What is the Chandler water meter worksheet when you add plumbing fixtures?

Verified September 29, 2026
In Short

Chandler's Homeowner Building Permit Manual asks for a water meter worksheet when you add plumbing fixtures to a room addition, and says remodels typically follow the same requirements. The worksheet totals fixture units, gives the pipe length from the meter to the farthest fixture, and lists the meter and supply size. It goes on the plans.

Official Source
City of Chandler: Homeowner Building Permit Manual
Chandler Homeowner Building Permit Manual (Rev. 4/09/26), Room Additions and Appendix A
“Please provide a water meter work sheet if you are adding plumbing fixtures (see Appendix A for an example). This information must be on the plans, not a separate sheet.”
Applies to:
Homeowners, owner-builders and contractors adding plumbing fixtures in a Chandler room addition, accessory dwelling unit or remodel
Official fee:
Not published for the worksheet; it is part of the plans submitted for the building permit
In force:
Homeowner Building Permit Manual Rev. 4/09/26; 2024 IRC as adopted in Chandler City Code 29-6 (Ord. 5108, eff. 2025-07-01)
Last verified:
September 29, 2026, against the official page

Adding a bathroom or a laundry sink in Chandler means adding a small piece of math to your plans. The city wants to see that the meter and supply line can feed everything on the property. The surprise is where it goes: on the plans themselves, not on a loose sheet.

What does the Chandler manual say about the water meter worksheet?

The Room Additions section of the Chandler Homeowner Building Permit Manual says: "Please provide a water meter work sheet if you are adding plumbing fixtures (see Appendix A for an example). This information must be on the plans, not a separate sheet." That sentence tells you when (adding fixtures), what (a worksheet) and where (on the plans).

The manual's Remodeling section adds that "Remodeling projects typically need to comply with the same requirements listed for room additions." Our reading: a remodel that adds fixtures gets the same worksheet request, since the manual points remodels to the room addition list.

Appendix A (printed pages 51 and 52) is the worksheet. It has three parts:

  • Fixture units. You count each fixture and multiply by a set value, then add the total.
  • Pipe length. The manual asks for the "Total developed length of the water line from the water meter to the furthest water-using fixture unit" and notes "this is usually the hose bib at the rear of the home."
  • Meter and supply size. You list the size of the existing meter and supply line. For a room addition the manual says "please include both the existing and new on this sheet."

Chandler adopted the 2024 IRC, with local amendments, in City Code 29-6 (Ord. 5108, effective 2025-07-01). The amendments listed in 29-6 cover items such as permit exemptions, fees and energy sections. We did not find an amendment to the IRC water supply chapter in that list, so the worksheet is the city's own submittal form rather than a code amendment.

What do fixture units mean, and which values does Chandler use?

A fixture unit is a rating for how much load a fixture puts on the water supply. The manual does not define it, so this is our reading of the term. Here are Appendix A's values, as printed:

FixtureValue each
Water closet (tank type)2.2
Shower stall1.4
Bathtub (with or without overhead shower head)1.4
Lavatory0.8
Kitchen sink, dishwasher, laundry or utility sink, automatic clothes washer1.4 each
Hose bibs (the sheet says "count all")2.5 each
Full bath group3.6
Half bath group (water closet and lavatory)2.6
Kitchen group (dishwasher and sink)2.5
Laundry group (clothes washer standpipe and laundry tub)2.5

The sheet says "If you use a full bath group, do not count the individual fixtures." It says that about the full bath group only. Our reading is that the same logic covers the other groups, since counting a group and its parts would double count. That reading matters: a half bath counted as a group is 2.6, but counted piece by piece it is 3.0 (2.2 plus 0.8).

Who does this cover?

The manual expressly requests the worksheet for residential room additions that add plumbing fixtures, and says remodels typically follow those requirements. It separately discusses accessory dwelling units. Its printed zoning text says ADUs "shall be served by the same water, sewer, and electric-utility providers and meters as the primary residence." Ask the plan reviewer how to show the combined existing and new fixture demand for an ADU; the manual does not separately describe the ADU worksheet procedure.

The manual's worksheet sentence addresses added fixtures in room additions; remodels typically follow those submittal requirements. It does not separately decide the worksheet requirements for a fixture relocation or other water-supply changes. Ask the plan reviewer about that scope. A residential water heater or softener replacement may be permit-exempt when Chandler's applicable same-location and equal-or-lesser rating or capacity conditions are met; separate piping or equipment changes must be considered separately.

