Chandler lets you book a plumbing inspection three ways: the CLICS online portal, the automated phone line at 480-782-3100, or a text to 844-281-3520 with the permit number, three-digit inspection code and date. The city's manual says to request it at least one business day ahead, with the work exposed.
“The City of Chandler offers a free texting service for customers and contractors to schedule construction inspections and receive results via text messaging.”
- Applies to:
- Homeowners and licensed contractors with an open Chandler plumbing or building permit
- Official fee:
- not published on the scheduling pages; the city calls its texting service free
- In force:
- Homeowner Building Permit Manual (Rev. 4/09/26); city inspections page as read 2026-09-29
- Last verified:
- September 29, 2026, against the official page
A Chandler plumbing permit does nothing for you until the inspector signs off, and the inspector only comes when you ask. The city gives you three ways to ask, and the fastest one is a text message. The surprising part is what the city does not publish: no cutoff time on the day before, and no inspection window.
How does Chandler let you schedule an inspection?
Chandler runs three channels: an online portal, a phone system and a text service. The city describes the last one this way: "The City of Chandler offers a free texting service for customers and contractors to schedule construction inspections and receive results via text messaging." The Homeowner Building Permit Manual covers all three and adds the timing rule: "To schedule an inspection, see pages 5 or 6 of this manual, or refer to the back of your inspection card at least one business day in advance of when the inspection is needed."
What you need on hand, whichever channel you use:
- The permit number from your permit.
- The three-digit inspection code for the stage you want. The manual says the codes and instructions are on the inspection card issued with the permit, and the city's inspections page lists them.
- The date you want.
What do the key terms mean?
- Inspection code: a three-digit number for each inspection type. The plumbing and gas group runs 729 to 746 on the city's list, for example 731 Building Drain, 733 Rough Plumbing/Topout, 734 Water Service and 745 Plumbing Final and Water Meter Verified. The full plumbing list and what each stage requires are on our required inspections page.
- Correction notice: what you get when the work does not pass. The manual says "An inspector will visit the property and either provide an approval or a correction notice."
- Exposed: the manual's condition for every stage: "All work to be inspected must be accessible and exposed." Our reading: a request for a pipe that is already behind drywall or under concrete will not get a pass.
- IVR: the Interactive Voice Response system, meaning the automated phone line.
Who does this cover?
It covers anyone with an open Chandler permit: a homeowner working under the Homeowner Building Permit Manual, or a contractor. The city's texting service is offered to "customers and contractors" alike. It does not apply to work that needs no permit, because there is no permit number to book against, and it does not cover the site-utility codes in the 400s (such as 411 Sanitary Sewer - Pipe), which sit in the city's separate civil engineering list. Our reading: those are for development work, not a house or shop plumbing permit.
Quick check: which channel fits your situation?
| Situation | Best channel | Why |
|---|---|---|
| You are at the jobsite with your phone and know the code | Text to 844-281-3520 | One text with the permit number, code and date books it. |
| You want to add a note for the inspector | Text, or the portal | The city says you can reply to the confirmation text with a note, and the portal has an additional notes step. |
| You do not know the code yet | Portal (CLICS) | You pick from the inspections on your permit instead of typing a code. |
| You have no smartphone | Phone line, 480-782-3100 | It is a touch-tone system that prompts you through booking, cancelling or getting results. |
| You need to move or cancel a booking | Text C or RESCHED | Both commands are on the city's shortcut list; the phone line can also cancel. |
| You want the result | Text RESULT and the permit number, or the portal | The city lists both; the portal also shows plan review comments. |
| You have a question, not a booking | Development Services, 480-782-3000 | The city's contact line for additional questions. |
What does this look like in real life?
A bathroom addition, rough plumbing. The pipes are in the wall and under pressure test. On a Monday afternoon the plumber texts the request for code 733 for Wednesday, which meets the one-business-day rule. The inspector passes it and drywall goes up.
A slab job. The under-slab drain is in and shaded, and the concrete crew is due Thursday. The request for the building drain (code 731) has to go in ahead of that, with time to spare, because the manual asks for at least one business day of notice.
The edge case: the work is not ready. The test fails the night before or the trench is not open yet. Your booking is already in the system, and the right move is to text C, the permit number and the code (or RESCHED with the same two items) rather than let the inspector arrive to covered or unfinished work.
