and the code text says so.
- "The IPC amendments are just paperwork." Several are design rules, such as the 12 inch sewer depth, the shower trench drain and the water service size.
- "The gas code date is unclear." The fuel gas sections carry a 2022 date in the code, but the city lists the 2021 amendments as effective January 1, 2023. The code text and the city page differ only on the date. Both name the 2021 IFGC.
This page summarizes the code. The adopted text on Municode governs.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Phoenix | Both the 2024 IPC and the 2024 Uniform Plumbing Code are adopted, along with the 2024 IFGC, effective August 1, 2025 (Ordinance G-7397). A Phoenix design can follow either plumbing code. | Phoenix Construction Code History, TRT 00550 (Rev. 08/25) Verified October 4, 2026 |
| Chandler | The 2024 IPC with Chandler amendments. Chandler is three years ahead of Scottsdale on the model code edition and also does not use the UPC. | Chandler City Code 29-4 Verified October 4, 2026 |
| Paradise Valley | The 2015 IPC with Town amendments. The town next door to Scottsdale is two editions behind. | Paradise Valley Town Code 5-5-1 Verified October 4, 2026 |
This page explains the rule. The official text at the source above governs.
Permits and Inspections in Other Cities
- ChandlerWhich plumbing and gas codes does Chandler enforce?
- GlendaleWhat plumbing and gas code does Glendale use?
- PhoenixWhich building and plumbing codes does Phoenix enforce?
- ChandlerChandler City Code 29-1.3: violations, penalties and stop work orders
- ChandlerWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- ChandlerChandler plumbing and gas work that needs no permit (City Code 29-6.7)
More Scottsdale Codes and Permits
- Permits and InspectionsDoes Scottsdale require a permit to dig in the right-of-way for plumbing?
- Backflow PreventionHow often must a Scottsdale backflow assembly be tested, and by whom?
- Backflow PreventionWhich backflow assembly types does Scottsdale recognize, and how does it rate hazards?
- Backflow PreventionWhen does a Scottsdale fire sprinkler system need a double check assembly?
- Backflow PreventionDo you need a permit to install a backflow preventer in Scottsdale?
- Backflow PreventionWhat happens if you miss a Scottsdale backflow deadline?
Related Rules and Questions
- ScottsdaleWhen does Scottsdale require a grease interceptor?
- ScottsdaleWhat size grease interceptor does Scottsdale require?
- UPCUPC 1003: Which Fixture Traps Are Allowed (and Banned)
- ArizonaA.R.S. 32-1121: Arizona's Owner-Builder and Handyman Licensing Exemptions
- FAQDo I need a permit to remodel a bathroom in Phoenix?
- FAQHow can I tell the age and condition of a home's plumbing?
- Commercial Plumbing
