Does Scottsdale require a permit to dig in the right-of-way for plumbing?

Verified October 4, 2026
In Short

Yes. Scottsdale requires a Permit to Work in the Right-of-Way (PWR) for borings, potholing, curb cuts, barricades and any work that builds, installs or repairs improvements in the street. Regular utility maintenance can use an annual PWR. The city may require a cash deposit or letter of credit on busier streets.

Official Source
Scottsdale Revised Code Sec. 47-50, Use of the right-of-way, PWR (Municode)
Scottsdale Revised Code Sec. 47-50 (PWR) and Sec. 47-51 (PIR)
“A person proposing to use the right-of-way other than for its public uses must have a permit to work in the right-of-way (PWR).”
Applies to:
Plumbing contractors, general contractors, property managers and owners doing water, sewer or gas work in a Scottsdale street, alley or right-of-way
Official fee:
Set by City Council under Chapter 47; not repeated here. Ask the Right-of-Way Supervisor for the current schedule
In force:
Scottsdale Revised Code Sec. 47-50 to 47-52 (Ord. No. 4389, 2019)
Last verified:
October 4, 2026, against the official page

Plumbing work stops at the property line for most owners, but water services, sewer taps and gas laterals all cross it. In Scottsdale, the moment a trench or bore touches the street, alley or another right-of-way, a separate permit applies.

What does Sec. 47-50 say?

A person who wants to use the right-of-way for anything other than its public uses must have a Permit to Work in the Right-of-Way, called a PWR. Some public uses also need one. A person who uses the right-of-way regularly may be issued an annual PWR. If it is unclear which applies, the Right-of-Way Supervisor decides, and that decision is final.

The code lists examples that need a PWR, which include:

  • Working in the right-of-way to construct, install, maintain or modify public or private improvements.
  • Using the right-of-way for barricades for that work.
  • Borings and potholing.
  • Curb cuts.
  • Roll-off dumpsters and special events in the right-of-way.
  • Testing utilities, including fire hydrants.

An annual PWR covers uses such as utility maintenance and repair and commercial landscape maintenance.

Every PWR holder must:

  • Get any additional permits needed, such as a building permit, barricade plan, private improvement permit or native plant permit.
  • Do safe, workmanlike work that meets the improvement standards in Article III of Chapter 47.
  • Follow all federal, state, county and city laws, and the permit and approved plans.
  • Carry the insurance the city's Design Standards and Policies Manual requires, and indemnify the city.
  • Keep the PWR and any barricade plan on site while work is going on.

The city may require a cash deposit or letter of credit if the project impairs or destroys existing public improvements, or if the work is on a collector or higher volume street in the Transportation Master Plan. The city may revoke a PWR for cause, and if the holder violates it the city may cure the violation at the holder's cost.

What do the key terms mean?

  • Right-of-way: the public area or interest for streets, alleys and sidewalks. Work in it is under the city's control even if the utility line serves your building.
  • PWR versus PIR: a PWR covers the act of working in the right-of-way. A permit for private improvements (PIR) covers something private that stays there, such as a private structure. Sec. 47-51(b) says a pipe or conduit carrying city water from the meter to the private use, or waste water from the private use to the city sewer connection, does not need a PIR.
  • Annual PWR: a permit for routine repeated work, such as a utility crew's maintenance. A one-time plumbing repair normally uses a standard PWR.

Who does this cover?

Anyone doing the work: a plumbing contractor repairing a sewer lateral in the street, a general contractor boring for a new water service, or an owner hiring either. The permit covers work in the right-of-way only. Work on private property follows the building and plumbing permit rules. Section 47-52 adds that a PWR does not excuse a violation of any other city code.

Quick check: does your job need a PWR?

JobPWR needed?Why
Tapping the public sewer or repairing the lateral in the streetYesWork in the right-of-way; see also 49-115
Potholing to find a utilityYesNamed example in 47-50(b)
Boring under the street for a new lineYesNamed example
Cutting a curb for a driveway or lineYesNamed example
Placing a roll-off dumpster in the alleyYesNamed example
Regular utility maintenance by a utilityAnnual PWRNamed example
Pipe from the meter to the buildingNo PIR47-51(b), but a PWR applies to the digging if it is in the right-of-way

What does this look like in real life?

A restaurant with a failed lateral. The line is broken under the alley. The contractor pulls a PWR, gets barricade approval if lanes close, and restores the alley. The city's sewer excavation rule in Sec. 49-115 says the same permit route applies.

A new tenant that needs a bigger water service. The line crosses the street. The contractor bores under the street with a PWR and, because of a busy collector street, may post a deposit or letter of credit.

The edge case: the question of which permit. The Right-of-Way Supervisor's decision on PWR versus annual PWR is final. Ask before you start rather than after a stop-work call.

What should you do next?

  1. 1Find the property line on your plat or survey and mark where the work crosses it.
  2. 2Ask your contractor whether the digging is in the right-of-way. If it is, the PWR is on them and on the schedule.
  3. 3Ask the Right-of-Way Supervisor how the city wants the application filed and whether a barricade plan is needed.
  4. 4Line up insurance certificates before you apply, since the code requires the insurance in the city's manual.
  5. 5Keep the PWR on site and schedule the city's inspection when work is done.

What do people get wrong?

  • "A plumbing permit covers the street." The building permit does not cover work in the right-of-way. The PWR is separate.
  • "Potholing is just looking." The code names borings and potholing as PWR work.
  • "The permit fixes a code problem." Sec. 47-52 says a permit cannot authorize a violation of another code.

This page summarizes the code. The adopted text on Municode governs.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
TempeNo work of any kind in a public right-of-way without a permit or license from the City Engineer, and the permittee gives 24 hours' notice before starting. Fees are set by Council resolution.Tempe City Code 29-19
Verified October 4, 2026
Paradise ValleyA permit from the Town for any work on, over or under a public road, street or alley. Each permit is limited to one site and one duration and becomes void if work does not start within 90 days. Finished work must be called in for inspection within 24 hours.Paradise Valley Town Code 5-10-1
Verified October 4, 2026

This page explains the rule. The official text at the source above governs.

Sources

Permits and Inspections in Other Cities

More Scottsdale Codes and Permits

Related Rules and Questions

Questions About Scottsdale Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.