A private lift station on a sewer with manholes or over 3,000 gallons a day needs ADEQ's Type 4.01 permit, two pumps and level alarms. Cities add their own layer: Phoenix allows private stations under 1 million gallons a day, Gilbert wants yearly O&M records, and Scottsdale, Peoria and Glendale expect city involvement from the start.
“The permit is required for almost any expansion of the sewage collection system. This permit is valid for the life of the facility.”
- Applies to:
- Owners, developers and engineers of commercial and multi-family sites that pump sewage; property managers running an existing station
- In force:
- A.A.C. R18-9-E301 (amended 2005) and each city's current water and wastewater design standards
- Last verified:
- September 29, 2026, against the official page
What Does Each Valley City Require?
| Where | What applies | Source |
|---|---|---|
| Phoenix | A development that can't reach gravity sewer may use a private lift station under 1 million gallons per day, and everything upstream of the public connection stays privately owned and maintained. The city recommends building private stations to its lift station manual. | Phoenix Design Standards Manual for Water and Wastewater Systems (2021), D.2.e; Lift Station Design Guidance Manual (2012), 1.1 Verified September 29, 2026 |
| Scottsdale | Lift stations are normally city-owned on land deeded to the city, and a private development that needs one starts with a pre-design meeting with Water Resources. The criteria (two pumps, standby generator with 12 hours of fuel) are recommended for private stations. Ejector systems belong to the property owner. | Scottsdale Design Standards and Policies Manual 7-1.300 and 7-1.410; Sewer Lift Station Design Criteria Verified September 29, 2026 |
| Mesa | Lift stations only where approved, built to Arizona Administrative Code Title 18, Chapter 9 and, if private, the adopted plumbing code. Private stations can't sit in public right-of-way or public easements. | Mesa Engineering and Design Standards 2025, Sec. 433.13 and 433.14 Verified September 29, 2026 |
| Gilbert | Lift stations are kept to a minimum, private ones stay out of public right-of-way and easements, and private stations send annual operation and maintenance records to the town. The standards list dual pumps, backup power, telemetry and alarms. | Gilbert Public Works and Engineering Standards 2026, Sec. 8.8.3.14 Verified September 29, 2026 |
| Chandler | Pump stations aren't allowed without the City Engineer's approval, and wet wells need approved coatings. Private sewer lines can't run in right-of-way or public utility easements. | Chandler Engineering and Design Standards Manual (January 2025), Ch. 2 Verified September 29, 2026 |
| Peoria | Lift stations and force mains are typically built by the city through its capital program; developers who need one must first request a meeting with Water Services. | Peoria Engineering Standards (2025 Update), Sec. 9.7.1 Verified September 29, 2026 |
| Avondale | Private lift stations can't sit in public right-of-way or easements. At a minimum, telemetry, dual pumps, backup power, three-phase power, odor control and perimeter walls are required, with design flow met with the largest pump out. | Avondale General Engineering Requirements Manual, Sec. 5.7.2(N) Verified September 29, 2026 |
| Glendale | Public sewage lift stations are discouraged and allowed only in unusual circumstances with approval of the City Engineer and Water Services. The 2015 standards don't set separate rules for private stations. | Glendale 2015 Engineering Design and Construction Standards, Sec. 7.1 E Verified September 29, 2026 |
When a site sits lower than the sewer, sewage has to be pumped uphill. The state decides whether that pump setup is a regulated sewage collection system, and each city decides whether it wants to own the station, approve it, or keep it off public land. A single-building ejector and a multi-building lift station land in different rulebooks, and that's where most confusion starts.
What does the state rule say?
Arizona's Type 4.01 General Permit, A.A.C. R18-9-E301, has three triggers, and any one is enough: a system that serves "downstream from the point where the daily design flow is 3000 gallons per day," "A sewage collection system that includes a manhole," or one "that includes a force main or lift station serving more than one dwelling." The last one says dwelling, so a commercial station is usually caught by the first two: the private sewer feeding it has manholes, or the flow passes 3,000 gallons a day. Construction waits for a Construction Authorization, and the station can't discharge until ADEQ issues a written Discharge Authorization (R18-9-A301).
The lift station rules set a floor every Valley city builds on:
- Two pumps. "Equip a lift station wet well with at least two pumps," with design flow met "with any one pump out of service."
- Alarms. High or low wet well levels trigger an alarm "at the wet well site and at the system control center."
- Standby power over 10,000 gallons per day. Plus redundant level controls.
- Odor and retention. No more than 30 minutes of retention in the wet well unless the sewage is aerated, chemically treated or ventilated.
- Floods and security. Nothing in a floodway, protection from the 100-year flood, and a sign with the owner's 24-hour emergency number.
What do the key terms mean?
- Lift station. A wet well and pumps that push sewage through a force main to a higher gravity sewer.
- Sewage ejector. A smaller pump system inside or beside one building, usually for a below-grade restroom or floor. It's building plumbing under the city's plumbing code.
- Force main. The pressurized pipe from the pumps.
- Duty and standby pumps. One pump runs; the other waits to take over. Scottsdale writes it as "one (1) duty + one (1) standby."
- Telemetry or SCADA. Remote alarms that call someone when a pump fails or the wet well rises.
- Public right-of-way and easements. City land and utility strips. Mesa, Gilbert, Avondale and Chandler keep private sewer facilities out of them.
Who do these rules cover?
Developers, owners and HOAs with a private lift station on a sewer system that has manholes or passes 3,000 gallons a day: business parks, shopping centers, apartment complexes and campuses. Property managers running an existing station inherit the O&M manual, the alarms and, in Gilbert, the yearly records.
