Chandler plumbing inspections: the required list and inspection codes

Verified September 29, 2026
In Short

Chandler inspects plumbing in stages, and each stage must be exposed and passed before the work is covered: groundwork, water piping, building sewer, water service, upper-level drainage, rough plumbing under pressure test, and a final. The city's inspection codes for plumbing run from 729 to 746. Request each inspection at least one business day ahead.

Official Source
Chandler Homeowner Building Permit Manual, Required Inspections (Development Services)
Chandler Homeowner Building Permit Manual, List of Required Inspections; Chandler inspection codes 729 to 746
“All rough-in plumbing is installed and under pressure test, but not covered.”
Applies to:
Chandler homeowners and licensed plumbing contractors working under a plumbing or building permit
Official fee:
Inspections are included in the permit fee; the city charges separately for reinspections and after-hours inspections
In force:
Homeowner Building Permit Manual (Rev. 4/09/26); 2024 IRC and IPC as amended by City Code 29-4 and 29-6, since July 1, 2025
Last verified:
September 29, 2026, against the official page

A plumbing permit in Chandler is really a series of inspections. If you cover a pipe before the inspector sees it, you will be asked to open it back up. This page lists the stages the city publishes, the inspection codes you use to book them, and how to schedule.

What plumbing inspections does Chandler require?

The Homeowner Building Permit Manual lists the minimum inspections and says the "building inspector must approve all work before construction can proceed to the next level. All work to be inspected must be accessible and exposed." The plumbing-related stages are:

StageRequest the inspection when
Plumbing (groundwork)The under-floor building drain is installed, shaded and under pressure test, but not covered.
Water piping (groundwork)All under-floor water piping is installed, but not covered.
Building sewerPipes are installed, shaded and properly supported, but not covered.
Water service (from the city meter to the building)Pipes are installed and under pressure, but not covered.
Upper-level drainageTubs are filled to the flood rim.
Rough plumbingAll rough-in plumbing is installed and under pressure test, but not covered.
FinalThe building is completed to the approved plans, specifications and the city codes.

The manual adds that rough electrical, plumbing and heating and ventilation inspections are typically done concurrently, and that the framing inspection happens with plumbing, mechanical and electrical rough-ins in place but not covered. It also says to consult your building inspector for all inspections specific to your project.

What do the terms mean?

  • Groundwork (underground): pipe below the slab or in the ground, inspected before it is covered.
  • Rough-in (topout): pipe inside walls and ceilings, inspected under pressure test before drywall.
  • Shaded: bedded in sand or fine fill, as the manual describes for building drain and sewer pipe.
  • Correction notice: what the inspector issues when the work does not pass.

Which inspection code do you book?

The city's inspections page lists these plumbing and gas codes:

CodeInspection
729U/G Gas
730U/G Water Piping
731Building Drain
732Building Sewer/Tap
733Rough Plumbing/Topout
734Water Service
735Rough Gas Piping Test
736Final Gas Piping Test
741Irrigation Sprinklers
742Water Heater Changeout
745Plumbing Final and Water Meter Verified
746Gas Final

The same list also carries 737 (Haz Mat Gas Systems), 738 (Secondary Cont Piping), 739 (Process Piping), 740 (Roof Drains), 743 (Plumbing Special) and 744 (Plumbing Other). The inspection card issued with your permit lists the codes that apply to your job.

Who does this cover?

It covers any work done under a Chandler plumbing or building permit, whether a homeowner pulls the permit for their own home or a licensed contractor does. The manual is written for homeowners, but the city's inspection codes are the same ones contractors use. Exempt work, such as a like-for-like water heater swap, has no permit and so no permit inspections. When a changeout does need a permit (an upsize, a relocation or new piping), inspection code 742, Water Heater Changeout, is the one you book.

What does this look like in real life?

A bathroom addition. The plumber runs the drain and vent in the wall, pressure tests the rough plumbing, and books code 733 before drywall goes up. The inspector passes it, the wall is closed, and the final inspection (745) happens after the fixtures are set.

A slab job. The under-slab building drain is installed, shaded with bedding and under a pressure test. The plumber books the groundwork inspection before the concrete crew arrives. If the pipe is covered first, the inspector cannot approve what they cannot see.

The edge case: a water service or meter change. Code 745 is named "Plumbing Final and Water Meter Verified," so the final inspection includes the city's meter verification. Ask the inspector what they need at the meter when you book it.

What should you do next? Schedule the inspection

  1. 1Have your permit number and the three-digit inspection code from your inspection card.
  2. 2Book at least one business day ahead, as the manual instructs.
  3. 3Use any of the city's channels: the CLICS portal (chandleraz.gov/clics), the automated phone line at 480-782-3100, or text to 844-281-3520 in the format "s permit-number inspection-code date."
  4. 4Make sure the work is exposed and under test when the inspector arrives.
  5. 5Check the result online, by phone or by text. The inspector either approves the work or issues a correction notice.

What do people get wrong?

  • "I can cover it and call later." The manual requires work to be accessible and exposed for inspection.
  • "One rough-in inspection covers everything." Underground stages, upper-level drainage and water service each have their own request point.
  • "Any code works." Use the code that matches the work, such as 731 for the building drain and 745 for the plumbing final.
  • "The pressure test is the plumber's business." The manual says several stages are inspected under pressure test, so the test must be ready when the inspector shows up.

Chandler can revise its inspection procedures. This page reflects the manual revised April 9, 2026 and the city's inspection page as checked on the date above.

How Do Other Valley Cities Handle It?

WhereWhat appliesSource
PhoenixA rough-in or underground inspection is required for sewer, drainage, vent, water and gas piping before it is buried or concealed, and a final when fixtures are set and operating.Phoenix Building Construction Code 110.3.10.1, item 3
Verified September 29, 2026
GlendaleSame two-stage rule: rough-in or underground inspection before piping is buried or concealed, then a final when all fixtures are set and operating or ready to operate.Glendale City Code 9-17 (IBC 110.3.10.1, item 3)
Verified September 29, 2026

This page explains the rule. The official text at the source above governs.

Sources

Permits and Inspections in Other Cities

More Chandler Codes and Permits

Related Rules and Questions

Questions About Chandler Plumbing Code?

We work to code every day across the Valley. Call the dispatcher and we'll tell you what your project needs.