In Glendale, no one may uncover or connect to a public sewer without a written city permit, and a building connection also needs a valid city plumbing permit first. The owner pays for the building connection and exposes the main, but the city itself makes the tap. Right-of-way work needs additional permits and a specially licensed contractor.
“No unauthorized person shall uncover, make any connections with, take any action to alter, adversely impact or otherwise affect any public sewer or appurtenance thereof without first obtaining a written permit from the City.”
- Applies to:
- Owners, developers and contractors connecting a building to a Glendale public sewer or working on a tap in the street
- Official fee:
- tap charge set by the city; the city's June 2026 ADU estimate lists a right-of-way permit of $443.60 and a right-of-way review fee of $35.88
- In force:
- Glendale City Code Ch. 33, Art. III, Div. 2 (Ord. 3003, 2016)
- Last verified:
- October 4, 2026, against the official page
Connecting a new building to the Glendale sewer looks like one job, but the code splits it between three parties: the owner, the city crew and the contractor. Getting the order wrong can stall a project at the street, so it helps to know who does what before anyone opens the ground.
What do Glendale City Code 33-126 to 33-129 say?
Section 33-126(a) is the permit rule: "No unauthorized person shall uncover, make any connections with, take any action to alter, adversely impact or otherwise affect any public sewer or appurtenance thereof without first obtaining a written permit from the City."
Subsection (b) adds that anyone applying for a building connection "shall present a valid plumbing permit issued by the City as a prerequisite for the approval of the requested building connection." Subsection (c) covers any other action that may affect the city sewer: the applicant describes the action and its expected impact, with the city approval fee.
Section 33-127 puts the cost on the owner: building connections are "installed at the property owner's expense" to city building codes, and the city approves the design, number, location, manner of connection and size. Connections go on lateral sewers only, unless the city specifically authorizes otherwise. The city may perform the connection itself for lines of four inches or more, and the owner then pays a connection fee.
Section 33-129 covers the tap itself: "The City shall make all taps from the City's sewer system." The owner makes the cuts to expose the main, provides shoring when required, and furnishes and installs the saddle tee with collar or wyes. A tap charge set by the city is paid before the tap is made.
What do the key terms mean?
- Building connection: the connection from a building's sewer to the public sewer.
- Appurtenance: a structure that belongs to the public sewer, such as a manhole.
- Lateral sewer: the smaller sewer line that serves a street or block; building connections go on these unless the city says otherwise.
- Wet tap: a tap made into a sewer that is in service. The section requires the city to make it.
Who does this cover?
Owners, developers and contractors connecting a building to a Glendale public sewer, and anyone opening the ground near a public sewer. It does not cover private lines on the owner's lot, which follow the plumbing permit rules, or the repair of an existing line, which is covered by Sec. 33-217.
Quick check: who does what?
| Step | Who | Section |
|---|---|---|
| Valid plumbing permit | Owner or contractor, before the connection is approved | 33-126(b) |
| Written permit to touch the public sewer | Applicant, from the city | 33-126(a) |
| Design, location and size approved | City | 33-127(a) |
| Expose the main and provide shoring | Owner | 33-129 |
| Furnish and install the saddle tee or wyes | Owner | 33-129 |
| Make the tap | City crew | 33-129 |
| Tap charge | Owner, paid before the tap | 33-129 |
| Cost of the building connection | Owner | 33-127(a) |
What does this look like in real life?
A new restaurant pad with a sewer in the street. The owner's contractor has the plumbing permit, gets the written city permit, digs to expose the main and supplies the saddle tee. The city crew makes the tap after the charge is paid.
A home addition with a new accessory dwelling unit. The city's ADU sheet says a separate water meter needs a new water tap to the city main in the street or right-of-way, and that work in the right-of-way requires additional permits and a specially licensed contractor. Its June 2026 estimate lists a right-of-way permit at $443.60 and a right-of-way review fee at $35.88. Those numbers come from the ADU estimate, not from a general fee schedule, so confirm the current amounts for your project.
The edge case: the city performs the connection. For lines of four inches or more, the city may make the whole connection if it thinks that is in its best interest. The owner then pays a connection fee instead of doing the work.