What should you do next?
- 1Find your permit number and the inspection card issued with it.
- 2Pick the three-digit code that matches the stage, such as 733 for rough plumbing.
- 3Make sure the work is exposed, and under pressure test where the stage calls for it.
- 4Book at least one business day ahead. By text, send
S permit-number code dateto 844-281-3520. The city's own example is "s bld200000 701 10/12", so a rough plumbing request would look likeS BLD200000 733 10/12(our example, not a real permit). - 5Watch for the confirmation text. The city says "You will receive a text back acknowledging receipt." and that you can respond with a note to the inspector and confirm the inspection.
- 6Online instead? Go to chandleraz.gov/clics, open the Development Services tab, choose schedule an inspection and search your permit number. Step 6 of the manual reads "Choose inspections to schedule, select the day, select all day and click continue."
- 7After the visit, text RESULT with the permit number, or check the portal.
What do people get wrong?
- Booking the morning of. The manual says at least one business day in advance. Other Valley cities set hard cutoffs, listed below; Chandler's pages do not print one, so plan for the day before.
- Thinking 480-782-3000 books inspections. That is the Development Services line for questions. Booking by phone is the automated line at 480-782-3100.
- Assuming any text works. The city's format needs the command, the permit number, the three-digit code and the date, in that order.
- Expecting to pick a time slot. Our reading: the portal step above has you select the day and "all day," and neither the inspections page nor the manual promises an arrival time. Ask your inspector if timing matters. The manual points to a map of inspection areas with Building Inspector contact information on the city site.
Full text and source
The scheduling commands and inspection codes come from the city's Inspections page. The one-business-day rule, the portal steps and the phone system come from the Homeowner Building Permit Manual (Rev. 4/09/26). Chandler enforces the 2024 IPC, IFGC and IRC through Ordinance 5108, effective July 1, 2025, and the inspection process above is a city procedure, not a section of those codes.
This page explains the city's scheduling process as published on the date above; the city's own pages and your permit paperwork govern.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Avondale | Text (833) 324-1348 or use the Selectron website. A request made before 4:00 PM is scheduled for the next business day. Inspections run Monday to Thursday, 7:00 AM to 4:00 PM, and the city is closed Fridays. | Avondale Building Services, Inspections page Verified September 29, 2026 |
| Buckeye | Since March 30, 2026 inspections are requested online, by 3 p.m. for the next business day. A later request is scheduled in two business days or the next available day. | Buckeye Development Services, Inspections page Verified September 29, 2026 |
This page explains the rule. The official text at the source above governs.
Permits and Inspections in Other Cities
- GlendaleGlendale policy: tub and shower boxes must be grouted before the inspection
- MesaWhen do you need a plumbing permit in Mesa, and what is exempt? City Code 4-1-4
- Paradise ValleyDoes Paradise Valley require a permit to dig in the right-of-way?
- ScottsdaleDoes Scottsdale require a permit to dig in the right-of-way for plumbing?
- GilbertGilbert Town Code 66-8: the permit to dig a street or alley for a water or sewer connection
- GlendaleWhat plumbing and gas code does Glendale use?
More Chandler Codes and Permits
- Permits and InspectionsCan you appeal a Chandler building official decision?
- Permits and InspectionsChandler City Code 29-1.3: violations, penalties and stop work orders
- Permits and InspectionsWhat does Chandler City Code 29-4 change in the International Plumbing Code?
- Permits and InspectionsChandler plumbing and gas work that needs no permit (City Code 29-6.7)
- Permits and InspectionsWhich plumbing and gas codes does Chandler enforce?
- Permits and InspectionsChandler plumbing inspections: the required list and inspection codes
Related Rules and Questions
- ChandlerCan a homeowner pull a plumbing permit in Chandler? Owner rules and how to apply
- ChandlerWhat happens if you do plumbing work without a permit in Chandler?
- MesaWhat plumbing inspections does Mesa require? City Code 4-1-5 rough-in, concealment and final
- FAQCan I do my own plumbing work on my house in Arizona?
- FAQWhat plumbing work needs a permit in Phoenix?
- Residential Plumbing
- Commercial Plumbing