Quick check: does your job need the worksheet?

JobWorksheet?Why
Room addition with a new bathroomYesFixtures are added; existing and new both go on the sheet
Detached ADU with kitchen and bathConfirm the worksheet submittal with the plan reviewerThe manual says ADUs share the primary residence's meters, but does not separately describe the ADU worksheet procedure
Remodel that adds a second sink in the hall bathYes, our readingRemodels typically follow the room addition requirements
Remodel that moves a toilet and adds no fixturesAsk the plan reviewerThe cited sentence addresses added fixtures; it does not separately resolve worksheet requirements for relocation or water-supply changes
Qualifying like-for-like residential water heater replacementNo worksheet submittal for the exempt replacement aloneConfirm the applicable same-location and equal-or-lesser BTU or amperage condition; separate plumbing changes are a separate question
Add a hose bib on the back wallYes, our readingHose bibs are on the sheet at 2.5 each
New houseYes, our reading; the manual notes the minimum meter size for new construction is 1 inchAppendix A note about the 1 inch minimum

What does this look like in real life?

A bathroom added to a three-bedroom house. The existing house has two full baths, one kitchen group, one laundry group and four hose bibs. Using Appendix A's values: two full bath groups at 3.6 is 7.2, plus 2.5 for the kitchen, 2.5 for laundry and 10.0 for four hose bibs, which is 22.2. Adding one more full bath group brings it to 25.8. That total, the developed pipe length to the actual farthest water-using fixture, and the meter and supply size go on the plans.

The edge case: the meter is the old size. The manual's note reads "NOTE: The minimum water meter size for new construction is 1 inch." An older Chandler home may have a smaller meter. The manual does not say an addition triggers an upsize. Our reading: the note applies to new construction, and the worksheet is there so the reviewer can see what the existing meter serves. The manual does not publish a maximum fixture-unit table for each meter size.

What should you do next?

  1. 1Count every fixture on the property, existing and new, including every hose bib.
  2. 2Fill in Appendix A of the Homeowner Building Permit Manual (Chandler Development Services, chandleraz.gov).
  3. 3Measure the developed length of the water line from the meter to the farthest water-using fixture, usually the rear hose bib.
  4. 4Read the existing meter size from the meter box and note the supply line size.
  5. 5Draw the worksheet information onto the plans, not onto a separate sheet.
  6. 6Submit the plans with the building permit application. The manual lists the Construction Permit Counter at 215 East Buffalo and Development Services at 480-782-3000.

What do people get wrong?

  • Attaching the worksheet as a separate page. The manual says the information "must be on the plans, not a separate sheet."
  • Counting only the new fixtures. For a room addition the sheet asks you to "include both the existing and new on this sheet."
  • Counting the parts and the group. The sheet says not to count individual fixtures when you use a full bath group.
  • Using any city's worksheet. Values differ between Chandler and Phoenix, as shown above.
  • Mixing it up with the water meter certificate. Chandler's Water Meter Certificate (UDM-115) is a separate form with a registered architect, landscape architect or engineer certification block. It says "The System Development Fees and Meter Fees apply to any certified meter called out on the Water Meter Certificate." The form does not specify which projects must submit it. Ask Development Services whether UDM-115 is required for your project and how it relates to the worksheet on the plans.

This page explains Chandler's published manual and code as read on the date above. The city's current forms and adopted text govern.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
PhoenixPhoenix has its own Residential Water Meter Worksheet (TRT 00300) that asks for existing and additional fixture units, pipe length and pressure figures, with its own fixture values (lavatory 0.7 where Chandler's sheet says 0.8). Phoenix's guideline also sets a 1-inch minimum for all new building taps.Phoenix TRT 00300 and TRT 00142 note 5
Verified September 29, 2026
Cave CreekCave Creek's residential plan review checklist wants a fixture unit calculation sizing the water service line, water meter or equivalent well service, plus the water service pipe size by fixture count.Town of Cave Creek Residential Plan Review Check List, plumbing (IRC P2903)
Verified September 29, 2026

This page explains the rule. The official text at the source above governs.

Sources

Permits and Inspections in Other Cities

More Chandler Codes and Permits

Related Rules and Questions

Questions About Chandler Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.