The recorded easement and local rules decide. Chandler and Glendale plats specifically allow wood, wire or removable-section fencing, Surprise bars accessory structures, and Avondale pools and Glendale ADUs have specific written-consent requirements. Digging in one takes a city permit in Phoenix, Gilbert and Mesa.
“The City of Phoenix requires a civil permit to excavate within a PUE.”
- Applies to:
- Property owners, commercial landlords, builders, pool and landscape contractors, and plumbers working in or over a public utility, water or sewer easement
- Official fee:
- Permit and encroachment fees vary by utility and city; request the currently adopted schedule before applying.
- In force:
- Each city's code as read on the verified date; FHSD Building Permit Review and Construction Checklist (effective 3/30/2018)
- Last verified:
- October 4, 2026, against the official page
What Does Each Valley City Require?
| Where | What applies | Source |
|---|---|---|
| Phoenix | Digging in a public utility easement takes a city civil permit. Get permission to enter the property the utility sits on first, then call Arizona 811 before you dig. | Phoenix Water Services, Accessing and Excavating in a Public Utility Easement Verified October 4, 2026 |
| Scottsdale | The owner maintains public utility, water and sewer easements unless the dedication says otherwise. Nothing may block access to a sewer line, and a private sewer may enter an easement only to connect directly to the public sewer. | Scottsdale Revised Code 49-18(c), 49-102(b) and 49-127 Verified October 4, 2026 |
| Chandler | Final plats must note that construction in utility easements is limited to public services, utilities, and wood, wire or removable section type fencing. | Chandler City Code 48-8.10(C) Verified October 4, 2026 |
| Glendale | Plats carry a note allowing only wood, wire or removable section-type fencing, or construction approved in writing by every utility using the easement and the city. An ADU cannot encroach on a public utility easement without written consent from each easement holder and utility. | Glendale City Code 31-25; city ADU handout reproducing UDC35.3.204 (revised 6/25/2026) Verified October 4, 2026 |
| Mesa | Excavating or building in a public easement needs a Right-of-Way Permit. Walls, fences, mailboxes or fill that interfere with the city's gas system can be removed by the city at the customer's cost. | Mesa City Code 9-1-2(A) and 5-14-4(F) Verified October 4, 2026 |
| Gilbert | Work on, below or above a town public utility easement needs a town permit, the same as street work. Unauthorized work is trespass. | Gilbert Town Code 10-5(a) Verified October 4, 2026 |
| Surprise | Residential accessory structures cannot sit in any easement. If utility work destroys plants or fences in an easement, the owner replaces them. | Surprise LDO 106-10.3(A) and 107-2.2 Verified October 4, 2026 |
| Avondale | A pool cannot sit in any recorded easement without the easement holder's written approval, recorded with the County Recorder. | Avondale City Code 28-136 Verified October 4, 2026 |
| Paradise Valley | Continuing or permanent use, work or encroachment in an easement is unlawful without an encroachment permit from the Town Engineer. | Paradise Valley Town Code 5-10-1 Verified October 4, 2026 |
| Cave Creek | Any work in a public right-of-way or public utility easement of the town, including pipelines and utility lines, needs a town permit, approval of the planned work, and town supervision and inspection. | Cave Creek Town Code 93.15 Verified October 4, 2026 |
| Fountain Hills | For proposed work in a public utility easement containing a sewer main, apply to the Sanitary District for an encroachment permit. If granted, include it in the Town building-permit resubmittal. | Fountain Hills Sanitary District, Building Permit Review and Construction Checklist (effective 3/30/2018) Verified October 4, 2026 |
A public utility easement is a strip of your own land that the city and utilities have the right to use. You still own it, and in Scottsdale you still maintain it, but what you put on it is limited. The recorded easement and local rules decide what is allowed. Chandler and Glendale have specific removable-fence plat provisions, while other cities require permits or restrict accessory structures. A fence is not automatically allowed simply because it is removable.
What does Phoenix say about digging in a utility easement?
Phoenix Water Services puts it in one line: "The City of Phoenix requires a civil permit to excavate within a PUE." Its flyer lists three steps: get permission to enter the property where the utility is located, get the civil permit from the Planning and Development civil permits counter, and call Arizona 811 before digging, which is free.
The other cities write the same idea into code, with more detail on what may be built:
- Fence yes, wall maybe: Chandler and Glendale plats allow "wood, wire or removable section type fencing" and nothing permanent without utility sign-off.
- No sheds or accessory buildings: Surprise bars residential accessory structures in any easement.
- Written consent for the big stuff: pools in Avondale and ADUs in Glendale. Review the actual easement and current zoning rule for other structures.
- Permit to dig: Phoenix, Mesa, Gilbert, Paradise Valley and Cave Creek require one for work in an easement.
What do the key terms mean?
- Public utility easement (PUE). A recorded right for utilities to place and reach their lines on private land, usually along a rear or side lot line. Your plat or title report shows it.
- Water or sewer easement. Same idea, dedicated to the city for a specific main. Scottsdale won't serve a parcel from public lines that aren't in a dedicated easement or right-of-way.
- Encroachment. Anything of yours inside the easement: a wall, slab, pool, tree or ADU corner.
- Encroachment permit. Written permission from the easement holder to put something there. Paradise Valley and the Fountain Hills Sanitary District issue them by that name.
- Easement holder. Every utility with rights in the strip, which can mean the city, SRP or APS, Southwest Gas and cable companies at once.
