Phoenix uses IPC Table 704.1: 1/4 inch per foot for drains 2 1/2 inches and smaller, 1/8 inch for 3 to 6 inches, 1/16 inch for 8 inches and larger, and 1/4 inch upstream of a grease interceptor. Its amendment lets a building sewer run flatter only with an engineer's design, a notarized owner agreement and a certificate.
“The minimum slope permitted shall be calculated from Manning's Formula using a coefficient roughness of 0.013 and a sewage velocity of 2 feet per second.”
- Applies to:
- Homeowners, builders, engineers and plumbing contractors laying or replacing drain and building sewer pipe in the City of Phoenix, especially a long or shallow run to the city sewer
- Official fee:
- not a separate fee; a new or replacement building sewer is plumbing work that takes a Phoenix plumbing permit and inspection, and the low slope certificate is filed with the code official
- In force:
- 2024 IPC as amended by Phoenix (Ord. G-7397, eff. 2025-08-01), since August 1, 2025
- Last verified:
- November 16, 2026, against the official page
In Phoenix a 4 inch building sewer needs at least 1/8 inch of fall per foot, and a small drain of 2 1/2 inches or less needs 1/4 inch. Pipe of 8 inches and larger can run at 1/16 inch. Any drain that runs to a grease interceptor needs 1/4 inch whatever its size. Phoenix adds one way out for a building sewer that cannot reach the city main at those slopes: a flatter grade worked out by an engineer, accepted by the owner under notary, and backed by a certificate filed with the city.
What does the Phoenix code say?
Section 704.1 of the 2024 International Plumbing Code says horizontal drainage piping "shall be installed in uniform alignment at uniform slopes," no flatter than Table 704.1, and that piping upstream of a grease interceptor slopes at least 1/4 inch per foot (2 percent). The table is short:
| Pipe size | Minimum slope |
|---|---|
| 2 1/2 inches or less | 1/4 inch per foot |
| 3 to 6 inches | 1/8 inch per foot |
| 8 inches or larger | 1/16 inch per foot |
Phoenix's change, underlined in the city's amendment, is an exception. The Authority Having Jurisdiction may approve a lesser slope for a building sewer "in lieu of a sewage ejector or pumping station" when a registered engineer or architect certifies the building sewer design and its installation, and when the building owner agrees in writing under notary to accept the lesser slope. "The minimum slope permitted shall be calculated from Manning's Formula using a coefficient roughness of 0.013 and a sewage velocity of 2 feet per second." A low slope sewer certificate of compliance then goes to the code official.
That formula comes from the state rule for public sewers. Arizona's 4.01 General Permit, A.A.C. R18-9-E301(D)(2)(e), tells designers to give sewer lines at least the slope Manning's Formula gives at a roughness of 0.013 and 2 feet per second flowing full. Phoenix's justification says the amendment adds a lesser slope option based on engineering calculations and cuts the cost of the old approval process. Ordinance G-7397 put it in force on August 1, 2025.
How flat can a Phoenix building sewer go?
The city prints the floor for each size. The inch per foot column is our conversion of the city's percentages, rounded.
| Pipe size | Table 704.1 minimum | Low slope floor (city chart) | About |
|---|---|---|---|
| 4 inch | 1/8 inch per foot | 0.85 percent | 0.10 inch per foot |
| 6 inch | 1/8 inch per foot | 0.50 percent | 0.06 inch per foot |
| 8 inch | 1/16 inch per foot | 0.33 percent | 0.04 inch per foot |
| 10 inch | 1/16 inch per foot | 0.25 percent | 0.03 inch per foot |
| 12 inch | 1/16 inch per foot | 0.20 percent | 0.02 inch per foot |
The chart gives each size a velocity near 2 feet per second when full. A 4 inch line at 0.85 percent carries about 79 gallons a minute full; a 6 inch line at 0.50 percent about 178.
What do the key terms mean?
- Building sewer: the pipe from the outside of the building to the public sewer or a private system. The exception covers this pipe only, not drains inside the building.
- Manning's Formula: the standard equation for flow in a pipe that is not under pressure. The 0.013 is the roughness value; 2 feet per second is the speed that keeps solids moving.
- Sewage ejector: a pump that lifts sewage to a higher sewer when gravity cannot get it there. The exception is the alternative to one.
Who does this cover?
Owners and contractors in Phoenix laying a new or replacement building sewer, most often a long run from a home or building set well back from the street, a shallow city main, or a lot that is nearly flat. Commercial kitchens are covered in a different way: the drain to a grease interceptor keeps its 1/4 inch per foot, and the low slope route applies to the building sewer, not to that piping.
What does this look like in real life?
- A 100 foot, 4 inch sewer on a flat lot. At 1/8 inch per foot the pipe drops about 12.5 inches over the run. At the 0.85 percent floor it drops about 10.2 inches. That 2 inches can decide whether the line reaches the tap by gravity or needs a pump. The figures are our arithmetic, not city text.
