Keep a required restaurant handwashing sink accessible and usable; a prep sink, warewashing sink or sanitizer bottle is not an automatic substitute. Identify the affected workstation and contact Maricopa County Environmental Services about safe operation. Stop affected operations when an imminent health hazard may exist, and obtain required approval before resuming discontinued work.
A required handwashing sink must work where staff need it. If it stops delivering water, will not drain or cannot be used safely, identify the affected workstation and arrange repair. Keep staff from using a backed-up sink or redirecting handwashing to food-preparation equipment without approval. For restaurant and business sinks, see trap, supply or stop leaks under a commercial sink.
Maricopa County adopts FDA Food Code 2017. Section 5-205.11 requires a handwashing sink to remain accessible at all times for employee use and prohibits using it for other purposes. Section 5-203.11 addresses the number necessary for convenient use. A working sink elsewhere does not automatically satisfy the affected station's needs.
What about a nearby prep or three-compartment sink?
Those sinks have their own uses and contamination controls. Moving employees to them is not the same as providing an approved handwashing facility. The county's current food-establishment guide calls for hand sinks centrally located, visible and directly accessible, approximately 25 feet from food and beverage workstations.
Hand-sink placement explains the layout requirement. The restaurant health-inspection guide covers accessibility, supplies and plumbing protection. Use the hot-water failure checklist when the sink works mechanically but receives inadequate hot water.
When should operations stop and resume?
Food Code Section 8-404.11 requires discontinued operations and notification when an imminent health hazard may exist. An unaffected area can remain operating under its stated exception; the authority should assess the actual operation rather than a manager treating every station as unaffected.
Keep the repair findings and verify the sink works for its required use. Section 8-404.12 requires approval before resuming operations discontinued under the hazard rule or law. A sewage backup also needs contamination control after the drain repair. If the work changes the installation, check the county plan-review requirements separately.
A hand sink that is only slow, not dead, usually has a local clog; see why a hand sink or mop sink drains slowly in a commercial kitchen.
Need a plumber for this?
Call and a real dispatcher picks up, day or night, or send us the details online. For restaurants, offices and rental properties, we schedule the work around your hours.
- 24/7 emergency service
- Licensed and insured
- Upfront pricing
- Free estimates