Who does this cover?
Homeowners adding a pool, casita, wall or trees near a back lot line, and the contractors building them. It covers commercial owners and developers too: a building projection, dumpster enclosure or private sewer line routed through an easement hits the same rules. And it covers any plumber digging to a sewer or water main that runs through a neighbor's or your own easement.
Quick check: can you build it here?
| What you want in the easement | Likely answer | Why |
|---|---|---|
| Chain-link or wood fence across a Chandler PUE | Allowed on platted easements | Chandler 48-8.10(C) |
| Block wall across a Glendale easement | Only with written approval from every utility and the city | Glendale 31-25 plat note |
| Shed in a Surprise rear easement | No | Surprise LDO 106-10.3(A) |
| Pool edge inside an Avondale easement | Written, recorded approval from the easement holder | Avondale 28-136 |
| Casita corner over a Glendale PUE | Written consent from each easement holder and affected utility | City ADU handout, UDC35.3.204 |
| Private sewer line run along a Scottsdale easement | No; it may cross only to connect | Scottsdale 49-127 |
| Trench to a main in a Gilbert PUE | Town permit first | Gilbert 10-5(a) |
| Water line trench in a Cave Creek PUE | Town permit, approval and inspection | Cave Creek 93.15 |
| Proposed work in a Fountain Hills PUE containing a sewer main | District encroachment application; approval is conditional | FHSD checklist item 1a |
What does this look like in real life?
A backyard casita in Glendale. The plans put one corner three feet into the rear PUE. Glendale's rule says the unit "shall not encroach upon an existing or planned public utility easement" unless the owner has written consent from each easement holder and each affected utility. Getting those letters takes time, so moving the unit is often faster.
A Surprise fence taken down for a sewer repair. The city's contractor removes a section of fence and shrubs in the sewer easement to reach the main. Under LDO 107-2.2, plants and fences destroyed by utility work in an easement "shall be replaced in accordance with the approved landscape plan by the property owner."
A Scottsdale strip center rerouting its sewer. The owner wants the new private line to follow the rear easement to a better connection point. Scottsdale 49-127 says building sewers and laterals "shall not be installed in a public utility easement or Right-of-Way except to directly connect to a public sewer," so the line has to stay on the property until it turns in to connect.
A Mesa owner with a block wall over a gas line. Mesa 5-14-4(F) lets the city remove or modify any wall, fence or fill that interferes with its gas system and charge the customer.
What should you do next?
- 1Pull your plat or title report and find every easement and its width. The plat notes say what is allowed.
- 2Call Arizona 811 before any digging, even a fence post hole.
- 3List the easement holders and ask each one for written consent if you plan anything permanent.
- 4Confirm and obtain the permits required for the proposed work. Public or utility easement excavation can require a civil permit in Phoenix, a Right-of-Way Permit in Mesa, a town permit in Gilbert, or an encroachment permit in Paradise Valley. Apply each local rule to the actual easement and work; a private easement does not by itself establish a city permit requirement.
- 5Record the approval where the code asks, as Avondale does for pools.
- 6Keep the easement reachable. Scottsdale bars anything that blocks "free access to or flow of" a sewer line.
What do people get wrong?
- "It's my land, so I can build on it." You own it, but the easement holders' rights come first, and several codes let the city remove what's in the way at your cost.
- "The city will put my fence back." In Surprise the owner replaces plants and fences after utility work.
- "Only structures count." Fences and landscaping can affect utility access; check the recorded easement and the utility's requirements before installing them.
- "A building permit clears the easement." Consent from the easement holders is a separate step.
When your sewer or water line runs through an easement, HQ can inspect and repair water and sewer lines. Confirm easement access, city permits and the authorized scope before work begins.
This page explains the rule. The official text at the source above governs.
- Glendale ADU requirements reproducing UDC35.3.204 (revised 6/25/2026)
- Glendale City Code 31-25, Final plats (Municode)
- Scottsdale Revised Code 49-102, Users responsibility; obstructing access to system (Municode)
- Mesa City Code 5-14-4, Minimum Requirements for Gas Service (Municode)
- Surprise Land Development Ordinance 106-10.3 (Municode)
- Fountain Hills Sanitary District, Building Permit Review and Construction Checklist (effective 3/30/2018)
Permits and Inspections in Other Cities
- ChandlerChandler City Code 29-1.3: violations, penalties and stop work orders
- ChandlerWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- ChandlerChandler plumbing and gas work that needs no permit (City Code 29-6.7)
- ChandlerWhich plumbing and gas codes does Chandler enforce?
- ChandlerChandler plumbing inspections: the required list and inspection codes
- ChandlerDo you need a permit to repipe a house in Chandler?
More Valley-Wide Codes and Permits
- Permits and InspectionsPavement Cut and Street Restoration Rules by Valley City
- Permits and InspectionsRight-of-Way Permits for Plumbing Work by Valley City
- Permits and InspectionsWater and Sewer Tap Permits and City Fees, by Valley City
- Commercial PlumbingWhich Businesses Need a Backflow Assembly in Each Valley City
- Gas LinesGas Line Permits in Each Valley City
- Gas LinesGas Line Burial Depth Rules in Each Valley City
Related Rules and Questions
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- Valley-WideWater and Sewer Main Extensions: Who Pays and Who Builds, by City
- ArizonaA.R.S. 40-360.22: Call Arizona 811 Before You Dig