- A restaurant kitchen line to the interceptor. It stays at 1/4 inch per foot. Flatter pipe lets grease settle before it reaches the interceptor, and the low slope route does not cover it.
- The same design in Surprise or Cave Creek. Neither writes a low slope route into its plumbing amendments, so the table minimum is the number there.
What should you do next?
- 1Measure the fall from the building's cleanout to the city tap before anyone digs. A sewer camera with a locator can show the depth at both ends.
- 2Size the pipe and check the table slope over the full length.
- 3If the table slope cannot reach the tap, compare a pump against the low slope route with a registered engineer or architect.
- 4For the low slope route, get the engineer's certified design, the owner's notarized acceptance and the low slope sewer certificate of compliance to the code official.
- 5Pull the plumbing permit and the city's sewer connection permit, and keep the trench open for inspection.
HQ Plumbing & Air runs a camera down the line and marks where a problem sits before a sewer repair is planned. For a kitchen line, see our grease trap service.
Common questions about sewer slope in Phoenix
How much fall does a sewer line need? It depends on the pipe size. The usual 4 inch house sewer needs 1/8 inch per foot under Table 704.1, about 1 percent. A 2 inch or 2 1/2 inch drain needs 1/4 inch per foot.
What is the minimum running slope on a 10 inch sanitary sewer? Under Table 704.1, 1/16 inch per foot, about 0.52 percent. Under the Phoenix low slope route, the city's chart puts the floor at 0.25 percent for a 10 inch building sewer, with the engineer, the notarized owner agreement and the certificate.
Does Phoenix have a public sewer system? Yes. The City of Phoenix runs the public sewer, and connecting a building sewer to it takes a city permit under City Code 28-27. Who owns which part of the line is set by City Code 28-5; see who owns a Phoenix sewer line.
What do people get wrong?
- "1/4 inch per foot is the rule for every sewer." In Phoenix that is the rule for small drains and for piping to a grease interceptor. A 4 inch building sewer needs 1/8 inch.
- "A plumber can lay it flatter if it still drains." Only through the exception, with an engineer or architect certifying the design and the installation and the owner agreeing under notary.
- "Steeper is always better." The code sets minimums. A sudden steep drop followed by a flat section is the uneven grade the code's "uniform slopes" wording rules out, and a belly in the line holds water and waste.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Surprise | Surprise's 2024 IPC local amendments change sections 202, 410.2, 410.4, 605.25, 1003.2 and 1106.1 but not 704.1, so Table 704.1 applies as the model code prints it. Its amendments write in no low slope route for a building sewer. | City of Surprise 2024 International Plumbing Code Local Amendments Verified November 16, 2026 |
| Cave Creek | Cave Creek's 2026 plumbing amendments change 305.4.1 (sewer depth) and 701.2 (connection to sewer) and leave 704.1 alone. The Town's under slab checklist asks for 1/4 inch per foot on pipe 2 inches and smaller and 1/8 inch on 3 to 6 inches, with 12 inches of cover. | Cave Creek Town Code 151.04 (Ordinance 2025-08), Section 4 Verified November 16, 2026 |
This page explains the rule. The official text at the source above governs.
Need this done to Phoenix code?
We pull the permit when the job needs one and do the work to the code on this page. For restaurants, offices and rental properties, we schedule it around your hours.
- 24/7 emergency service
- Licensed and insured
- Upfront pricing
- Free estimates
Sewer Lines in Other Cities
- Cave CreekHow deep must a sewer line be buried in Cave Creek?
- MesaHow deep must a building sewer be in Mesa? Plumbing Code 305.4.1
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
- ChandlerChandler sewer line responsibility: who repairs the pipe to the main
- ChandlerChandler sewer tap permit: what 51-7 and the street permit require
- Fountain HillsWhen does Fountain Hills require a sewer easement encroachment permit?
More Phoenix Codes and Permits
- Sewer LinesWho pays to extend a sewer main in Phoenix?
- Sewer LinesDo you need a permit to connect to or work on a public sewer in Phoenix?
- Sewer LinesWho is responsible for a broken sewer line in Phoenix?
- Sewer LinesDo you need a separate permit for a water or sewer tap in Phoenix?
- Permits and InspectionsWhich building and plumbing codes does Phoenix enforce?
- Commercial PlumbingCan a Phoenix business get an annual permit for plumbing alterations?
Related Rules and Questions
- PhoenixPBCC 110.3.10.1: Which plumbing inspections does Phoenix require?
- PhoenixPhoenix City Code 28-12: Which businesses must install a grease or oil interceptor?
- FAQWhat slope does a drain pipe need by code?
- FAQCan a sewer camera inspection accurately measure pipe slope?
- FAQWhat does a belly in a sewer line mean?
- Sewer Repair & Installation
- Grease Trap & Interceptor Service