Sewer Pipe Lining (CIPP) in Phoenix
A liner copies the pipe it goes into. We check the pipe on camera first and tell you honestly whether lining or a new pipe is the better buy.
Sewer pipe lining (CIPP) puts a resin-soaked liner inside the old pipe and cures it into a new pipe. HQ offers it for lines that qualify, but the code bars it where the video shows bad slope or complete separations, and we usually recommend excavation. Under the 2024 IPC, the city reviews your camera video before a permit is issued.
The rules that apply
Each rule links to the official text we read it from. Cities change these, so check the source before a big decision. Last checked 2026-10-11.
Size and sameness
Phoenix (2024 IPC)Section 717.2 limits relining of building sewers and drainage piping to gravity piping 4 inches and larger. The relined pipe keeps the same nominal size as the existing pipe.
Source: 2024 IPC Sec. 717.2, as accepted in PhoenixClean, flush, then film
Phoenix (2024 IPC)The pipe is descaled and cleaned, water is flushed through it, and a recorded video survey follows. The video must verify the address, note cleanouts and fittings and approximate depth, and note the length of piping at intervals no greater than 25 feet.
Source: 2024 IPC Sec. 717.3 and 717.3.1The city reviews the video before the permit
Phoenix (2024 IPC)Before the permit is issued, the code official reviews and evaluates the pre-installation video to decide whether the pipe can be relined under the liner maker's installation requirements and the referenced standards.
Source: 2024 IPC Sec. 717.4Relining is not permitted over defects
Phoenix (2024 IPC)If the video shows piping not installed correctly or defects, relining is not permitted. The defective portions are exposed and repaired with pipe and fittings under the code. Defects include backgrade or insufficient slope, complete pipe wall deterioration and complete separations.
Source: 2024 IPC Sec. 717.5Liner materials and installation
Phoenix (2024 IPC)Fold-and-form liner material must meet ASTM F1504 or ASTM F1871, and installation follows the manufacturer's instructions, the referenced standards and the code. Section 718.1 points cured-in-place sectional repairs to ASTM F2599 and main-and-lateral repairs to ASTM F2561.
Source: 2024 IPC Secs. 717.6, 717.7 and 718.1Records before final approval
Phoenix (2024 IPC)The installer records the project location, liner type, amount installed and installation conditions, and gives the code official a copy before final approval. A flushed and flow-tested post-installation video also goes to the official, and the permit holder gives a written certification that the work followed the instructions, the standards and the code.
Source: 2024 IPC Secs. 717.7.1, 717.8 and 717.9No Phoenix amendment to these sections
PhoenixThe City of Phoenix amendments to the 2024 IPC change Chapter 7 only at Section 704.1, so Sections 717 and 718 apply as written. Phoenix also accepts the Uniform Plumbing Code, so ask which code your permit is under.
Source: City of Phoenix amendments to the 2024 IPCAlso: Phoenix PBCC, IBC Ch. 1 Sec. 101.4.3 (UPC or IPC applies, as amended)Buried replacement is permitted work
PhoenixRemoving and replacing defective concealed drain pipe is new work that needs a permit. Clearing stoppages and stopping leaks do not.
Source: Phoenix PBCC, IBC Ch. 1 Sec. 105.2What is sewer pipe lining?
Lining installs a new pipe inside the old one. Cured-in-place pipe (CIPP) is the common method. EPA describes it as a flexible fabric liner coated with thermosetting resin, inserted into the existing pipe and cured to form a new liner. The liner is pressed against the pipe wall with water or air pressure, and heat cures the resin. It can address cracks, offset joints and weak segments, and EPA says the resin bonds with the existing pipe to form a tighter seal than most other trenchless techniques.
That is the good news. The rest of this page is what the code and EPA say you should check before you buy it.
What does the code require before a pipe is lined?
A clean pipe, a recorded video and the city's review, in that order. Section 717 of the 2024 IPC, which Phoenix accepts, starts with descaling and cleaning the pipe and flushing it with water. A recorded video survey then confirms the address and notes cleanouts, fittings, depth and the length of piping every 25 feet or less. Before the permit is issued, the code official watches that video to decide whether the pipe can be relined under the manufacturer's requirements. Phoenix's amendments do not change this section.
If anyone offers to line your sewer without that video or without a permit, they are not following the section. Our guide to jetting before lining explains why the cleaning step matters, and what the code says about trenchless repair goes through each subsection.
What can a liner not fix?
Slope, separations and collapsed wall. Section 717.5 says relining is not permitted where the video shows backgrade or insufficient slope, complete pipe wall deterioration or complete separations such as from tree root invasion or improper support. The defective portions have to be exposed and repaired first.
Put simply, a liner follows the shape of the pipe. If the pipe has a belly that holds water, the liner holds water. If a joint has separated and soil is washing in, the liner has nothing solid to bond to. Our guides to a belly in the sewer line, an offset joint and Orangeburg pipe on camera show what the camera looks for.
What do you give up when a pipe is lined?
