Shower Installation in Phoenix
Shower installation done to the Phoenix code: the drain, the valve and the base or pan, tested before anything covers them, with a free estimate and the price first.
Shower installation in Phoenix means setting the drain, the shower valve and the base or pan so the finished shower drains, holds its temperature and stays watertight. HQ Plumbing & Air installs showers and repairs shower valves, fixtures and drains across the Valley, with a free estimate and an upfront price before work starts.
The rules that apply
Each rule links to the official text we read it from. Cities change these, so check the source before a big decision. Last checked 2026-11-21.
A home shower has a minimum size
PhoenixA shower compartment needs at least 900 square inches of interior area and at least 30 inches in its smallest dimension, held to 70 inches above the drain, with a finished entry at least 22 inches wide. A 25-inch minimum is allowed when the area is at least 1,300 square inches. Hinged shower doors open outward.
Source: Phoenix Residential Code 2024, Sec. P2708.1 and P2708.1.1The valve is capped at 120 degrees
PhoenixA shower valve must be rated for the flow of the showerhead installed and have a way to limit its maximum setting to 120 degrees F. An in-line thermostatic valve does not count.
Source: Phoenix Residential Code 2024, Sec. P2708.4A built pan is lined, sloped and flood tested
PhoenixThe floor slopes at least 1/4 inch per foot to a flanged drain with weep holes. The liner runs at least 2 inches above the finished threshold, and the pan holds 2 inches of water for 15 minutes with no leak before it is covered.
Source: Phoenix Residential Code 2024, Sec. P2709 and P2503.6Also: Phoenix Residential Code 2024, Sec. P2503.6 (shower liner test)Moving the drain or valve takes a permit
PhoenixReplacing a valve or fixture with a new one that meets the water conservation rules needs no permit, but relocating any valve, pipe or fixture does. A tub-to-shower conversion that moves the drain is permit work.
Source: Phoenix amendment to 2024 IBC Chapter 1, Sec. 105.2 (plumbing item 3)What a shower installation includes
The parts you see are the tile, the glass and the trim. The parts that decide whether the shower works are behind the wall and under the floor. That is the plumbing, and it is the part a licensed plumber installs:
- The drain. A shower drain needs an outlet of at least 1-1/2 inches. Its spot in the floor has to line up with the base or pan, and the trap under it has to meet the trap and vent rules.
- The shower valve. A pressure-balancing or thermostatic valve, rated for the showerhead you pick and set so it cannot go past 120 degrees F. See pressure-balancing versus thermostatic shower valves.
- The supply lines and riser. Hot and cold lines to the valve, and a riser from the valve to the showerhead, strapped to the framing.
- The base or the pan. Either a prefab base set level and sealed to the drain, or a pan built on site with a waterproof liner.
- The test. A built pan is flood tested before anything covers it, and every joint is checked with the water on.
If you are changing the layout, the drain and valve positions come first. Everything after that is built around them.
Shower base or built pan?
A prefab base is the faster route when the shower is a standard size. Kohler's base instructions say to install the drain with a watertight seal, make sure the base is level and fully supported by the subfloor, shim it with metal shims where needed, and seal the joints with silicone. A base that rocks or sags is a base that leaks later.
A built pan fits any size or shape, including curbless and walk-in layouts. It is a sloped mortar bed over a waterproof liner, or a bonded membrane system, draining to a flanged drain with weep holes. The code wants the floor sloped at least 1/4 inch per foot to the drain, the liner turned up at least 2 inches above the threshold, and a flood test of 2 inches of water held for 15 minutes before the tile goes on. Our guides on how to install a shower pan and shower pan liner code walk through each layer.
Either one works. Pick the base for speed on a standard footprint, and the built pan for a custom size or a low or no curb.
How big does a new shower have to be?
