Published charges cover different services. Phoenix lists $95 for a city-built sewer tap, Tempe $1,800 for a six-inch street tap with pavement, and Chandler $1,819 for a 3/4-inch service line and meter box. Mesa lists a separate $9,528 combined capacity fee for a new 3/4-inch meter. Obtain an itemized utility quote; these are not total project prices.
“Applications for sewer taps to be constructed by the Department will include a fee of $95.00 for each sewer tap.”
- Applies to:
- Commercial owners, builders, developers and plumbing contractors connecting a building to a public water or sewer main
- Official fee:
- Phoenix sewer tap $95, dye test $50 (City Code Ch. 28, Art. IV). Tempe sewer tap $1,100 alley or $1,800 local street with pavement, machine tap $110 (Appendix A 27-173, Res. R2015.123); water tap and meter 3/4 inch $720.50 (33-56). Scottsdale 3/4 inch meter $370, meter and service line $2,730 (49-21). Chandler 3/4 inch service line and meter box $1,819 inside city (50-9.1). Mesa 3/4 inch capacity fee $9,528 (8-10-13 Table 1, Ord. 5970, 12-1-25). Avondale sewer tap $85, water service tap $80 in the published FY2026 fee schedule, effective 9/1/2025; confirm the currently applicable schedule.
- In force:
- Fee amounts as published in each city's code or fee schedule on the verified date; dates given per fee
- Last verified:
- October 4, 2026, against the official page
What Does Each Valley City Require?
| Where | What applies | Source |
|---|---|---|
| Phoenix | No one may connect to a public sewer without a Water Services permit, and a sewer tap needs a valid plumbing permit first. The city charges $95 for each sewer tap its crew builds and $50 for a dye test, refunded if the tap is not in service. New water taps must be at least 1 inch. | Phoenix City Code Ch. 28, Art. IV; TRT/DOC/00142 Verified October 4, 2026 |
| Tempe | City sewer taps: $1,100 for a six-inch alley tap and $1,800 for a local or collector street, both including pavement replacement, actual cost on arterials, $110 for a machine tap only. Self-made taps pay a $15 inspection fee. A 3/4-inch water tap and meter is $720.50. | Tempe City Code Appendix A, 27-173, 27-174 and 33-56 Verified October 4, 2026 |
| Scottsdale | The city taps the main and installs the service line and meter box and bills the owner or contractor, or a state-licensed contractor does it to city standards and buys the meter. For 3/4 inch: meter $370, service line $2,410, both $2,730. Three inches and up are cost recovery. | Scottsdale Revised Code 49-21(a) Verified October 4, 2026 |
| Chandler | The city installs the service line and meter box for $1,819 at 3/4 inch inside the city, plus its cost for concrete and asphalt repair in the right-of-way. If the developer installs the service line, the meter alone is $419. Tapping the public sewer needs a written City Engineer permit. | Chandler City Code 50-9 and 51-7 Verified October 4, 2026 |
| Mesa | A new or larger water meter pays the water and wastewater capacity fee before the city installs it: $9,528 at 3/4 inch, $15,880 at 1 inch and $50,814 at 2 inches. | Mesa City Code 8-10-13, Table 1 Verified October 4, 2026 |
| Gilbert | It is unlawful to tap or connect any service, drain or other pipe to the town sewer without a town permit. | Gilbert Town Code 10-311 Verified October 4, 2026 |
| Glendale | A building sewer connection needs a valid city plumbing permit first. Right-of-way work takes separate permits and a specially licensed contractor; the city's June 25, 2026 ADU worksheet gives example estimates of $443.60 for a right-of-way permit and $126.73 for a 3/4-inch meter set. Confirm actual charges for the project. | Glendale City Code 33-126; ADU fee estimate sheet (rev. 06-25-2026) Verified October 4, 2026 |
| Avondale | Connecting to a public sewer needs a written permit from the city manager. The engineering fee schedule lists $85 per sewer tap and $80 per water service tap. | Avondale City Code 24-86; FY2026 Rates and Fee Schedule Verified October 4, 2026 |
| El Mirage | The developer or property owner, with city approval, taps the water main and installs the service line, valves and meter box or vault, then pays the other city fees before the city sets the meter. | El Mirage City Code 50.066(B) Verified October 4, 2026 |
A tap is the connection between a public main and your building's own service line or sewer. It sits in the street or an easement, so it's city work or city-inspected work, and the applicable utility sets approval and fee requirements. The fees below are the official amounts in each city's code or fee schedule, with the date or table that sets them. They describe different charges: taps, meters, service lines and Mesa's separate capacity fee. Do not compare them as equal project totals. Plan review, impact fees, restoration and contractor costs may also apply; ask the utility for a current itemized quote.
What does Phoenix's code say about sewer taps?
Phoenix's Chapter 28, Article IV starts with a flat rule: no one may "uncover, make any connections with or opening into" a public sewer without a Water Services permit. A sewer tap application needs "a valid plumbing permit issued by the Planning and Development Director" first. Then the fee: "Applications for sewer taps to be constructed by the Department will include a fee of $95.00 for each sewer tap."
Two other Phoenix details matter on a new building:
- Dye test: a $50 fee, refunded if the test shows the tap isn't in service.