Some pipe diameter, and some visibility. EPA lists reduced pipe diameter as a drawback of lining. The code still requires the same nominal size, but the inside of the pipe is smaller than before. Every branch connection also has to be reopened. EPA says laterals are typically reinstated with robotic cutting devices working from inside the pipe, and that liners often show dimples where laterals sit. And EPA's limitation list includes bypass or diversion of flow during installation, curing time that can be hard to manage on long segments, and a defective installation that "may be difficult to rectify."
That last point is why we lean toward digging. A trench lets the inspector see the pipe, the bed and the joints before backfill, and a failed repair in a trench can be fixed where everyone can see it. A failed liner usually ends up in a trench anyway.
Why does HQ recommend excavation first?
Because we build every sewer to code and want it inspected in the open. We offer lining. We recommend digging for most lines. If the line is a good candidate, we will say so, quote it and pull the permit. If the line is a bad one, we will say that too, and we would rather tell you before you spend money. HQ holds an Arizona A-12 license for sewers, drains and pipe laying, and a dug and replaced sewer gets a permit, an underground inspection and a water test before it is covered. For the full comparison, see trenchless sewer repair and trenchless repair versus digging.
What about the Uniform Plumbing Code?
The IPC text above is the most specific, and the UPC says less about lining. Phoenix accepts both codes. In December 2025 IAPMO's Standards Council ruled that the 2027 UPC will not include language for drain piping rehabilitation for building drains, and sent that work to a task group for the 2030 cycle. Its only accepted change added ASTM F3541 to the existing sewer-lining clause, UPC 715.3.1. So ask the city which code your permit is under and what it wants to see. We handle that conversation for you.
What paperwork should you end up with?
The pre-installation video, the installer's data report, the post-installation video, the written certification and the permit sign-off. Keep all of them; a buyer or a lender may ask for them later. Our page on getting a copy of your sewer inspection video covers the video.
When is lining the wrong answer?
When the camera shows bad slope, a complete separation, a collapse, a pipe under 4 inches, or no video at all. Lining is also the wrong answer when the actual problem is a clog or grease; see hydro jetting. If you are unsure, start with a sewer camera inspection and decide after you see the pipe.
How do you start?
Call with your address, your city and any video you have. HQ offers 24/7 emergency service for backups, free estimates and upfront pricing before work starts. See also sewer repair and pipe bursting.
Is trenchless sewer repair allowed by plumbing code?
Yes. The 2024 IPC accepted in Phoenix includes pipe bursting, relining and cured-in-place repair. Sections 716 and 717 require recorded camera surveys for bursting and relining; Section 718 specifies standards for cured-in-place repairs. Defective pipe can require excavation first. Confirm the applicable code and permit requirements.
Read full answer: Is trenchless sewer repair allowed by plumbing code?Why must pipe be jetted before it is lined?
Pipe is jetted or descaled before it is lined because the liner needs a clean, unobstructed host pipe so it can fit and be installed correctly. Some coating or lining systems also require adhesion. Grease, scale, roots, and debris leave gaps, wrinkles, and weak spots. Cleaning also clears obstructions and lets the camera see the pipe. Industry lining specifications require cleaning and video first.
Read full answer: Why must pipe be jetted before it is lined?Full reline, partial reline, or nothing for my sewer line?
Let the camera decide. Do nothing if the pipe is round, tight and mostly clear. Spot-line one isolated crack or root-filled joint. Reline the whole run when defects repeat along it. A liner cannot fix a collapsed or badly shifted pipe, so that needs replacement.
Read full answer: Full reline, partial reline, or nothing for my sewer line?Pipe bursting vs pipe lining: which sewer repair do I need?
Choose pipe lining (CIPP) when the old sewer pipe is still mostly intact, since a resin liner cures inside it to form a new pipe. Choose pipe bursting when the pipe is collapsed, badly broken, or needs upsizing. A camera inspection decides which fits.
Read full answer: Pipe bursting vs pipe lining: which sewer repair do I need?What does a belly in a sewer line mean?
A belly, or sag, is a low spot where the sewer pipe has lost its slope and holds water. It's usually a problem only if debris settles there and builds up into backups. Seattle's utility calls a sag under 25 percent of the pipe diameter minor, and 50 percent or more severe.
Read full answer: What does a belly in a sewer line mean?What does Orangeburg pipe look like on a sewer camera?
Failing Orangeburg tends to show up on camera as a wall breaking down in layers, sometimes with an egg-shaped, collapsed or broken section. One frame does not prove it. The full run, the building's age, records and any change in pipe material help confirm it. Expect to plan a replacement.
Read full answer: What does Orangeburg pipe look like on a sewer camera?Sources
- 2024 International Plumbing Code, Chapter 7 (Sections 717 and 718), as accepted in Phoenix
- City of Phoenix: Amendments to the 2024 International Plumbing Code
- City of Phoenix: 2024 IBC Chapter 1 Administrative Amendments (Sec. 105.2)
- U.S. EPA: Collection Systems O&M Fact Sheet, Trenchless Sewer Rehabilitation (EPA 832-F-99-032)
- IAPMO Standards Council decision, Docket 01-27 (2027 UPC)
- ICC CodeNotes: Replacement of Underground Building Sewers and Building Drains in the I-Codes
Related commercial services
Thinking About Lining?
Talk to a real dispatcher who knows commercial work. Upfront pricing before work starts, 24/7 for emergencies.

