Tempe charges $1,100 for a six-inch sewer tap in an alley and $1,800 in a local or collector street, both including pavement replacement, and $110 for the machine tap alone. Anyone making their own tap gives 24 hours' notice, pays a $15 inspection fee, and needs a city inspector on site.
“No sewer tap shall be made unless a City inspector is present at the tap site.”
- Applies to:
- Owners, developers, general contractors and plumbing contractors connecting a building to a Tempe city sewer main
- Official fee:
- Sewer tap $1,100 (6-inch alley) or $1,800 (6-inch local or collector street), each including pavement replacement; $110 machine tap only; $15 inspection when you make your own tap
- In force:
- Tempe City Code 27-173, 27-174; Appendix A fee schedule (Res. R2015.123, November 19, 2015)
- Last verified:
- September 29, 2026, against the official page
Tempe prices a sewer tap by where it goes, not by what the building is. A tap in an alley costs less than one in a street, and a contractor who makes the tap themselves pays a small inspection fee instead. The rules sit in two short code sections and the fee schedule behind them.
What does Tempe City Code say about sewer taps?
27-173, city-made taps. Before any sewer tap is made, the "sewer participation charge" computed under Sections 25-81 through 25-100 of the code must be paid to the city. The city then makes individual taps for the fees the City Council sets in Appendix A.
27-174, your own tap. Anyone who wants to make their own sewer tap must notify the Public Works Director at least 24 hours before making it and pay an inspection fee set in Appendix A. "No sewer tap shall be made unless a City inspector is present at the tap site."
27-175, what you own afterward. Once the line is in, the owner keeps it up to and including the tap and saddle. See who owns and repairs the sewer line.
What are the fees?
Appendix A, adopted by Resolution R2015.123 on November 19, 2015, lists these under 27-173 and 27-174:
| Item | Fee |
|---|---|
| Six-inch tap, alley (including pavement replacement) | $1,100.00 |
| Six-inch tap, street: local and collector (including pavement replacement) | $1,800.00 |
| Six-inch tap, street: arterial | Actual cost |
| Four-inch machine tap only | $110.00 |
| Six-inch machine tap only | $110.00 |
| Tap location fee (on file) | $30.00 |
| Tap location fee (not on file) | $100.00 |
| Tap condition fee | $100.00 |
| Dye test, per request | $50.00 |
| Inspection fee when you make your own tap (27-174) | $15.00 |
The schedule adds that taps outside the city are charged at one and a half times these fees. These are the city's official fees, not HQ prices.
What do the key terms mean?
- Tap: the connection of a building sewer to the city main.
- Machine tap only: the schedule lists it apart from the alley and street taps, which include pavement replacement. Our reading is that it covers the cut into the main alone, without the digging and paving.
- Arterial: a major street. The schedule sets no flat fee there, so the charge is the actual cost.
- Sewer participation charge: a separate charge that 27-173(a) says must be paid first, under Sections 25-81 through 25-100. This page does not summarize those sections, so ask Public Works for the current amount.
Who does this cover?
Anyone connecting a new or replacement service to a Tempe city main: owners, developers, general contractors and plumbers. It does not price the plumbing inside the building.
Quick check: what will the tap cost the city side?
| Job | Fee line that applies |
|---|---|
| Commercial building in an alley, city makes the tap | Six-inch alley line |
| Same building on a local street | Six-inch local or collector street line |
| Building on an arterial street | Actual cost |
| Contractor digs and restores, city cuts the main | Machine tap only line |
| Contractor makes the tap | Own-tap inspection line, 24 hours' notice |
| City asks for a dye test | Dye test line |
What does this look like in real life?
A restaurant pad in a local street. The city makes the tap at the local street rate, pavement replacement included. The owner still owes the participation charge before the tap is made.
A plumber who taps the alley main. The contractor gives 24 hours' notice, pays the own-tap inspection fee, and waits for the inspector. If the inspector is not at the tap site, the tap cannot be made.
The edge case: the arterial. A property on a major street gets no flat fee. The charge is actual cost, so the budget has to wait for Public Works.
What should you do next?
- 1Find the size and location of the tap: alley, local street, collector or arterial.
- 2Ask Public Works for the current sewer participation charge before you price the job.
- 3If a contractor will make the tap, give Public Works 24 hours' notice and book the inspector.
- 4Confirm the fee schedule is current. Appendix A here dates from 2015, and Municode may show later amendments.
- 5Keep the receipts. They matter when the owner later asks who owns the line.
What do people get wrong?
- "The $1,100 is the whole cost of connecting." It is the city's tap fee. It does not include the participation charge or your plumbing.
- "I can tap it myself and skip the inspector." 27-174 says no tap is made without a city inspector on site.
- "Every city posts one fee." Chandler's section sets a permit requirement and no fee, and Glendale's requires a permit and street restoration.
- "An arterial costs the same as a local street." The schedule lists actual cost for an arterial.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Chandler | No tap fee is set in the code section. It is unlawful to tap, uncover or disturb the public sewer without first getting a written permit from the City Engineer. | Chandler City Code 51-7 Verified September 29, 2026 |
| Glendale | Tapping a city water or sewer line, or digging a street or alley to connect to one, needs a city permit first, and the street must be put back in its original condition. Interfering is a Class 1 misdemeanor. | Glendale City Code 33-16 Verified September 29, 2026 |
This page explains the rule. The official text at the source above governs.
Sewer Lines in Other Cities
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
- ChandlerChandler sewer line responsibility: who repairs the pipe to the main
- ChandlerChandler sewer tap permit: what 51-7 and the street permit require
- GlendaleGlendale City Code 33-217: who repairs the sewer line from the building to the street
- PhoenixWho pays to extend a sewer main in Phoenix?
- PhoenixDo you need a permit to connect to or work on a public sewer in Phoenix?
More Tempe Codes and Permits
- Sewer LinesTempe City Code 27-175: who owns and repairs the sewer line, even under the street?
- Backflow PreventionStolen or moved backflow assembly in Tempe: replacement and permit
- Commercial PlumbingTempe City Code 27-22: grease traps, interceptors and the garbage disposal ban
- Backflow PreventionTempe City Code 33-103 and 33-104: backflow assemblies on plans and how to install them
- Backflow PreventionTempe City Code 33-105: which commercial properties need a backflow assembly?
- Backflow PreventionTempe City Code 33-107: backflow assemblies must be tested every year
Related Rules and Questions
- TempeTempe water tap and development fees by meter size for commercial service
- UPCUPC Section 720: The Required Gap Between Water and Sewer Lines
- Valley-WideRight-of-Way Permits for Plumbing Work by Valley City
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- Valley-WidePavement Cut and Street Restoration Rules by Valley City
- FAQHow much is the sewer connection fee for a new home in Phoenix?
- FAQDo I need a permit to dig in the street right-of-way to fix my sewer or water line in Phoenix?
- FAQWhat factors affect the cost of replacing a sewer line?
- Sewer Repair & Installation