For a house, the Phoenix Residential Code asks for at least 900 square inches of interior area and at least 30 inches in each direction, with an entry at least 22 inches wide. A 30 by 30 inch stall just makes it. That size has to hold from the threshold up to 70 inches above the drain, so a fixed bench, knee wall or sloped ceiling cannot cut into the required space. In a narrow alcove, a shower can be as little as 25 inches across if its area is at least 1,300 square inches, such as 25 by 52 inches. Measure the finished space, inside the tile and backer board, not the framing. Our page on the minimum shower size by code walks through each of these numbers.
Turning a tub into a shower
A 60 by 30 inch alcove tub, by its nominal size, covers about 1,800 square inches, which is plenty of room for a shower. The work is mostly plumbing:
- 1Take out the tub and the wall finish around it.
- 2Move the drain from the end of the tub to where the shower base drains, and fit the trap to it. In a slab-on-grade Phoenix home that means cutting the concrete at the drain.
- 3Replace the valve. The tub spout and diverter become a shower-only valve, or a new combination valve.
- 4Set the base or build the pan, then waterproof the walls.
- 5Test it and get it inspected.
Because the drain moves, a conversion is permit work in Phoenix. Our page on what is involved in converting a tub to a shower covers the drain sizing and valve rules in detail, and whether a fixture can move to a new spot covers the slab.
What goes behind shower walls?
Cement board or another moisture-resistant backer, with a waterproofing layer over it. The U.S. Department of Energy's Building America guide gives the reason: cement board resists water, but it is not waterproof on its own. Plain drywall and green board are not recommended behind tile in a wet area. Every pipe and valve opening through the wall gets sealed too. More in what goes behind tile around a bathtub.
How long does a shower installation take?
It depends on three things: whether the drain moves, whether the floor is a prefab base or a built pan, and whether a permit inspection sits in the middle. A new valve and base on the existing drain is the short job. A built pan adds a flood test that has to pass before tile, and a moved drain adds cutting the slab and an inspection. Ask for the schedule with your estimate, so you know which visits to plan for.
What sets the price of a new shower?
We do not publish prices, because no two showers are the same job. The price is set by:
- whether the drain or valve has to move, and how far;
- a prefab base or a built pan, and the size and shape;
- the valve type and how many outlets it runs (a rain head plus a hand shower, body sprays);
- how much wall and floor has to come out to reach the pipes;
- whether a permit and inspection apply.
You get a free estimate and an upfront price before any work starts. No hidden fees.
Why call HQ for a shower installation
- Licensed, bonded and insured, Arizona ROC #355170.
- A two-year warranty on our workmanship, not covering pipe failures. The valve, base and fixtures carry their makers' warranties, usually one year.
- Free estimates and upfront pricing, with no hidden fees.
- Family owned, founded by Steve Herzog.
Already have a shower that leaks, drips or runs cold? That is repair work, and we do that too: start with the most common shower problems and their fixes, or a shower valve leaking behind the wall. We work across Phoenix, Scottsdale, Tempe, Mesa, Chandler, Glendale, Paradise Valley and the rest of the Valley.
How to book
Call (602) 675-1555 or request service online. Tell us whether it is a new shower, a replacement or a tub-to-shower conversion, the size of the space, and whether you want the drain or valve in a new spot.
Codes and permits
Do I need a permit to install a shower in Phoenix?
Swapping a valve or fixture for a new one in the same place needs no permit in Phoenix. Moving any valve, pipe or fixture does, so a new shower in a new spot, or a tub-to-shower conversion that moves the drain, is permit work with an inspection.
How hot can a new shower valve get?
The code requires every shower valve to have a way to limit its maximum setting to 120 degrees F, and the valve has to be rated for the flow of the showerhead installed. The limit is set at install, following the valve maker's instructions.
Is a prefab shower base or a tile pan better?
A prefab base is quicker on a standard size and only needs a level, supported floor and a sealed drain. A built tile pan fits any size or shape, including low-curb and curbless showers, and has to pass a 15-minute flood test before it is covered.