This usually does not cover a single building's ejector pump. There, the city's adopted plumbing code controls. The state's single-building exception is written for gravity lines, though, so a large building pumping past the 3,000 gallon point should check with ADEQ. Scottsdale's manual adds that ejector systems "are to be owned, operated and maintained by the property owner."
Quick check: which rules apply to your pump?
| Setup | Rules that apply | Why |
|---|---|---|
| Ejector pump for one restaurant's below-grade restroom | City plumbing code | Small single-building plumbing, well under 3,000 gallons a day |
| Duplex lift station for a four-building business park | ADEQ 4.01 plus city standards | Private sewer with manholes, flow usually past 3,000 gallons a day |
| Private station in Phoenix under 1 million gallons per day | Allowed; stays private upstream of the public connection | Phoenix Design Standards D.2.e |
| Private station proposed in a public utility easement in Mesa | Not permitted | Mesa Sec. 433.14 |
| Private station in Gilbert | Allowed but minimized; annual O&M records to the town | Gilbert Sec. 8.8.3.14 |
| New development in Peoria or Scottsdale that needs a station | Meet the city's water department before design | City typically builds or owns stations |
| Station averaging over 10,000 gallons per day | Standby power and redundant level controls | R18-9-E301(D)(5)(f) |
What does this look like in real life?
A Mesa flex park below the sewer. The engineer designs a private duplex station on the owner's parcel, outside any public easement. It's built to the state rule and the adopted plumbing code, and the owner keeps the alarm contact and O&M manual current.
A Scottsdale mixed-use project. The team's first step is a pre-design meeting with Water Resources. If the city will own the station, it sits on a tract deeded to the city; if it stays private, the city recommends the same design criteria in case it's ever asked to take it over.
A Gilbert shopping center's station fails an alarm test. The town expects the yearly O&M records, so the missed check shows up on paper.
A restaurant adds a basement prep area. The answer flips: a small ejector for one building isn't a 4.01 collection system. It goes through the city plumbing permit instead.
What should you do next?
- 1Decide which setup you have. One building's ejector goes to the plumbing permit; a multi-building station goes to ADEQ and the city.
- 2Book the city meeting early in Scottsdale, Peoria and Gilbert, and get the City Engineer's approval in Chandler and Mesa.
- 3Keep the station off public right-of-way and easements where the city says so.
- 4Have an Arizona-registered engineer design to R18-9-E301 and the city manual, then file the Notice of Intent. In Maricopa County, the county Environmental Services Department issues the Approval to Construct.
- 5Keep the O&M manual, alarm contacts and maintenance records for the life of the facility, and send Gilbert its yearly records.
- 6Test the alarms and swap the lead pump on a schedule so the standby pump actually runs when needed.
What do people get wrong?
- "Private means unregulated." ADEQ's 4.01 covers private systems, and cities review them too.
- "A big single pump is enough." State and city rules all ask for at least two.
- "The city will take it over later." Phoenix and Scottsdale warn that private stations may need upgrades if the city is ever asked to assume them.
- "An ejector is a small lift station." For permits, it's building plumbing, not a collection system.
- "The ejector line can run down the street to a neighbor's connection." Scottsdale doesn't support private pressurized ejector lines across neighboring frontages.
What happens if you skip it?
Under R18-9-A301, construction can't start before the Construction Authorization, and the station can't discharge before the Discharge Authorization. Several cities won't accept a private station on public land at all, so a station in the wrong place gets redesigned before approval.
Lift station design and permitting belong to a registered civil engineer. When sewage backs up into the building, clearing and camera-inspecting the building drain and sewer lines is plumbing work, and HQ answers those calls 24/7.
This page explains the rule. The official text at the source above governs.
- A.A.C. R18-9-E301, 4.01 General Permit: Sewage Collection Systems (Cornell LII)
- A.A.C. R18-9-A301, Construction and Discharge Authorization (Cornell LII)
- City of Phoenix: Design Standards Manual for Water and Wastewater Systems, 2021 (PDF)
- City of Phoenix: Wastewater Lift Station Design Guidance Manual, 2012 (PDF)
- City of Scottsdale: Sewer Lift Station Design Criteria, 2021, updated 2022 (PDF)
- Town of Gilbert: Public Works and Engineering Standards 2026 (PDF)
Sewer Lines in Other Cities
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
- ChandlerChandler sewer line responsibility: who repairs the pipe to the main
- ChandlerChandler sewer tap permit: what 51-7 and the street permit require
- GlendaleGlendale City Code 33-217: who repairs the sewer line from the building to the street
- PhoenixWho pays to extend a sewer main in Phoenix?
- PhoenixDo you need a permit to connect to or work on a public sewer in Phoenix?
More Valley-Wide Codes and Permits
- Sewer LinesWho Owns the Sewer Line From the Building to the Main, by City
- Commercial PlumbingWhich Businesses Need a Backflow Assembly in Each Valley City
- Gas LinesGas Line Permits in Each Valley City
- Gas LinesGas Line Burial Depth Rules in Each Valley City
- Gas LinesGas Line Pressure Test Rules in Each Valley City
- Gas LinesGetting Gas Turned On After Inspection in Each Valley City
Related Rules and Questions
- ArizonaAAC R18-9-E301: Lift Station Permits
- UPCUPC Section 710: When Phoenix Code Requires a Backwater Valve
- PhoenixPhoenix City Code 28-12: Which businesses must install a grease or oil interceptor?
- Valley-WideRetention Basin and Drywell Rules by Valley City
- FAQWhat is a sewage lift station and how do you maintain it?
- FAQWhere can a sump pump legally discharge?
- FAQDo I need a backwater valve, and when does code require one?