Yes. Scottsdale requires a permit for each backflow assembly, including a replacement, and the installation must be finished within 45 days. The assembly goes in an accessible spot as close as possible to the service connection. New projects must show it on plans and pass a certified test before a temporary certificate of occupancy.
“Backflow prevention assemblies shall be installed at the customer supply line connection by the user, by obtaining a permit for the appropriate backflow prevention assembly and completing the installation within 45 days.”
- Applies to:
- Owners, designers and plumbing contractors installing or replacing a backflow assembly in Scottsdale, including new commercial construction
- Official fee:
- The permit fee is on the city's Planning and Development fee schedule; Sec. 49-69 lets Council set a fee to recover the cross-connection program cost
- In force:
- Scottsdale Revised Code Sec. 49-63 and 49-68 (Res. No. 13395, 2025-05-20)
- Last verified:
- October 4, 2026, against the official page
Scottsdale requires a separate permit even for a like-for-like replacement of a required backflow assembly. The code also sets a 45 day install window and ties the final test to the certificate of occupancy.
What do Secs. 49-63 and 49-68 say?
Section 49-63(a) puts installation on the user, at the user's expense, to the standards and specifications the division adopts. The user gets a permit for the assembly and finishes the installation within 45 days. The assembly must be at least as large in diameter as the service connection.
Section 49-63(b) says the assembly goes in an accessible location as close as possible to the service connection, with proper clearances above ground as shown in the division's current standard details. Subsection (c) covers a user who needs a continuous water supply: two or more assemblies go in parallel, so one can be tested while the other carries water, and their combined cross-sectional area must at least equal the customer supply line.
Section 49-68 covers plans and permits:
- Plans (a): every assembly that will be installed is shown and specified on all required building and engineering plans. The city must approve the intended installation before it issues any building or encroachment permit.
- One permit per assembly (b): installation permits are required before installation, and a separate permit is needed for each required assembly, including a replacement.
- Certified test before TCO (c): assemblies must meet the division's current standard details, be tested by a certified tester and shown to be operating correctly before the city issues a temporary certificate of occupancy.
- Permit revocation (d): the division may suspend or revoke a permit in writing if it was issued in error or on incorrect information.
What do the key terms mean?
- Customer supply line: the water line between the city meter and the property's plumbing. The assembly protects the city side from what happens beyond it.
- Encroachment permit: the city's permit for work in the public right-of-way. Section 49-68(a) requires backflow approval before it is issued too.
- Temporary certificate of occupancy (TCO): the city's permission to occupy before every item is final. A backflow assembly that has not passed its test can hold it up.
Who does this cover?
Anyone installing or replacing a required assembly: owners, general contractors and the certified contractor doing the work. It covers new construction and retrofits. The city's commercial services page says any contractor working on an assembly must be a certified backflow tester, and the same page says every new meter requires a backflow device that the city inspects and approves before the meter is delivered.
Quick check: what does your job need?
| Job | Permit | Other requirement |
|---|---|---|
| New commercial building | Permit for each assembly | Assembly shown on plans and approved before the building permit |
| Replacing a failed assembly | Separate permit for the replacement | Finish within 45 days |
| Adding a second parallel assembly | Permit for each one | Combined area at least equal to the supply line |
| Assembly ready before opening | Permit and inspection | Certified test passed before TCO |
What does this look like in real life?
A new restaurant. The designer shows the RP on the plumbing plans, the city approves the sheet before the building permit, and the certified contractor pulls an assembly permit. The test report is ready before the TCO inspection.
A two-assembly hospital wing. The hospital cannot lose water during testing, so it installs two assemblies in parallel. Each needs its own permit, and the pair's combined area must match the supply line.
The edge case: the 45 days run out. The code sets the install window but does not say what happens on day 46. The non-compliance rules in Sec. 49-62(c) and 49-66 apply instead, and they are laid out on our surcharge page.
What should you do next?
- 1Confirm the required assembly type and size from our premises list page or the city's notice.
- 2Hire a certified backflow tester who can install it. The city's list is on its commercial services page.
- 3Get the assembly on your plans, or file the permit in the city's online permitting system if this is a retrofit.
- 4Ask the city which date starts the 45-day installation window on your permit or notice. Section 49-63 names the interval without expressly stating its starting date; do not substitute the separate Sec. 49-62 notice deadline.
- 5Get a certified test done and send the report to the city within 7 days, as the testing page explains.
What do people get wrong?
- "A replacement is maintenance, so no permit." Section 49-68(b) says a separate permit for each assembly, including replacement.
- "The plumber will figure out the permit later." Plans must show the assembly before the city issues the building permit.
- "The certificate of occupancy comes first." The test comes first. The code says the assembly must be tested and working before a TCO.
This page summarizes the code. The adopted text on Municode governs.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Mesa | The customer installs the assembly at its own cost, at the point of delivery and before the first branch line that splits the customer water system. It must be at least as large as the service connection unless the department approves otherwise in writing. | Mesa City Code 8-1-5 Verified September 29, 2026 |
| Glendale | The customer installs at its own expense at the service connection. Reduced pressure and pressure vacuum breaker devices go above ground. Bypassing or removing a device without approval is a misdemeanor. | Glendale City Code 33-91 Verified September 29, 2026 |
This page explains the rule. The official text at the source above governs.
Backflow Prevention in Other Cities
- GlendaleGlendale City Code 33-99: backflow devices must be on your building plans
- PhoenixDo you need a permit to install or replace a backflow preventer in Phoenix?
- ChandlerChandler backflow testing: annual test, notices and water shutoff
- ChandlerChandler City Code 52-36: backflow assemblies on commercial building plans
- GilbertGilbert Town Code 10-92(c): which backflow assembly does your kind of property need?
- GlendaleGlendale City Code 33-90: which businesses need a backflow device
More Scottsdale Codes and Permits
- Backflow PreventionHow often must a Scottsdale backflow assembly be tested, and by whom?
- Backflow PreventionWhich backflow assembly types does Scottsdale recognize, and how does it rate hazards?
- Backflow PreventionWhen does a Scottsdale fire sprinkler system need a double check assembly?
- Backflow PreventionWhat happens if you miss a Scottsdale backflow deadline?
- Backflow PreventionCan Scottsdale shut off your water for a backflow violation?
- Backflow PreventionWhich Scottsdale businesses and buildings need a backflow assembly?