Paradise Valley requires a permit from the Town Engineer to uncover, connect to, alter or disturb a public sewer, and a permit before anyone digs up a street, alley or right-of-way to connect. The street must be restored. A building connection application also needs a valid Town plumbing permit first.
“No person, corporation or firm shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer or appurtenances thereof without first obtaining a permit from the Town Engineer.”
- Applies to:
- Plumbing and excavation contractors, owners and developers connecting a building to the public sewer in Paradise Valley
- Official fee:
- Connections built by Public Works must be accompanied by the current fee (15-2-10); amounts are in the Town fee schedule and are not repeated here
- In force:
- Paradise Valley Town Code Sec. 15-2-5 and 15-2-10
- Last verified:
- October 4, 2026, against the official page
Connecting a building to the sewer in Paradise Valley takes two permits that people often mix up: one from the Town Engineer for the sewer itself, and a plumbing permit from the Building Official. The street work adds a third.
What do Secs. 15-2-5 and 15-2-10 say?
Section 15-2-5 has two prohibitions:
- (A) Digging: no person, corporation or firm may dig up a street, alley or right-of-way under the Town's jurisdiction to connect with the Town sewer system without a permit from the Town Engineer. Anyone with a permit who digs must restore the street, alley or right-of-way to its original condition.
- (B) The sewer itself: no one may uncover, connect to, open into, use, alter or disturb any public sewer or its appurtenances without a permit from the Town Engineer.
Section 15-2-10 covers the building connection application. The applicant presents a valid plumbing permit, issued by the Town Building Official or an authorized representative, to the Town Engineer. The plumbing permit is a prerequisite for approval of the building connection. Applications for building connections built by Public Works must come with the current fee for that work.
New subdivisions work differently. Under Sec. 15-2-6, where the Town Engineer has authorized public sewer extensions built at the subdivider's expense, the Engineer may let the subdivider or an agent install building connections with wyes and connect the building sewers. The work must be supervised by an Arizona registered civil engineer, who submits as-built plans with the registration number and seal to the Town Engineer. Connections serving lots with no building yet must be effectively sealed until a building goes up.
The right-of-way itself has its own permit in Sec. 5-10-1, explained on our right-of-way permit page.
What do the key terms mean?
- Public sewer and appurtenances: the Town's sewer main and things attached to it, such as manholes and wyes. Touching any of them needs the permit.
- Building connection: the pipe that ties a building's sewer to the public sewer. Section 15-2-10 treats approval of the connection as a separate step from the plumbing permit.
- Town Engineer versus Building Official: the Town Engineer approves the connection and digging. The Building Official issues the plumbing permit that the Engineer's approval depends on.
Who does this cover?
Owners, developers and their contractors who connect to, or repair at, the public sewer. It does not decide who owns the lateral or who pays for repairs, and Paradise Valley's code sections read for this page do not either. Many Paradise Valley properties are on septic and not on sewer at all, and a septic system follows different permits.
Quick check: which permits does your connection need?
| Step | Permit | Source |
|---|---|---|
| Any work that uncovers or connects to a public sewer | Permit from the Town Engineer | 15-2-5(B) |
| Digging in a street, alley or right-of-way | Permit from the Town Engineer, then restore the street | 15-2-5(A) |
| Work on the right-of-way surface, on, over or under it | Right-of-way permit | 5-10-1 |
| The building connection application | Valid plumbing permit from the Building Official first | 15-2-10 |
| Connection built by Public Works | Current fee with the application | 15-2-10 |
What does this look like in real life?
A new office building. The plumbing contractor pulls the plumbing permit from the Building Official, presents it to the Town Engineer with the connection application, and receives the sewer permit. The street trench also needs the right-of-way permit.
A repair at the tap. A failed connection at the main means uncovering the public sewer appurtenance, and that needs the Town Engineer's permit even for a repair.
The edge case: the street is not restored. A contractor who digs under a permit and leaves the pavement rough is violating 15-2-5(A). The restoration duty is part of the same sentence as the permit.
What should you do next?
- 1Confirm you are on the Town sewer and not septic. If unsure, ask Town permitting and the sewer utility serving the property.
- 2Ask Town permitting for the current plumbing permit process and apply first.
- 3Bring that permit with your connection application to the Town Engineer.
- 4Ask your contractor to pull the right-of-way permit before any street work.
- 5Plan the restoration of the street, alley or right-of-way in the contract.
What do people get wrong?
- "The plumbing permit lets us tap the sewer." It is a prerequisite. The Town Engineer's approval is a separate step.
- "A repair does not need a permit." Uncovering or disturbing a public sewer or appurtenance does.
- "Restoration is optional." The code makes leaving the street unrestored a violation.
This page summarizes the code. The adopted text on Municode governs.
How Do Other Valley Cities Handle It?
| Where | What applies | Source |
|---|---|---|
| Scottsdale | Excavating in a street, alley or right-of-way to connect to the sewer must follow the Chapter 47 right-of-way permit rules, and the street must be restored. Tapping into or extending a public sewer also needs an encroachment permit before work starts. | Scottsdale Revised Code Sec. 49-115 and 49-122 Verified October 4, 2026 |
| Mesa | A written permit from Development Services to connect to or disturb a public sewer, and a valid plumbing permit as a prerequisite for the building connection. The connection location, manner and size are subject to the Development Services Manager's approval. | Mesa City Code 8-4-8 Verified October 4, 2026 |
This page explains the rule. The official text at the source above governs.
Sewer Lines in Other Cities
- Fountain HillsWhen does Fountain Hills require a sewer easement encroachment permit?
- GlendaleGlendale City Code 33-126 to 33-129: sewer tap permit and who digs
- Litchfield ParkLitchfield Park City Code 7-16-1: right-of-way permit for plumbing work in the street
- PhoenixDo you need a separate permit for a water or sewer tap in Phoenix?
- SurpriseSurprise City Code 58-425 and 58-218: permits to dig for sewer and water lines
- ChandlerDo you have to connect to Chandler city sewer if you have a septic tank? City Code 51-3
More Paradise Valley Codes and Permits
Related Rules and Questions
- ScottsdaleWhat permit does Scottsdale require to dig a street to connect to the sewer?
- ScottsdaleWho owns and repairs the sewer lateral in Scottsdale?
- Valley-WideRight-of-Way Permits for Plumbing Work by Valley City
- Valley-WideWho Owns the Sewer Line From the Building to the Main, by City
- FAQHow much is the sewer connection fee for a new home in Phoenix?
- FAQDo I have to connect to the city sewer in Phoenix, or can I keep my septic?
- FAQIn Phoenix, who is responsible for the sewer line to the city main?
- Sewer Repair & Installation
- Commercial Plumbing