Can you put a shower where there was a tub?
Yes. A 60 by 30 inch alcove tub, by its nominal size, covers about 1,800 square inches, which is plenty of room for a shower. The drain moves to where the shower base drains, the tub valve becomes a shower valve, and the floor and walls are waterproofed. In Phoenix that is permit work because the drain moves.
What is involved in converting a tub to a shower?
The plumbing work is a new drain position for a shower base or pan, a shower valve rated for the showerhead and limited to 120 degrees F, a waterproof floor and walls, and usually a permit because the drain and valve move. The size, drain and waterproofing rules decide the job.
Read full answer: What is involved in converting a tub to a shower?What does code require for a shower pan and liner?
Code requires a waterproof pan or liner under the tile, a floor sloped about 1/4 inch per foot to the drain, the liner turned up the sides above the curb (at least 2 inches under the IPC, at least 3 inches under the UPC), a weep-hole drain, and a water test of any new pan before tiling.
Read full answer: What does code require for a shower pan and liner?How do I install a shower pan?
Set the drain, build or set a base that slopes about 1/4 inch per foot to it, waterproof the floor with a liner, membrane or prefab base, then flood test before any tile goes on. A prefab base over existing plumbing is a fair DIY job. Moving the drain needs a plumber and a permit.
Read full answer: How do I install a shower pan?How do I install or replace a shower drain?
Match the drain to the base, waterproofing system and pipe. Preformed bases can use different listed drains; tile showers may use a clamping-ring liner or a bonded waterproofing drain. Follow that system's sealant, gasket, access and testing instructions. Do not replace one style with another based only on the floor material.
Read full answer: How do I install or replace a shower drain?Pressure-balancing vs thermostatic shower valve: which?
A pressure-balancing valve keeps the hot-to-cold ratio steady when pressure changes, so a flush won't scald you. A thermostatic valve reads the water's actual temperature and holds a set point, with separate volume control. Both meet code (ASSE 1016). Pressure-balancing costs less; thermostatic gives tighter, preset temperature.
Read full answer: Pressure-balancing vs thermostatic shower valve: which?How do I know if my shower valve is leaking behind the wall?
Watch for a damp or stained wall or ceiling near the shower, peeling paint, a musty smell, low pressure, or water running inside the wall with everything off. Moen's rule: if water leaks when the shower is off, the cartridge is the likely cause. Shut off the valve stops and call a plumber.
Read full answer: How do I know if my shower valve is leaking behind the wall?Sources
- Phoenix Residential Code 2024, Chapter 27: Plumbing Fixtures (UpCodes)
- Phoenix Residential Code 2024, Chapter 25: Plumbing Administration (UpCodes)
- City of Phoenix: Amendments to 2024 IBC Chapter 1, Sec. 105.2 Work Exempt from Permit
- U.S. DOE Building America: Cement Board Installed behind Tile and Panel Tub and Shower Enclosures
- Kohler: Shower Base Installation Instructions
Related services
Full-service commercial plumbing for restaurants, offices, warehouses and multi-unit buildings across the Valley, 24/7 for emergencies.
How a Phoenix leak gets found and fixed, who owns which side of the meter, and how a January leak raises a year of sewer bills.
How a slab leak gets found without guessing, when to repair in place or reroute overhead, the Phoenix permit line, and who pays.
What a camera run proves under Phoenix City Code 28-5, which repairs need a permit and inspection, and when to skip the camera.
Where the city's pipe ends, the galvanized replacement program, Phoenix's pressure and pipe rules, and how a repair gets permitted.
When to replace instead of repair, tank or tankless, the Phoenix permit rule for in-kind swaps, and what a code-correct install includes.
Who clears what in Phoenix, why grease and roots cause most backups here, and how to stop paying for the same clog twice.
Planning a New Shower?
Talk to a real dispatcher. Upfront pricing before work starts, 24/7 for emergencies.