- Water tap size: Phoenix's meter sizing guideline says all new service taps "shall be a minimum of 1-inch in size," even for single-family lots.
What do the key terms mean?
- Tap. The fitting that cuts into the main, water or sewer. A "machine tap" (Tempe) is the tap alone, without the excavation and pavement.
- Service line. The pipe from the main to the property line or meter. Scottsdale and Chandler price it separately from the meter.
- Meter set fee. What the city charges to set its meter once the tap and box are in.
- Capacity or impact fee. A one-time charge by meter size for system capacity. Mesa calls it a capacity fee and charges it before installing the meter.
- Dye test. Dye flushed down a fixture to prove which sewer tap a building drains to.
Who does this cover?
Anyone connecting a building to a public main: a new commercial pad, an ADU with its own meter, a restaurant upsizing its water service, or an owner abandoning a septic system for city sewer. It also covers the contractor making the tap, since several cities let a licensed contractor do the work under a permit and inspection.
Quick check: who taps the main, and what does the city charge?
| City | Who makes the tap | Official fee (3/4-inch water, or per sewer tap) |
|---|---|---|
| Phoenix | City crew for sewer taps it builds | $95 sewer tap fee, $50 dye test fee |
| Tempe | City, or owner with inspection | $1,800 fee for a street sewer tap with pavement; $15 inspection for self-made taps; $720.50 water tap and meter |
| Scottsdale | City, or a licensed contractor to city standards | $370 meter fee; $2,730 for meter and service line |
| Chandler | City, or developer installs service line | $1,819 fee city-installed; $419 meter only |
| Mesa | City sets all meters | $9,528 capacity fee before the meter |
| Avondale | Permit from the city manager | $85 sewer tap, $80 water service tap |
| El Mirage | Developer or owner, city approval | City fees due before the meter |
| Gilbert, Glendale | Permit first | See the city for current fees |
What does this look like in real life?
A Tempe restaurant pad on a local street. A new six-inch sewer tap built by the city carries an $1,800 fee including pavement replacement. On an arterial the charge is actual cost, and taps outside the city run one and a half times the table.
A Scottsdale office adding a 2-inch meter. The city can tap the main and install the service line and meter for a $4,790 fee, or a state-licensed contractor installs the line to city standards and the city sells the meter for $930.
A Chandler developer running its own service lines. Because the developer installs the line and box, the city charges only the meter fee: $419 at 3/4 inch inside the city and $587 outside it.
A Mesa owner upsizing from 1 inch to 2 inches. The capacity fee is charged on the increase from the original meter size to the larger one, per 8-10-13.
What should you do next?
- 1Size the meter first. It drives the tap fee and any capacity or impact fee. Phoenix won't go below 1 inch on new taps.
- 2Pull the plumbing permit for the building side. Phoenix and Glendale require it before the sewer connection.
- 3Ask the city who makes the tap. Some tap themselves, some let a licensed contractor do it under inspection.
- 4Add the right-of-way permit if the tap is in the street, plus pavement restoration (see the pavement cut table).
- 5Pay capacity or impact fees before the meter is set; Mesa and El Mirage both require payment first.
- 6Schedule inspection of the tap and service before backfill.
What do people get wrong?
- "The listed fee is the whole bill." Mesa's capacity fee alone is $9,528 at 3/4 inch, far more than any tap fee here.
- "Fees are the same everywhere." A 3/4-inch city-installed service is $2,730 in Scottsdale and $1,819 in Chandler.
- "Anyone can tap the main." Every city here requires a permit, and several reserve the tap for their own crew.
- "The city pays for the street." Chandler adds its concrete and asphalt repair cost to the meter fee.
When your building's tap, service line or lateral needs work, HQ can inspect and repair building water and sewer lines. Review the utility boundary, permits and approved contractor requirements before scheduling work at a public main.
This page explains the rule. The official text at the source above governs.
Permits and Inspections in Other Cities
- ChandlerChandler City Code 29-1.3: violations, penalties and stop work orders
- ChandlerWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- ChandlerChandler plumbing and gas work that needs no permit (City Code 29-6.7)
- ChandlerWhich plumbing and gas codes does Chandler enforce?
- ChandlerChandler plumbing inspections: the required list and inspection codes
- ChandlerDo you need a permit to repipe a house in Chandler?
More Valley-Wide Codes and Permits
- Permits and InspectionsPavement Cut and Street Restoration Rules by Valley City
- Permits and InspectionsRight-of-Way Permits for Plumbing Work by Valley City
- Permits and InspectionsUtility Easements: What You Can Build, Fence or Plant, by City
- Commercial PlumbingWhich Businesses Need a Backflow Assembly in Each Valley City
- Gas LinesGas Line Permits in Each Valley City
- Gas LinesGas Line Burial Depth Rules in Each Valley City
Related Rules and Questions
- Valley-WideWater and Sewer Main Extensions: Who Pays and Who Builds, by City
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- FAQHow much is the sewer connection fee for a new home in Phoenix?
- FAQDo I need a permit to dig in the street right-of-way to fix my sewer or water line in Phoenix?
- Sewer Repair & Installation