Tempe Permit Fee

Tempe water tap and development fees by meter size for commercial service

Verified September 29, 2026
In Short

Tempe charges a water development fee that rises with meter size, from $1,648 for a 5/8 inch meter to $469,680 for a 10 inch turbine meter. The sewer development fee is $0 for every meter size in the schedule read today. Tap and meter fees are separate, and meters of 3 inches and up are cost-based with a deposit.

Official Source
Tempe City Code Appendix A: Schedule of Fees, Water and Sewers (Municode)
Tempe City Code Appendix A, 33-56, 33-93 and 27-213
“5/8 $1,648.00”
Applies to:
Developers, owners, designers and contractors sizing a new water service for a Tempe commercial or multi-use property
Official fee:
Official City of Tempe fees, listed below. These are city charges, not contractor prices.
In force:
Tempe City Code Appendix A, 33-56 (last amended Res. R2025.89, 2025-07-01), 33-93 (Res. R2020.21) and 27-213 (Res. R2025.44, 2025-04-10), since July 1, 2025
Last verified:
September 29, 2026, against the official page

Meter size is the number that moves a new commercial water bill. Tempe's water development fee roughly doubles each time you step up a meter size, and a bigger meter also changes the backflow assembly you have to buy and test. The sewer development fee is the odd one out.

What does Tempe's fee schedule say?

Three parts of Appendix A matter for a new service.

Tap and meter fees (33-56). These pay for tapping the main and installing the connection, meter and meter box. Tempe's table:

Meter sizeTapMeterTotal
5/8 inch$638.00$46.50$684.50
3/4 inch$657.00$63.50$720.50
1 inch$748.00$116.00$864.00
1.5 inch$1,270.00$206.50$1,476.50
2 inch$1,667.00$269.00$1,936.00
3 inch and 4 inchCost: $8,250.00 deposit required
6 inchCost: $8,250.00 deposit required
8 inchCost: $9,350.00 deposit required

Water development fee (33-93). One fee for all user classes, residential, commercial and industrial, by meter size. The schedule reads: 5/8 inch $1,648; 3/4 inch $2,472; 1 inch $4,120; 1.5 inch $8,240; 2 inch $13,184; 2 inch turbine $23,072; 3 inch compound $32,960; 3 inch turbine $41,200; 4 inch compound $65,920; 4 inch turbine $82,400; 6 inch compound $131,840; 6 inch turbine $164,800; 8 inch turbine $313,120; 10 inch turbine $469,680. T means turbine and C means compound.

Sewer development fee (27-213). The table lists a capacity ratio for each meter size, then shows $0 for water, $0 for wastewater and $0 proposed fee at every size, from 5/8 inch to 10 inch. It was last updated by Resolution R2025.44 on April 10, 2025.

What do the key terms mean?

  • Tap: the physical connection to the city main.
  • Development fee: a one-time charge for the system capacity your service takes. It is not a permit fee.
  • Turbine and compound meters: two meter designs. The fee schedule prices them separately above 2 inches.
  • Deposit required: for 3 inch and larger taps the city collects a deposit against actual cost instead of a fixed price.

Who does this cover?

It covers anyone getting a new or larger water connection in Tempe, residential or commercial. It does not cover a service that keeps its existing meter, which is why swapping a like-for-like meter or fixtures inside the building does not trigger these fees. Whether a tenant improvement that upsizes a meter triggers a new development fee is not spelled out in the fee table.

Quick check: what does a meter size change?

MeterDevelopment feeTap and meter feeNote
5/8 inch$1,648$684.50Smallest size
1 inch$4,120$864.00Common small commercial
2 inch$13,184$1,936.00Turbine 2 inch is $23,072
3 inch compound$32,960Deposit requiredCost-based tap
6 inch compound$131,840Deposit requiredCost-based tap
Any sizeSewer development fee $0n/a27-213

What does this look like in real life?

A small office fit-out. A 1 inch service carries a $4,120 water development fee and $864 in tap and meter fees. The sewer development fee is $0.

A restaurant with a big kitchen. Moving to a 2 inch service raises the water development fee to $13,184. If the design calls for a turbine meter, the schedule prices it at $23,072.

The edge case: the same job in Chandler. A 2 inch service in Chandler pays $19,680 for water, $47,912 for wastewater and $8,752 for reclaimed water, so Chandler's three fees total $76,344 to Tempe's $13,184 plus $0. Chandler's water fee alone is $6,496 higher than Tempe's, and the sewer and reclaimed fees add the rest. Chandler's table waives the reclaimed and wastewater fees only for water-only landscape connections.

What should you do next?

  1. 1Decide the meter size with your designer. It sets the water development fee and the backflow assembly size.
  2. 2Ask Tempe Water Utilities to confirm the current tap, meter and development fees for your size before you budget. The designer or contractor submits the water service with the building permit through Tempe Building Safety, and 480-350-8341 is the permit number the city's Backflow FAQ lists.
  3. 3Include the backflow assembly on the plans. The assembly must be at least the same cross-sectional area as the service.
  4. 4For 3 inch and larger taps, expect a cost-based charge with a deposit.
  5. 5Pay the fees under the permit process for the building.

What do people get wrong?

  • "Sewer capacity costs extra everywhere." Tempe's sewer development fee reads $0 at every meter size.
  • "The tap fee is the whole fee." The development fee is separate and much larger.
  • "Fees are fixed." Appendix A is amended by council resolution; the water development table was last amended in 2020 and the tap table in 2025.
  • "A bigger meter is free insurance." The fee and the backflow assembly both scale with it.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
ChandlerNon-residential utility fees are set by meter size. A 2 inch disc or turbine meter pays $19,680 for water, $47,912 for wastewater and $8,752 for reclaimed water, where Tempe's 2 inch meter is $13,184 for water and $0 for sewer.Chandler City Code Ch. 38, Appendix A, Table A
Verified September 29, 2026
GlendaleThe impact fee schedule prices water and wastewater per meter in one part of the city ($37,973 total for a 2 inch meter) and shows $0 for all meter sizes in the other.Glendale Development Impact Fee Schedule (revised 2026-06-24)
Verified September 29, 2026

This page explains the rule. The official text at the source above governs.

Sources

Water Supply and Pipes in Other Cities

More Tempe Codes and Permits

Related Rules and Questions

Questions About Tempe Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.