Under Litchfield Park City Code 7-16-1, no one may construct, repair or alter anything in the public right-of-way without a permit from the Public Works director. The application needs the licensed contractor's name and license number, plans, and a traffic control plan. Plan review and inspection fees are paid before the permit is issued.
“It shall be unlawful for any person or entity to construct, reconstruct, repair, alter, or grade within the public rights-of-way without first obtaining a permit from the director.”
- Applies to:
- Contractors and owners doing plumbing, sewer or water work that reaches into a Litchfield Park street or other public right-of-way
- Official fee:
- plan review and inspection fees set by council resolution (7-16-4)
- In force:
- Litchfield Park City Code Ch. 7, Art. 7-16 (Ord. 19-240, 2019)
- Last verified:
- October 4, 2026, against the official page
A plumbing job in Litchfield Park may reach a public right-of-way before it reaches the pavement. Once a trench, bore or tap enters that right-of-way, a separate city permit applies, and the code spells out what the application must include.
What does Litchfield Park City Code 7-16-1 say?
Subsection B is the rule: "It shall be unlawful for any person or entity to construct, reconstruct, repair, alter, or grade within the public rights-of-way without first obtaining a permit from the director." The director is the director of the public works department, and "public right-of-way" means right-of-way dedicated to the public for roadway or other public purpose.
Subsection C lists what the application must show: the name, address and license number of the party doing the work, the location of the work area, plans (sealed by a state-registered engineer unless the city agrees the work does not warrant it), a traffic control plan, and the estimated cost. Subsection D says the permit includes a completion date, which the director may extend for good cause.
Subsection E lets the director require evidence of general liability and automobile insurance naming the city as additional insured, and a letter of credit based on the estimated cost. Subsection F requires at least 24 hours' notice to the director before work starts.
What do the key terms mean?
- Public right-of-way: land dedicated to the public for streets or other public purposes. A sewer or water tap under the street is inside it.
- Director: the public works director, who issues the permit.
- Traffic control plan: under Sec. 7-16-2 it must be submitted at least two business days before the start date and designed by a certified member of the American Traffic Safety Services Association (ATSSA). No work starts until the director approves it.
- Letter of credit: security the city can draw on to finish work the permittee does not complete (Sec. 7-16-3).
Who does this cover?
Anyone who builds, repairs, alters or grades within a Litchfield Park public right-of-way: plumbing contractors, utilities and owners. It does not cover work that stays on private property, which follows the ordinary building permit process. The article also carries rules for wireless facilities, which are not covered here.
Quick check: what does the street permit require?
| Item | Requirement | Section |
|---|---|---|
| Permit before work in the right-of-way | Yes, from the Public Works director | 7-16-1(B) |
| Contractor name and license number on application | Yes | 7-16-1(C) |
| Plans | Yes, engineer-sealed unless the city waives | 7-16-1(C) |
| Traffic control plan | Yes, ATSSA-certified designer, two business days ahead | 7-16-2(A) |
| Insurance and letter of credit | May be required by the director | 7-16-1(E) |
| Notice before starting | At least 24 hours | 7-16-1(F) |
| Fees | Plan review and inspection, paid before issuance | 7-16-4(A) |
| After the work | Final inspection and restoration | 7-16-3(B) |
What does this look like in real life?
A sewer tap for a new commercial building. The tap is under the street. The contractor files the application with plans and a traffic control plan, pays the plan review and inspection fees, and gives 24 hours' notice before digging.
A broken lateral entirely outside the right-of-way. The plans and boundary information confirm the repair stays on private property with no public right-of-way affected. This right-of-way permit does not apply, though ordinary building permit rules still do. The curb alone does not establish the boundary.
The edge case: a utility working for a customer. When a utility does the work for a customer, the customer pays the plan review and inspection fees unless the utility says it will. The permit is issued to the utility, which is the permittee.
What should you do next?
- 1Locate the work relative to the property line and the street edge. If any digging reaches the right-of-way, this permit applies.
- 2Hire a licensed contractor. The application needs the contractor's name, address and license number.
- 3Get plans prepared. Ask the city early whether it will waive the engineer seal for a small job.
- 4Arrange a traffic control plan from an ATSSA-certified designer and submit it at least two business days ahead.
- 5Use the city's Permits and Applications Portal to obtain the current application process and Public Works contact details.
- 6Pay the plan review and inspection fees, then give the director 24 hours' notice before work starts.
- 7Request the final inspection and restore the right-of-way when the work is done.
What do people get wrong?
- "A plumbing permit covers the street." The right-of-way permit is separate and comes from the Public Works director.
- "Traffic control is optional on a small dig." The application must include a traffic control plan, and work cannot start until it is approved.
- "The city will fix my restoration later." The permittee restores the right-of-way at its own expense and must reimburse the city for any damage.
- "Every city sends this to the same office." Mesa sends its street-dig permit to the City Engineer.
Full text and source
The rules are Litchfield Park City Code Secs. 7-16-1 through 7-16-4 on Municode. The article is short, so read it yourself. The fee amounts are set by council resolution and are not in the code. The city's answer for your project, not this summary, decides a real dispute.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Mesa | It is unlawful to dig up a street or alley to connect to the sewer without first getting a permit from the City Engineer, or to leave it unrestored afterward. | Mesa City Code 8-4-4 Verified September 28, 2026 |
| Scottsdale | No excavation in a street, alley or right-of-way to connect to the sewer without complying with the city's right-of-way permit article, and the street must be restored to its original condition. | Scottsdale Revised Code 49-115 Verified September 28, 2026 |
This page explains the rule. The official text at the source above governs.
- Litchfield Park City Code Sec. 7-16-1, Permit required (Municode)
- Litchfield Park City Code Sec. 7-16-2, Traffic control (Municode)
- Litchfield Park City Code Sec. 7-16-3, Prosecution and completion of the work (Municode)
- Litchfield Park City Code Sec. 7-16-4, Fees (Municode)
- Litchfield Park Permits and Applications Portal
- Mesa City Code 8-4-4, Digging up streets or alleys to connect to the sewer (Municode)
- Scottsdale Revised Code Sec. 49-115, Excavation to connect to city sewer (Municode)
Sewer Lines in Other Cities
- Fountain HillsWhen does Fountain Hills require a sewer easement encroachment permit?
- GlendaleGlendale City Code 33-126 to 33-129: sewer tap permit and who digs
- Paradise ValleyWhat permit does Paradise Valley require to connect to the sewer?
- PhoenixDo you need a separate permit for a water or sewer tap in Phoenix?
- SurpriseSurprise City Code 58-425 and 58-218: permits to dig for sewer and water lines
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
Related Rules and Questions
- Valley-WideRight-of-Way Permits for Plumbing Work by Valley City
- Valley-WidePavement Cut and Street Restoration Rules by Valley City
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- FAQDo I need a permit to dig in the street right-of-way to fix my sewer or water line in Phoenix?
- FAQUtility easement vs right-of-way: who can dig to fix my sewer?
- FAQTrenchless sewer repair vs digging: what's the difference?
- Sewer Repair & Installation