What should you do next?
- 1Confirm the plumbing permit is issued. Without it the city will not approve the building connection.
- 2Ask the Development Services Center (5850 W Glendale Ave, 623-930-2800) which written permit and approval fee apply to your connection.
- 3Get the connection design, location and size approved by the city.
- 4Hire a contractor able to work in the right-of-way. Ask the city which license and additional permits your job needs.
- 5Call Arizona 811 before any excavation.
- 6Pay the tap charge before the tap date, expose the main with shoring when required, and set the saddle tee.
- 7Schedule the city crew for the tap and keep the permits and receipts with the project file.
What do people get wrong?
- "My plumber taps the main." In Glendale the city crew makes the tap. The owner prepares the excavation and the fitting.
- "The plumbing permit covers the street." The plumbing permit is a prerequisite, and the sewer permit is separate.
- "The ADU fees are the general fees." The $443.60 and $35.88 figures come from an ADU estimate sheet.
- "Every city works this way." Surprise sends its street-dig permit to the city and Mesa sends it to the City Engineer.
Full text and source
The rules are Glendale City Code Secs. 33-126, 33-127 and 33-129 on Municode. They are short, so read them yourself. The city's answer for your project, not this summary, decides a real dispute.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Surprise | Digging to lay sewer pipe in public streets, right-of-way, alleys or city property needs a city construction permit first, and doing it without one is a class 1 misdemeanor. | Surprise Municipal Code 58-425 Verified September 29, 2026 |
| Mesa | It is unlawful to dig up a street or alley to connect to the sewer without first getting a permit from the City Engineer, or to leave it unrestored afterward. | Mesa City Code 8-4-4 Verified September 28, 2026 |
| Scottsdale | No excavation in a street, alley or right-of-way to connect to the sewer without complying with the city's right-of-way permit article, and the street must be restored to its original condition. | Scottsdale Revised Code 49-115 Verified September 28, 2026 |
This page explains the rule. The official text at the source above governs.
- Glendale City Code Sec. 33-126, Permit (Municode)
- Glendale City Code Sec. 33-127, Building connections (Municode)
- Glendale City Code Sec. 33-129, Sewer wet taps (Municode)
- City of Glendale, Accessory Dwelling Unit requirements and fee estimates (revised 06-25-2026)
- Surprise Municipal Code Sec. 58-425, Permit required (Municode)
- Mesa City Code 8-4-4, Digging up streets or alleys to connect to the sewer (Municode)
- Scottsdale Revised Code Sec. 49-115, Excavation to connect to city sewer (Municode)
Sewer Lines in Other Cities
- Fountain HillsWhen does Fountain Hills require a sewer easement encroachment permit?
- Litchfield ParkLitchfield Park City Code 7-16-1: right-of-way permit for plumbing work in the street
- Paradise ValleyWhat permit does Paradise Valley require to connect to the sewer?
- PhoenixDo you need a separate permit for a water or sewer tap in Phoenix?
- SurpriseSurprise City Code 58-425 and 58-218: permits to dig for sewer and water lines
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
More Glendale Codes and Permits
- Sewer LinesGlendale City Code 33-217: who repairs the sewer line from the building to the street
- Permits and InspectionsWhat plumbing and gas code does Glendale use?
- Commercial PlumbingGlendale City Code 33-238: grease interceptors must be pumped every 180 days
- Backflow PreventionGlendale City Code 33-90: which businesses need a backflow device
- Backflow PreventionGlendale City Code 33-92: backflow devices on fire sprinkler services
- Backflow PreventionGlendale City Code 33-94: annual backflow test, records and shutoff
Related Rules and Questions
- Valley-WideRight-of-Way Permits for Plumbing Work by Valley City
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- Valley-WidePavement Cut and Street Restoration Rules by Valley City
- FAQDo I need a permit to dig in the street right-of-way to fix my sewer or water line in Phoenix?
- FAQUtility easement vs right-of-way: who can dig to fix my sewer?
- FAQTrenchless sewer repair vs digging: what's the difference?
- Sewer Repair & Installation